ACCQSIO'N NBR:7910?40570 DOC,DATE: 79/10/18 NOTARIZED NO FAGi L:5044 nas Vi ra
'UTH.
NAME AUTHOR A F F ILIATI ON 6/>VS, WHITEi L,D.
Rochester Gas L Electr ic Cor p.
REC IP ~ NA(9E RECIPIENT AFFILIATION GRIE Rg 8 ~ H, Region ii Philadelphia~
Office of the Director DOCKET 05000/44
SUBJECT:
Discusses 791008-13 tendon insp 8 lift-offverification tests. Results indicated good agreement between predicted 8
actual rate of loss. Procedure for tendons being developed to bring tendons back within Tech Specs limits.
DISTRIBUTION CODE:
A001S COPIES RECEIVED:LTR
~ ENCL
~
SIZE:
TITLE: General Distribution for after Issuance of Operating l ic NOTES:
~MMMWMMMWMMMMMWMMMWMS+MMMWMm 0
RECIPIENT ID CODE/NAME ACTION:
05 BC INTERNAL:
GM 12 ISE 15 CORE PERF BR 18 REAC SFTY BR 20 EEB 22 BRINKMAN EXTERNAL: 03 LPDR 23 ACRS COPIES LTTR ENCL
'7 1
2 1
1 1
1 1
16 1
RECIPIENT ID CODE/NAME 02 NRC PDR 14 TA/EDO 17 ENGR BR 19 PLANT SYS BR 21 EFLT TRT SYS OELD 04 NSIC COPIES LTTR ENCL 1
11' 1
1 OCT 86 'f979 0
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 38 ENCL qA Pl
I I
1 4
N K
pl
0
~,",'lifiPZS,'1/iii/Jii
,,"ill/I/!//j7I/I,"I/II!I/i/
ROCHESTER GAS AHD ELECTRIC CORPORATION
~
e4 ha i 4
~ 44
'I
,5
~1411 89 EAST AVENUE, ROCHESTER, H.Y. 14649 LEON D. WHITE, JR.
VICE PRESIDENT TELEPHONE AREA CODE TI6 546.2700 October 18, 1979 Mr. Boyce Grier Director, Region I Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406
Subject:
Tendon Inspection and Lift-OffVerification R.
E. Ginna Nuclear Power Plant Docket No. 50-$ 44
Dear Mr. niemann:
A tendon inspection and lift-offverification test was performed at the R.
E. Ginna Nuclear Power Plant during the period of October 8 through October 13, 1979.
For the test, twenty-two (22) tendons approximately equally spaced around the containment structure were selected.
Of the sample group selected, fourteen (14) tendons had previously been tested in June of 1977 and this group met the criteria established in the Technical Specification.
The October 1979 test included the following:
2.
visual inspection of each tendon tested lift-offmeasurements 3.
4 ~
6% overstress verification observation for an indication of a broken wire or wires during all phases of testing 5.
the total de-tensioning and re-tensioning of one tendon was completed with visual observation of the connection between the rock anchor and tendon being made during testing 6.
withdrawal of an unbonded surveillance wire from three tendons T9IOS40 5 7 ~
>v
~k"
~@r 4'
,h(
- ,l)
, t(
ROCHESTER GAS AND ELECTRIC CORP.
October 18, 1979 her.
Boyce Grier SHEET NO.
The results of the tendon inspection and verification test are as follows:
1.
The average stress of the twenty-two tendons tested was 143,475 PSI which is
.4% below the Technical Specification limit of 144,000 PSI (60% of ultimate strength).
2.
3.
There was no indication of tendon wire failure on initial inspection, during lift-off, at 6% over stress, after reseating, or with the totally de-tensioned re-tensioned tendon throughout the entire test.
One (1) surveillance wire was withdrawn from three (3) specified tendons for future testing.
The wires were free of any visible corrosion for the entire length and no galls or deformed sections were found in these wires.
Therefore, with reference to the Technical Specification which states that, "The specified acceptance criteria are such as to alert attention to the situation well before the tendon load-carrying capabilities would deteriorate to a point that failure during a design basis accident might be possible.
Thus the cause of the incipient deterioration could be evaluated and corrective action studied without need to shut down the reactor."
The Technical Specification provides two acceptance criteria, that less than 5% of the total wires be broken and that. the stress level in the tendons be above 144,000 psi.
Experience with vertical tendons indicates that tendon wires seldon, if ever, break.
It also indicates that when wires break it is usually during tensioning.
Visual examination of the tendons coupled with past experience would lead to a high degree of certainty that no broken wires exist, although a
5% allowance for broken tendons is made in the design.
An evaluation of the data from this test and all previous surveillances indicates that although the actual losses exceed those predicted using current techniques (NRC Draft RG 1.35.1) the current rate of loss is in reasonable agreement.
The current deficiency in tendon stress of
.4% is predicted to increase to
.6% in the next year.
Based on:
1.
Good agreement between predicted and actual rate of
- loss,
>v
)
Cg ~
ROCHESTER GAS AHD ELECTRIC CORP.
October 18, 1979 Mr. Boyce Grier SHEET HO.
3 2.
Lack of any evidence of wire breakage or corrosion, 3.
The 5% allowance for broken wires in the design, and 4.
The very minor extent of the variation from the Technical Specification, currently and in the near future, we conclude that the situation is acceptable over the near term.
However, to bring the tendons back within the Technical I
Specification limits, a tendon re-tensioning procedure is currently being developed by the structural designer of the plant., After
- issuance, review, and approval of the procedure, a schedule for re-tensioning the tendons will be developed for completion of the work as soon as practical.
If there are any questions regarding this information, please contact us.
Very truly yours, L. D. White, Jr.
LDN:np xc:
Mr. Dennis L. Ziemann Chief Operating Reactors Branch No.
2