ML17244A248

From kanterella
Jump to navigation Jump to search
Fuel Cycle 21, Core Operating Limits Report, Revision 36
ML17244A248
Person / Time
Site: Pilgrim
Issue date: 08/28/2017
From: Perkins E
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17244A211 List:
References
2.17.061
Download: ML17244A248 (51)


Text

{{#Wiki_filter:* ~Entergy Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth , MA 02360 August 28, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Pilgrim Fuel Cycle 21, Core Operating Limits Report, Revision 36 Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER 2.17.061

Dear Sir or Madam:

In accordance with Pilgrim Nuclear Power Station (PNPS) Technical Specification 5.6.5, Entergy Nuclear Operations, Inc. submits the attached Fuel Cycle 21 , Core Operating Limits Report, Revision 36 , which provides cycle-specific limits for operating PNPS during Cycle 21. PNPS requests that Attachment 2 to this letter, which contains Trade Secret Information, be withheld from public disclosure in accordance with 10 CFR 2.390(b)(1 ). If you have any questions or require additional information, please contact me at (508) 830-8323 . There are no regulatory commitments contained in this letter. Sincerely, Everett P ~\1i_c. ~ ~ Manager, Regulatory Assurance EPPmp This letter contains Proprietary Information - Attachment 2 is withheld from public disclosure per 10 CFR 2.390

Entergy Nuclear Operations, Inc. Letter No. 2.17.061 Pilgrim Nuclear Power Station Page 2 of 2 Attachments :

1. GNF letter,KGO-ENO-HK1-17-081, Kimberly O'Connor (GNF) to Nela Szwarc (Entergy) , entitled "Pilgrim Nuclear Power Station Cycle 20 Core Operating Limits Report (COLR) Revision 33 and Cycle 21 COLR Revision 34 , 35 , and 36
             - Proprietary and Non-Proprietary Versions ," July 28 , 2017 .
2. Enclosure 10, KGO-ENO-HK1 081 , Pilgrim Nuclear Power Station Cycle 21 Core Operating Limits Report, Revision 36 , GNF Proprietary Information - Class II (Internal)
3. Enclosure 11 , KGO-ENO-HK1-17-081, Pilgrim Nuclear Power Station Cycle 21 Core Operating Limits Report, Revision 36 , Non-Proprietary Information - Class I (Public)
4. Enclosure 12, KGO-ENO-HK1 081 , Affidavit for Enclosure 10, Pilgrim Nuclear Power Station Cycle 21 Core Operating Limits Report, Revision 36 ,

GNF Proprietary Information - Class II (Internal) cc: Mr. Daniel H. Dorman Regional Admin istrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia , PA 19406-2713 Mr. John Lamb , Senior Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 8 B1A Washington , DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station Mr. John Giarru sso Jr. Planning , Preparedness & Nuclear Section Chief Mass. Emergency Management Agency 400 Worcester Road Framingham , MA 01702 This letter contains Proprietary Information -Attachment 2 is withheld from public disclosure per 10 CFR 2.390

Attachment 1 Letter Number 2.17.061 GNF letter,KGO-ENO-HK1-17-081, Kimberly O'Connor (GNF) to Nela Szwarc (Entergy), entitled "Pilgrim Nuclear Power Station Cycle 20 Core Operating Limits Report (COLR) Revision 33 and Cycle 21 COLR Revision 34, 35, and 36 - Proprietary and Non-Proprietary Versions," July 28, 2017

Proprietary Notice This letter transmits proprietary information in accordance with 10 CFR 2.390. Upon the removal of Enclosures 1, 4, 7, and 10, the balance of the letter may be considered non-proprietary. GNi= Global Nuclear Fuel A .lninl Vftntur" nf r.F Tn~hiha A Mitarhi Kimberly O'Connor Global Nuclear Fuel - Americas, LLC GNF Customer Project Manager Castle Hayne Road , Wilmington , NC 28401 KGO-ENO-HKl-17-081 July 28, 2017 Ms. Nela Szwarc cc: Lynn Leatherwood Entergy Nuclear Northeast Gary James 440 Hamilton Road White Plains, NV 10601

SUBJECT:

Pilgrim Nuclear Power Station Cycle 20 Core Operating Limits Report (COLR) Revision 33 and Cycle 21 COLR Revision 34, 35, and 36 - Proprietary and Non- Proprietary Versions

REFERENCES:

1. Email from Szwarc, Kornelia (Entergy) to O'Connor, Kimberly (GNF),

Subject:

FW: COLR Proprietary/Non -Proprietary Versions - Mail 1 of 4, July 25, 2017, 12:52 pm .

