ML17244A490
| ML17244A490 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 04/30/1979 |
| From: | White L ROCHESTER GAS & ELECTRIC CORP. |
| To: | Ziemann D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7905070486 | |
| Download: ML17244A490 (7) | |
Text
RESUL'RY INFORMATION DISTRIBUTE SYSTEM (RIDS)
ACCESSION NBR:7905070986 DOC ~ DATEo 79/09/30 NOTARIZED'O FACIL:50 204 ROBERT EMMET GINNA NUCLEA'R PLANTS UNIT 1 t ROCHESTER G
AUTH BYNAME AUTHOR AFFILIATION NHITEFL ~ D>>
ROCHESTER GAS'8 ELECTRIC CORPS REC IP ~ NAME RECIPIENT AFFILIATION
'IEMANNPD ~
OPERATING REACTORS BRANCH 2 SUBJECT; RESPONDS TO REQUEST FOR ADDL INFO IN 790210 SER RE PIPING 8
DUCT PENETRATIONSPCONST'OINTS DETECTOR 'TESTINGS ELECTRICAL CABLE INSULATION~
DOCKET ¹ 05000204 DISTRIBUTION CODE:
A0060 COPIES RECEIVED:LTR i ENCL l SIZE:
TITLE: FIRE PROTECTION INFORMATION (AFTER ISSUANCE OF OP,LIC ~ )
NOTES:Z~: ~; RluSO> ~ ~.
8OCn~ySiE RECIPIENT COPIES RECIPIENT ID CODE/NAME LTTR ENCL ID CODE/NAME ACTION:
05 BC C>4H M4
~ 0
)lJ" )rl
)M i
COPIES LTTR ENCL INTERNAL:
0 09 E
12 AUXIL SYS, BR 19 WAMBACH 21 AD SYS/PROJ EXTERNAL: 03 LPDR 22 ACRS 1
1 2
2 2
2 1
1 1
1 1
1 16 16 02 NRC PDR li TA/EDO 16 PLANT SYS BR 20 MURANAKAtR' OELD oe NSIC 1
1 1
5 5
1 1
1 0
1 1'ly 8
TOTAL NUMBER OF COPIES REQUIRED'TTR 38 ENCL 37
~
4
t llfllillillii//
ill/ill/ill/
/
AHP
/////yg~i///////////I/
~! ZiiVu~EN'///////////I ROCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE. JR.
VICE PRESIDENT TELEPHONE AREA CODE TIS 546-2700 April 30, 1979 Director of Nuclear Reactor Regulation Attention:
Mr. D. Ziemann, Chief Operating Reactors Branch 42 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, DC 20555 Re:
Fire Protection at R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Ziemann:
Additional information was requested for certain items in the Safety Evaluation Report dated February 14, 1979.
The items scheduled for response in April 1979 are contained herein.
Item 3.1.24 Piping and Duct 'Penetrations:
Piping and duct penetration seals of fire barriers will be upgraded to fire resistance ratings commensurate with the hazards on both sides of the barriers.
ASTM E-119 fire test reports for comparable penetrations will be on file to verify seal adequacy.
Item 3.1.25 Construction Joints:
The'onstruction joints between the containment and the surrounding buildings will be modified to provide fire resistance commensurate with the hazards in the area.
The existing filler material will be covered on both sides with a flame retardant coating or replaced with silicone foam or silicone rubber strips.
Item 3.1.43 Detector Testing:
After the design of fire detection systems utilizing the NFPA 72 series as a guide, the following will be done:
.Portable smoke detectors will be installed in locations which are to be tested for adequacy.
Smoke or combustion products will be released by a suitable generator at, the locations of postulated fires.
The smoke generator will not constitute a fire hazard in itself.
iBOSOP~yg(
V l4 ll'ly I
ROCHESTER GAS 4ND ELECT CORP.
DATE April 30, 1979 To Mr. D. Ziemann, Chief SHEET NO.
The adequacy of the detector locations will be determined utilizing an acceptable time differential between smoke generation and detection.
If relocation or addition of detectors is found necessary, the adequacy of the new locations will be verified by test.
Item 3.2.4 Electrical Cable Insulation:
The attached table lists the cable insulation types and quantities used in the Ginna Nuclear Plant.
The combus-tion products for these insulation materials are listed in generic test reports published by manufacturers and test laboratories.
After a review of these materials it is the Rochester Gas
-and Electric Corporation position that none of the insulation produces combustion products of an unusual or significantly hazardous nature.
Very truly yours,
~
~
~
~
~
I D. Whit
, Jr.
k
TABLE CABLE INSULATION QUANTITY CABLE DESCRIPTION CLASS (FEET)
INSULATION APPLICATION MEETS VERTICAL FLAME TEST PER IEEE 383
/ UL 44 Power Power Power Power Power Control Control Control Thermocouple Thermocouple Triaxial Instrument Instrument Instrument Instrument Control Power 4kv 600V 600V 600V 600V 600V 600V 600V 600V 600V 600V 600V 600V 600V 600V 600V 7,235 35,330 23,620 2,320 113,800 43,000 586,000 22,500 69,000 30,000 18,000 35,000 250,000 55,000 140,000 500 2,000 HT Kerite HT Kerite HT Kerite HT Kerite HT Kerite FR Kerite PVC (General Cable)
TH@ (PVC Type)
PVC Silicone Rubber PVC Silicone Rubber PVC Silicone Rubber PVC Vulkene Silicone Rubber Throughout Plant Non Safeguards Circuits Safeguards Circuits Outside Containment Safeguards Circuits Inside Containment Non Safeguards Circuits Safeguards Circuits Inside Containment Non Safeguards Circuits Inside Containment-All Circuits Outside Containment Lighting Circuit Incore Instrumentation Incore Instrumentation Throughout Plant Electric Control Inside Containment Electric Control Outside Containment Computer S Inst. Cables Inside Containment Computer 6 Inst. Outside Containment Status Iights Press.
Heaters Yes/
Yes/
Yes/
Yes/
Yes/
No/Yes No/Yes No/Yes Yes/
No/Yes Yes/
No/No Yes/
No/No Yes Yes/