REGULATORY FORMATION DISTRIBUTION SY M (RIDS)
ACCESSION NBR:7912120407 DOCRDATE: 79/11/30 NOTARIZED:
NO FACIL:50 ?04 Robert Emmet Ginna Nuclear P,lant'nit 1P Rochester G
AUTH,NAME AUTHOR AFFILIATION WHITE it ~ D ~
Rochester Gas L Electric Corp+
REC IP R NAME RECIPIENT AFFILIATION ZIEMANNED,L, Operating Reactors Branch 2
DOCKET 05000249
SUBJECT:
Responds to NRC request for structural model of containment structure
& internals for use in SEP seismic analysis, Advises that appropriate sketches 8 models have been sent to LLL,Application for withholding info encl.
DISTRIBUTION CODE:
AOOIS COPIES RECEIVED:LTR ENCL 9 SIZE:
TITLE: General Distribution for after Issuance of Operating Lic NOTES: l~ ~ ~kdPlME'IP C
MP~~d'/ATE~
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME L'TTR ENCL ID CODE/NAME LTTR ENCL ACTION:
05 BC 48 W~
7 7
INTERNAL:
EG 15 CORE PERF BR 18.REAC SFTY BR
?0 EEB 22 BRINKMAN OELD EXTERNAL; 03 LPDR 23 ACRS 1
1 2
2 1
1 1
1 1
1 1
1 1
0 1
1 16 16 02 NRC PDR 10 TA/EDO 17 ENGR BR 19 PLANT SYS BR 21 EFLT TRT SYS EPB~DOR g~p 04 NSIC 1
1 1
1 1
1 1
1 1
1 1
8 9
1 1
V~
TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL
0 C
4
~
~
~
~
~
pl p
zzztzz zan AND lrrzi~rrrll(IE exist(z ROCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR.
VICE PRESIDENT TELEPHONE ARCA COOK TID 546.2700 November 30, 1979 Director of Nuclear Reactor Regulation Attention:
Mr. Dennis L. Ziemann, Chief Operating Reactors Branch No.
2 U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Systematic Evaluation NRC use of the Containment and Internals Structural Model R.E.
Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Ziemann:
Mr.
Tom Cheng of the NRC-SEP staff has requested that RG&E provide our structural model of the Ginna Containment Structure and Internals to Lawrence Livermore Laboratory (LLL) for their use in seismic analysis for the SEP Program.
Specifically, LLL will use our model to develop floor response spectra to use in their seismic evaluation of equipment and systems inside containment.
We have agreed to provide this information for LLL's use providing that we are kept aware of how the model's being used and providing that we can review LLL's input data and output, from the model, as
- required, to assure that all parties agree on the proper use of the model.
It should be noted that the design review for this
- model, which has been developed as part of our Seismic Upgrade
- Program, has not yet been completed by our A/E (Gilbert Associates) and as such the model must be considered "preliminary" and used accordingly.
Accordingly, by copy of this letter, the following information is being forwarded to the attention of Mr. Robert Murray at Lawrence Livermore Laboratory:
Sketches of the finite element model of interior structures.
2.
Model of containment building shell showing the spring which connects the'hell and interior structures.
3.
NSSS model showing connection to ground and interior structure finite element model.
4.
Sketch showing relationship of coordinate system used in the finite element model (GAI Structural) and plant North.
Pool
'7 912 120 ~Y/ p///
~
~
h,l H,
L<
l lt 4 J
ROCHESTER GAS AND ELECTRIC CORP.
DATE November 30, 1979 Mr. Dennis L. Ziemann SHEET NO.
5.
Card deck listing of finite element model of containment building and interior structure in program STARDYNE input. format.
6.
Card deck as described in Item 5.
The reactor coolant loop model (Item 3 above) included with the building model is a simplified dynamic representation of the reactor coolant loop piping, components and supports.
The model is included with the containment structure only to account for the dynamic interaction effects of the primary loop on the generation of floor response spectra and should be used for no other purpose.
The same information with the exception of item 6 is being transmitted to Mr. Tom Cheng of the SEP Staff.
It should be noted that this information is considered to be proprietary information and should not be reproduced or placed in the Public Document Room.
An affidavit signed by Gilbert Associates Incorporated, who is the owner of the material, is enclosed.
Should you have any questions in this regard, please feel free to call us.
P L. D. White, Jr.
Enclosure xc:
Mr. Robert Murray, Lawrence Livermore Labs w/enc Mr. Ton Cheng, NRC-SEP Branch w/enc
~
~
9~ i'1'l
.,'< a U.
)
J' 4
~
14
APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE (Pursuant to 10 C.F.R. 2.790 (1979))
5tbert
/Commonwealth
APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE (Pursuant to 10 C.F.R. 2.790 (1979))
l.
On November 19, 1979, Gilbert Associates, Inc.,
a Delaware corporation with its principal offices in Berks County, Pennsylvania (hereinafter referred to as GAI), submitted to the U.S. Nuclear Regulatory Commission (hereinafter referred to as the NRC) proprietary information regarding the sesimic analysis of the containment building and containment interior structures of the R.E. Ginna Nuclear Power Station, Unit 1 in Rochester, New York.
The information included:
a.
Sketches of the finite element mathematical model of the containment interior structures.
b.
Model of the containment building shell showing the spring connecting the containment shell and the interior structures.
c.
NSSS model showing its connection to the ground and the interior structure finite element model.
d.
Computer card deck listing of the finite element mathematical model of containment building and interior structures in program STARDYNE input format.
2.
By this application, submitted to the NRC at the same time as the above information, GAI respectfully requests that the above proprietary information be withheld from public disclosure.
This request is based upon the following reasons:
a.
The above information was developed primarily by GAI and has been and is being held in confidence by GAI.
b.
Detailed information used in the seismic analysis of specific nuclear power plant structures is of a type customarily held in confidence. It is felt that in this case there exists a rational basis for withholding the information due to the unique procedure used in the mathematical discretization of the structure as part of the analysis procedure.
Qbere /Commonwealth
c.
GAI has transmitted the above listed information in confidence to the NRC, and request that it be handled and reviewed in a confidential manner.
d.
The above listed information is not available in public sources.
e.
. Public disclosure of the above information will adversely affect GAI's competitive position with respect to the subject thereof.
The final mathematical model used in the seismic analysis was developed after considerable effort in trying to model efficiently, accurately, and economically all relevant structural components having an effect upon the seismic response of the subject structures.
Public disclosure of the information would enable GAI's competitors to develop similar modeling techniques for the seismic analysis of nuclear power plant containment building and containment interior structures in substantially less time and at substantially less cost than the competitors might otherwise expend.
Qbert /Commonwealth
,a ly
~
~
COMNONWEALTH OF PENNSYLVANIA SS.:
COUNTY OF BERKS B.G. Hooten, being duly sworn according to law, deposes and says that he is a Vice President of Gilbert Associates, Inc.,
a Delaware corporation with its principal offices in Berks County, Pennsylvania, and that the facts set forth in the above application are true, to the best of his knowledge and belief.
.z~4v Date
.,t/
Sworn and subscribed before me, this.l day of z>,...
, 1979,
~.
r Grtbert /Commonwealth IAVAL. FINN Notar> Pu!:l.'o, Pea"iro, Ber!;s Co.
My Comm'.s-lon Expires A!:gusl 20. 1903
p a