2. Entergy Nuclear Operations, Inc. Fi xed Services Agreement No. 50014434 for the Supply of Fuel and Fuel Related Work to PNP with Global Nuclear Fuel. as amended

("Fuel Contract"). Ms. Szwarc, By Reference l, Global Nuclear Fuel - Americas, LLC (GNF) was requested to review and mark the proprietary content in the Pilgrim Nuclear Power Station (PNPS) Cycle 20 Core Operating Limits Report (COLR), Revision 33 and the PNPS Cycle 21 COLR Revisions 34, 35, and 36, prepare a corresponding non-proprietary version of each COLR, and provide an affidavit supporting the basis for the proprietary determination for each COLR. Enclosed are the COLRs marked to indicate the GNF proprietary information, corresponding non-proprietary versions of the COLRs, and affidavits supporting the basis for the proprietary determination. GNF's review is limited to a proprietary determination. GNF did not review the content of the COLRs for techn ical accuracy. Enclosures l, 4, 7, and 10 of this transmittal contain GNF proprietary information that should be handled in accordance with the proprietary information provisions contained in the Fuel Contract listed above (Reference 2). GNF customarily maintains this information in confidence and withholds it from public disclosure. The affidavits provided in Enclosures 3, 6, 9, and 12 identify that the designated information in Enclosures l, 4, 7, and 10 have been handled and classified as proprietary to GNF. The designated information is suitable for submittal to the NRC when accompanied by the attached affidavits. GNF hereby requests that the designated information be withheld from publi c disclosure in accordance with the provisions of 10 CFR 2.390 and 9.17. Non-proprietary versions of the GNF info rmation is provided in Enclosures 2, 5, 8, and 11, respectively.

KGO-ENO-HKl-17-081 Page 2 of 3 GNF requests that any transmittal of this proprietary information to the NRC be accompanied by the enclosed affidavit and proprietary notice. In order to maintain the applicability of the affidavit and to meet the requirements of 10 CFR 2.390, the transmittal to the NRC should:

1) faithful ly reproduce the proprietary information,
2) preserve the proprietary annotations. and
3) include, at the top of the transm ittal letter or in the subject line, the words similar to "Proprietary Information." If a cover sheet for enclosures is used, then the cover sheet for the enclosure containing the proprietary information should also state "Proprietary Information."

Based on past discussions with the . NRC, GNF has been encouraged to request its customers to provide a paragraph similar to the following paragraph in the customer letter transmitting proprietary information to the NRC in order to clearly indicate the proprietary nature of the information and to document the source of the proprietary information as indicated in the GNF affidavit.

        "The enclosed documentation contains proprietary information as defined by 10 CFR 2.390.

GNF, as the owner of the proprietary information, has executed the enclosed affidavit. which identifies that the enclosed proprietary information has been handled and classified as proprietary, is customarily held in confidence, and has been withheld from public disclosure. The proprietary information was provided to Entergy in a GNF transmittal that is referenced by the affidavit. The proprietary information has been faithfully reproduced in the enclosed documentation such that the affidavit rema ins applicable. GNF hereby requests that the enclosed proprietary information be w ithheld from publ ic disclosure in accordance with the provisions of 10 CFR 2.390 and 9.17. A non-proprietary version of the documentation is also provided." A signed copy of this letter is included in PLM Specification 004N3963 RO. All information should be handled in accordance with the proprietary information provisions contained in the Fuel Contract listed above in Reference 2. Please let me know if you have questions or comments regarding this transmittal. Sincerely, Kimberly O'Connor GNF-A Customer Project Manager

Enclosures:

1. Pilgrim Nuclear Power. Station Cycle 20- Core Operating Limits Report, Revision 33 -

Prop rietary

2. Pilgrim Nuclear Power Station Cycle 20 Core Operating Limits Report, Revision 33 -

Non-Proprietary

KGO-ENO-HKl-17-081 Page 3 of 3

3. Affidavit for Enclosure 1
4. Pilgrim Nuclear Power Station Cycle 21 Core Operating Limits Report, Revision 34 -

Proprietary

5. Pilgrim Nuclear Power Station Cycle 21 Core Operating Limits Report, Revision 34 -

Non-Proprietary

6. Affidavit for Enclosure 4
7. Pilgrim Nuclear Power Station Cycle 21 Core Operating Limits Report, Revision 35 -

Proprietary

8. Pilgrim Nuclear Power Station Cycle 21 Core Operating Limits Report, Revision 35 -

Non-Proprietary

9. Affidavit for Enclosure 7
10. Pilgrim Nuclear Power Station Cycle 21 Core Operating Limits Report. Revision 36 -

Proprietary

11. Pilgrim Nuclear Power Station Cycle 21 Core Operating Limits Report, Revision 36 -

Non - Proprietary

12. Affidavit for Enclosure 10

Attachment 3 Letter Number 2.17.061 1, KGO-ENO-HK1-17-081, Pilgrim Nuclear Power Station Cycle 21 Core Operating Limits Report, Revision 36 , Non-Proprietary Information - Class I (Public)

