ML17244A796
| ML17244A796 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 08/29/1979 |
| From: | White L ROCHESTER GAS & ELECTRIC CORP. |
| To: | Ziemann D Office of Nuclear Reactor Regulation |
| References | |
| TASK-03-02, TASK-03-03.A, TASK-03-07.B, TASK-RR NUDOCS 7909050379 | |
| Download: ML17244A796 (4) | |
Text
~ w
~
44aa SUBJECT; Comments on NRC evaluation of SEP
~ Specific version of Reg Guide 1, 14 used as basis for evaluating flywheel inservice insp program should be clearly identified, DISTRIBUTION CODE ~
A035S COPIES RECEIVED:LTR + ENCL g SIZE:
TITLE; SEP Topics NOTES;
~.'
cS//APAKKH.
- g. Nd FMH6' ee oem meeawmwceaawmwweewp mwCeie eopry~eoyeywo m~m~~ere>>
<<fwZwmeyeewyeeeweaeemwmeoyeeeworm>>woewwoao
- g. A ryazr REC IP IENT COPIES REC IP I ENT COPIES ID CODE/NAME L'TTR ENCL ID CODE/NAME LTTR ENCL ACTION:
19 BC OR8'EGUlATOR INFORMATION DISTRIBUTION S" TEM (RIDS)
ACCESSION NBR:7909050379 DOC,DATE: 79/08/29 NOTARIZED:
NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant~ Unit 1~ Rochester G
05000244 AUTH BYNAME AUTHOR AI FILIATION IIHITE g L ~ D ~
Rochester Gas 8 Electric Corp.
RECIP NAME RECIPIENT AFFILIATION ZIEMANN<D,LE Operating Reactors Branch 2
INTERNAL:
1 RE PERF 14 REAC SFTY 16 EEB 18 BRINKMAN SEP BR EXTERNAL: 23 ACRS 7
1 1
1 1
1 3
3 16 16 1
1 10 TA/EDO 13 ENGR BR 15 PLANT SYS BR 17 EFFT TRT SYS 2
NRC PDR 8 ILE 3
LPDR so~
~
qg9 TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL
0 0
r I1 k
,1 V
it 0
~
t
(
a lt f
jt A
v I,
w
( H"
~)
V P
4
) ',i 1
t V
If
)
'1 l
H ll 0 ~
'P
~ \\
~ 4 g~
f %
~ I M
WW0 %y~
P F\\<<
'I
%k K
~
gh~
1 F
t ",i'll//'IIEiSVi787 A NO sIgiyrjj(vz/ iiutssizz uzl~dl iinrzzz ROCHESTER GAS AND ELECTRIC CORPORATION o
LlalEwfJAN+.
I 1Oa<<'l
~ '1TA11 S9 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR.
VICE PAESIDKNT TELEPHONE ARCA CODC 714 S46-2700 August 29, 1 9 79 Director of Nuclear Reactor Regulation Attention:
Mr. Dennis L ~
- Ziemann, Chicf Operating Reactors Branch No.
2 U. S ~ Nuclear Regulatory Commission Washington, D. C ~
20555
Subject:
SEP Topic III-1 0
~ B Pump Flywheel Integrity Dear Mr.
Ziemann:
We have reviewed the NRC '
8/1 5/79 evaluation of this SEP topic for Ginna and have only minor comments
~
The evaluation should point out which version of Regulatory Guide 1 ~ 1 4 forms the basis for the Ginna flywheel ISI program (Aug.
1 975 ).
Also, we feel that the last sentence of the eva 1uation would be c 1earer if worded as follows:
"We conclude that the integrity of the flywhee 1 for the reactor coolant pump will be adequate ly maintained
- by the Ginna inservice inspection
- program, which is in compliance with the recommendations of Regulatory Guide 1 ~ 14"
~
Sincerely,
~pi L. D ~ White, Jr.
T909050379'
t
,i N pr I