ML17244A804

From kanterella
Jump to navigation Jump to search
Advises That Util Failed to Prepare Annual Rept Re Changes to Station Facilities & Procedures Per 10CFR50.59 Requirements.Rept Will Be Submitted by 790931
ML17244A804
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/31/1979
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 7909100065
Download: ML17244A804 (1)


Text

i

/

rA ROCHESTER GAS AND EL EC TRIC CORPORATION o

C1nTSe L

~I( ~

d

~

141k 11A11 89 EAST AVENUE, ROCHESTER, N.Y. I4649 LCON D. WHITE. JA.

VICC RRCSIDCNI ICCCPRDNC ARCA CDDC 7IC 546 2700 July 31, 1979 Mr. Boyce H. Grier, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19496

Dear Mr. Grier:

Due to confusion arising from a change of Plant Technical Specifications in eliminating its requirements for an annual report we neglected to attend to preparation of an annual report for changes to station facilities and procedures as required by 10 CFR 50.59.

Because of the press of the annual refueling maintenance

shutdown, the TMI issue, and the present outage for feedwater elbow replacement the preparation of this weport did not receive the attention which would have been necessary for its submittal within the allowable time frame.

We plan,

however, to submit the report by August 31, 1979.

r Very truly yours, Leon D. White, r.

Vice President LDW:mep

>9091 00~+