ENCLOSURE11 KGO-ENO-HK1-17-081 Pilgrim Nuclear Power Station Cycle 21 Core Operating Limits Report, Revision 36 Non-Proprietary Information - Class I (Public) INFORMATION NOTICE This is a non-proprietary version of Enclosure 10 of KGO-ENO-HK1-17-081 , which has the proprietary information removed . Portions of the document that have been removed are indicated by white space inside an open and closed bracket as shown here (( )).

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE: G4.02 (CYCLE 21) LBDCR2016-031 Documents Approvals Information Notice This is a non-proprietary version of the Pilgrim Nuclear Power Station Core Operating Limits Report for Cycle 21 , whi.ch has GNF proprietary information removed. Portions of the document that have been removed are indicated by white space inside open and closed bracket as shown here (( )). Cycle 21 COLR Revision 36 Page 1 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERA TING LIMITS REPORT RTYPE : G4.02 TABLE OF CONTENTS TITLE & COVER PAGE .. ........ .. ...... .... .... .. ... .. .. ...... ... .. ........ ...... ............. .. ........ ........... .. .. .......... . 1 TABLE OF CONTENTS ... ...... ......... .... .. .......... .......... ........... .......................... ... ..... ......... ........... 2 RECORD OF REVISIONS .... ..... .... ......... ...... ............. ... ....... ....... .. .. .... ............ ............ ... ........ ... . 3 LIST OF TABLES .. .... ... .............. .......... ....... ... ...... ...... ....... .. .. ... ..... .. ... ... ....... ........... ... ..... ..... ..... .4 LIST OF FIGURES .. ... .... ............................... ......... ... .. .... .... ....... ...... ... .... ....... ............................ 5

1.0 INTRODUCTION

............................. .............. .......... ........................ .. ... ......... ... ... ...... ...... 6 1.1   Stability Option 1-D Exclusion Region and Buffer Zone ................................................. 6 2.0    INSTRUMENTATION TRIP SETTINGS ..... .... ...... ... .... ... .. .. .............. .... ... .. ... ........... ... .... . 7 2.1   APRM Flux Scram Trip Setting (Run Mode) ........ ......... ....... .. ...... .... ........ ........ .. .... ..... ... 7 2.2   APRM Rod Block Trip Setting (Run Mode) ..... .. ..... ............ .. .. ...... ... ..... ...... .. ... .... .. ...... . 12 2.3   Rod Block Monitor Trip Setting ... ............................... .. .... ......... ..... .. ..... .. ......... .. .... ... ... . 12 3.0    CORE OPERATING LIMITS .. .. ... ... .... ........... .. .. .. .. ..... ..... .. ... .... .. .. ..... ... .... ..... ... ....... ....... 17 3.1   Maximum Average Planar Linear Heat Generation Rate (MAPLHGR) .. ... ...... .. ........ ... 17 3.2   Linear Heat Generation Rate (LHGR) ....... .. .. ..... ..... ... .. ... ..... .. ... .. .... ...... ...... .. .... .. .... ..... 21 3.3   Minimum Critical Power Ratio (MCPR) ........................................................................ 25 3.4   Power/Flow Relationship During Power Operation ... ..... .. ... .... ........... .. ..... .... .. ...... ........ 33 4.0    REACTOR VESSEL CORE DESIGN .... ..... ......... .. ............ ... ....... ..... .. .... ........... .. ....... ... 36

