ML17249A341

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation Re Potential for Water Hammer in Feedwater Piping & Technical Evaluation by Eg&G
ML17249A341
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/03/1979
From: Lainas G
Office of Nuclear Reactor Regulation
To: Ziemann D
Office of Nuclear Reactor Regulation
Shared Package
ML17249A342 List:
References
TASK-05-13, TASK-5-13, TASK-RR NUDOCS 7912190057
Download: ML17249A341 (4)


Text

OEC 3 1979 0

~ QI1gg Rg QP~

DISTRIBUTION Central files NRC PDR PSB Reading MEMORANDUM FOR:

D. Ziemann, Chief, Operating Reactors Branch 82,.

DOR FROM:

G. Lainas, Chief, Plant Systems

Branch, DOR

SUBJECT:

~

STEAM GENERATOR MATER HAMMER Plant Name:

Ginna Nuclear Plant Docket No.:

50-244 Responsible Branch:

ORB82 Project Manager."'.,Shea Reviewing Branch:

Plant Systems Review Status:

Complete

.- In response to Technical Assistance

Request, TAC Number 7805, regarding water hammer in the Ginna feedwater
systems, the Plant Systems Branch has completed its review and found that acceptable precautions are being taken to minimize the occurrence of water hammer in the feedwater p'iping.

The. basis for our conclusions are provided in the enclosed Safety Evaluation Report and our consultants'eport dated October 1979.

This completes our review of steam generator water hammer under TAC 7805.

Enclosures:

As stated cc w/enclosures:

See page-2 G. Lainas, Chief Plant Systems Branch Division of Operating Reactors I

g5 p-~Q orr>can SURNAME&

OATC~

PSB: DOR Sgajg j;:dg.

11/go/70 SL&

OR

~ 1 ~ ~ ~ ~

~

~ ~

EA n

am 11/Q/79

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

P B:DOR arenas

~VS /79

~

~ 0 ~ ~ ~ ~ ~

~ ~i I

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

IQ?C POD 318 (97G) NRCM 0243 V 0 OOVONNMONT tNINTINO OrrICOI l 770 7II ~ 7 ~I

r

,5 J

~p,S RK0y Wp

+

0 o

~a*<<+

UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 gEg g 1979 MEMORANDUM FOR:

D. Ziemann, Chief, Operating Reactors Branch 82, DOR FROM:

SUBJECT:

G. Lainas, Chief, Plant Systems

Branch, DOR STEAM GENERATOR MATER HAMMER h

Plant Name:

Ginna Nuclear Plant Docket No.:

50-244 Responsible Branch:

ORB82 Project Manager:

J.

Shea Reviewing Branch:

Plant Systems Review Status:

Complete In response to Technical Assistance

Request, TAC Number 7805, regarding water haIIIIIer in the Ginna feedwater
systems, the Plant Systems Branch has completed its review and found that acceptable precautions are being taken to minimize the occurrence of water hammer in the feedwater piping.

The bases for our conclusions are provided in the enclosed Safety Evaluation Report and our consultants'eport dated October 1979.

This completes our review of steam generator water hamer under TAC 7805.

Enclosures:

As stated G. Lainas, Chief Plant Systems Branch Division of Operating Reactors cc w/enclosures:

See page 2

DEC 3 1979 cc w/enclosures:

D. Eisenhut R. Tedesco B. Grimes S.

Hanauer E. Adensam W. Gammill J.

Shea E.

Reeves S.

MacKay V. Noonan Y. Huang