ML17249A341
| ML17249A341 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 12/03/1979 |
| From: | Lainas G Office of Nuclear Reactor Regulation |
| To: | Ziemann D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17249A342 | List: |
| References | |
| TASK-05-13, TASK-5-13, TASK-RR NUDOCS 7912190057 | |
| Download: ML17249A341 (4) | |
Text
OEC 3 1979 0
~ QI1gg Rg QP~
DISTRIBUTION Central files NRC PDR PSB Reading MEMORANDUM FOR:
D. Ziemann, Chief, Operating Reactors Branch 82,.
DOR FROM:
G. Lainas, Chief, Plant Systems
- Branch, DOR
SUBJECT:
~
STEAM GENERATOR MATER HAMMER Plant Name:
Ginna Nuclear Plant Docket No.:
50-244 Responsible Branch:
ORB82 Project Manager."'.,Shea Reviewing Branch:
Plant Systems Review Status:
Complete
.- In response to Technical Assistance
- Request, TAC Number 7805, regarding water hammer in the Ginna feedwater
- systems, the Plant Systems Branch has completed its review and found that acceptable precautions are being taken to minimize the occurrence of water hammer in the feedwater p'iping.
The. basis for our conclusions are provided in the enclosed Safety Evaluation Report and our consultants'eport dated October 1979.
This completes our review of steam generator water hammer under TAC 7805.
Enclosures:
As stated cc w/enclosures:
See page-2 G. Lainas, Chief Plant Systems Branch Division of Operating Reactors I
g5 p-~Q orr>can SURNAME&
OATC~
PSB: DOR Sgajg j;:dg.
11/go/70 SL&
~ 1 ~ ~ ~ ~
~
~ ~
EA n
am 11/Q/79
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
P B:DOR arenas
~VS /79
~
~ 0 ~ ~ ~ ~ ~
~ ~i I
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
IQ?C POD 318 (97G) NRCM 0243 V 0 OOVONNMONT tNINTINO OrrICOI l 770 7II ~ 7 ~I
r
,5 J
~p,S RK0y Wp
+
0 o
~a*<<+
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 gEg g 1979 MEMORANDUM FOR:
D. Ziemann, Chief, Operating Reactors Branch 82, DOR FROM:
SUBJECT:
G. Lainas, Chief, Plant Systems
- Branch, DOR STEAM GENERATOR MATER HAMMER h
Plant Name:
Ginna Nuclear Plant Docket No.:
50-244 Responsible Branch:
ORB82 Project Manager:
J.
Shea Reviewing Branch:
Plant Systems Review Status:
Complete In response to Technical Assistance
- systems, the Plant Systems Branch has completed its review and found that acceptable precautions are being taken to minimize the occurrence of water hammer in the feedwater piping.
The bases for our conclusions are provided in the enclosed Safety Evaluation Report and our consultants'eport dated October 1979.
This completes our review of steam generator water hamer under TAC 7805.
Enclosures:
As stated G. Lainas, Chief Plant Systems Branch Division of Operating Reactors cc w/enclosures:
See page 2
DEC 3 1979 cc w/enclosures:
D. Eisenhut R. Tedesco B. Grimes S.
Hanauer E. Adensam W. Gammill J.
Shea E.
Reeves S.
MacKay V. Noonan Y. Huang