5.0 REFERENCES

... .... ... .... .... ..... ..... .. .................. ... ..... ..... ... .. ... .... ... .... .... ...... ...... .... ....... .. . 38 Cycle 21 COLR Revision 36                                                                                                                     Page 2 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE: G4.02 RECORD OF REVISIONS Revision Effective Date Description 10A Effective upon final approval Applicable for use during Cycle 10 Operation 11A Effective upon final approval Applicable for use during Cycle 11 Operation 11 B Effective upon final approval Applicable for use during Cycle 11 Operation 11C Effective upon final approval Applicable for use during Cycle 11 Operation 11D Effective upon final approval Applicable for use during Cycle 11 Operation 12A License amendment by NRC for Applicable for use during Cycle 12 Operation SLMCPR of 1.08 128 Effective upon final approval Renumbered Table 3.3-2 to 3.3-1 , Sh. 2 of 2 and Table 3.3- 1 to 3.3-1 , Sh . 1 of 2 12C Effective upon final approval Changed Tech Spec section numbers referenced due to Tech Amendment #177 . Pages affected : 6, 24 12D Effective upon final approval Incorporated stability log-term solution option I-A. 13A Effective upon final approval Applicable for use during Cycle 13 Operation 14A Effective upon final approval Applicable for use during Cycle 14 Operation 15A Effective upon final approval Applicable for use during Cycle 15 Operation 158 Effective upon final approval Changed MAPLHGR Limits for GE14 fuel in response to an input error GE corrected . Applicable for use during Cycle 15 Operation 16A Effective upon final approval Applicable for use during Cycle 16 Operation 168 Effective upon final approval Core Loading Change to replace leaking fuel bundle JLG621 . Clarified P-F Map graphic on P.

36. Applicable for use during Cycle 16 Operation 25 Effective upon final approval Limits for Single Loop Operation were incorporated. Rev number scheme changed to Merlin Convention 26 Effective upon final approval Applicable for use during Cycle 17 Operation 27 Effective upon final approval Corrected typographical errors on p. 30 , 34 ,38 ,39 per CR-PNP-2008-256 and 285 28 Effective upon final approval Extended Tables 3.1-1 to 63.5 GWD/ST (70 GWD/MT), updated Fig . 3.1-1 , section 3.1 &

references , addressed CR-PNP-2009-01066 29 Effective upon final approval Applicable for use during Cycle 18 Operation 30 Effective upon final approval Applicable for use during Cycle 19 Operation 31 Effective upon final approval Corrected typographical error on fig .3.4-1 32 Effective upon final approval MAPLHGR limits were revised to correct errors reported by 2011-02 and 2011-03, CR-PNP-2011 -02556 33 Effective upon final approval Applicable for use during Cycle 20 Operation 34 Effective upon final approval Applicable for use during Cycle 21 Operation 35 Effective upon final approval Updated GESTAR Revision Number 36 Effective upon final approval EC67983 scope of changes: Updated Op Pressure Analytical Band Fig 3.3-5 Updated discussion in Section 3.3 Updated Reference 5.22 Cycle 21 COLR Revision 36 Page 3 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERA TING LIMITS REPORT RTYPE: G4.02 LIST OF TABLES Number Title Page 2.1-1 Formulae for Allowable APRM Flux Scram Trip Settings in 8 Figure 2.1-1, Two Loop Operation 2.1-2 Formulae for Allowable APRM Flux Scram Trip Settings in 9 Figure 2.1-2, Single Loop Operation 2.2-1 Formulae for Allowable APRM Rod Block Trip Settings in 13 Figure 2.2-1, Two Loop Operation 2.2-2 Formulae for Allowable APRM Rod Block Trip Settings in 14 Figure 2.2-2, Single Loop Operation 3.1-1 MAPLHGR Limits for Rated Power and Rated Flow for GNF2 18 Fuel 3.1-2 MAPLHGR and LHGR Multipliers for Single Loop Operation 19 3.1 .3 Peak Pin LHGR Set Down from LOCA Analysis 19 3.3-1 MCPR Operating Limits At Rated Power and Rated Flow 27 Cycle 21 COLR Revision 36 Page 4 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE: G4.02 LIST OF FIGURES Number Title Page 2.1-1 Allowable APRM Flux Scram Trip Settings - TLO 10 (Normal Feedwater Temperature) 2.1-2 Allowable APRM Flux Scram Trip Settings - SLO 11 (Normal Feedwater Temperature) 2.2-1 Allowable APRM Flux Rod Block Trip Settings - TLO 15 (Normal Feed water Temperature) 2.2-2 Allowable APRM Flux Rod Block Trip Settings - SLO 16 (Normal Feed water Temperature) 3.1-1 MAPLHGR Limit 20 3.2-1 Most Limiting LHGR For GNF2 Fuel At Rated Power and 22 Rated Core Flow 3.2-2 Flow-Dependent LHGR Factor (LHGRFACF) 23 3.2-3 Power-Dependent LHGR Factors (LHGRFACp) 24 3.3-1 Flow-Dependent MCPR Limits (MCPRF) 28 3.3-2 Power-Dependent MCPR Limits (MCPRp I Kp}, Turbine 29 Bypass Assumed Operable 3.3-3 Power-Dependent MCPR Limits (MCPRp I Kp) , Turbine 30 Bypass Assumed Out Of Service 3.3.4 Feedwater Temperature Analytical Bands 31 3.3-5 Operating Dome Pressure Analytical Bands 32 3.4-1 Power/Flow Operating Map, Scram and Rod Block Data 34 Based on Allowable Values - TLO 3.4-2 Power/Flow Operating Map, Scram and Rod Block Data 35 Based on Allowable Values - SLO 4.0-1 Reactor Vessel Core Loading Pattern 37 Cycle 21 COLR Revision 36 Page 5 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE: G4.02

