ML17244A804
| ML17244A804 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 07/31/1979 |
| From: | White L ROCHESTER GAS & ELECTRIC CORP. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 7909100065 | |
| Download: ML17244A804 (1) | |
Text
i
/
rA ROCHESTER GAS AND EL EC TRIC CORPORATION o
C1nTSe L
~I( ~
d
~
141k 11A11 89 EAST AVENUE, ROCHESTER, N.Y. I4649 LCON D. WHITE. JA.
VICC RRCSIDCNI ICCCPRDNC ARCA CDDC 7IC 546 2700 July 31, 1979 Mr. Boyce H. Grier, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19496
Dear Mr. Grier:
Due to confusion arising from a change of Plant Technical Specifications in eliminating its requirements for an annual report we neglected to attend to preparation of an annual report for changes to station facilities and procedures as required by 10 CFR 50.59.
Because of the press of the annual refueling maintenance
- shutdown, the TMI issue, and the present outage for feedwater elbow replacement the preparation of this weport did not receive the attention which would have been necessary for its submittal within the allowable time frame.
We plan,
- however, to submit the report by August 31, 1979.
r Very truly yours, Leon D. White, r.
Vice President LDW:mep
>9091 00~+