1.0 INTRODUCTION

This report provides the cycle-specific limits for operation of the Pilgrim Nuclear Power Station (PNPS) during Cycle 21. In this report, Cycle 21 will be referred to as the present cycle . The Technical Specifications refer to this report for the applicable values of the following fuel-related parameters : Reference Technical Specification APRM Flux Scram Trip Setting (Run Mode) Table3 .1.1 APRM Rod Block Trip Setting (Run Mode) Table 3.2.C-2 Rod Block Monitor Trip Setting Table 3.2.C-2 Average Planar Linear Heat Generation Rate 3.11 .A Linear Heat Generation Rate (LHGR) 3.11 .B Minimum Critical Power Ratio (MCPR) 3.11.C Power/Flow Relationship 3.11.D Reactor Vessel Core Design 4 .2 If any of the core operating limits in this report is exceeded , actions will be taken as defined in the referenced Technical Specification. The core operating limits in this report have been established for the present cycle using the NRC-approved methodology provided in the documents listed in Technical Specification 5.6.5. These limits are established such that the applicable limits of the plant safety analysis are met. 1.1 Stability Option 1-D Exclusion Region and Buffer Zone The reactor shall not be intentionally operated within the Exclusion Region given in Figure 3.4-1, for Two Loop Operation (TLO) and Figure 3.4-2 for Single Loop Operation (SLO) . Immediate exit is required for inadvertent entry into the exclusion region . The reactor shall not be intentionally operated within the Buffer Zone given in Figure 3.4-1 for TLO and Figure 3.4-2, for SLO when the on-line Stability Monitor is inoperable . Allowable values for APRM Scram and Rod Block trip set points are defined in Section 2. Cycle 21 COLR Revision 36 Page 6 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERA TING LIMITS REPORT RTYPE : G4.02 2.0 INSTRUMENTATION TRIP SETTINGS: 2.1 APRM Flux Scram Trip Setting (Run Mode) Reference Technical Specifications: Table 3.1 .1 APRM flux scram Allowable Trip Set points (ATSP) for TLO are shown on Figure 2.1-1 . The scram set point curve clamps power at 120% of rated core thermal power. Formulae used to develop Figure 2.1-1 are listed in Table 2.1-1. APRM flux scram Allowable Trip Set points (ATSP) for SLO are shown on Figure 2.1 -2. The scram set point curve clamps power at 120% of rated core thermal power. Formulae used to develop Figure 2.1-2 are listed in Table 2.1-2. In accordance with Technical Specification Table 3.1.1 , Note 15, for no combination of loop recirculation flow rate and core thermal power shall the APRM flux scram trip setting be allowed to exceed 120% of rated thermal power. Flow clamp feature is not used in Cycle 21 . Drive Flow to Core Flow relationship: APRM Trip settings use Drive flow to determine the power trip setting for both scrams and rod blocks, as the drive flow is a more reliable flow indication than core flow. The transient analysis uses the stability based trip settings based on Core Flow. Therefore, calibration of Drive flow vs. core flow is important to ensure that transient analysis assumptions for trip settings are implemented correctly. Drive Flow (Wo) normalization with core flow shall be done such that 100% Drive Flow with Two Loops corresponds to 100% Rated Core Flow of 69 M#/hr. Source: Reference 5.6, sec. 2.1 Cycle 21 COLR Revision 36 Page 7 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE: G4.02 Table 2.1-1 Formulae for Allowable APRM Flux Scram Trip Settings in Figure 2.1-1 Two Loop Operation Allowable Trip Set Point Drive Flow Range (ATSP) c D

                                                                         % Rated SLOPE         INTERCEPT 0.20             71.5              0 :5 Wo :5 22.5 0.71             60.0            22.5 < Wo :5 55.9 0.65             70.6             55.9 < Wo :5 76 0              120.0            76 < Wo :5 125 Notes:
1. ATSP = C * % W 0 + D, ATSP is in% Power.
2. Figure 2.1-1 shows the plot of ATSP vs . Wo.
3. Reference 5.6, Table 1.a is the basis for the values of constants listed in this Table.

Cycle 21 COLR Revision 36 Page 8 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE : G4.02 Table 2.1-2 Formulae for Allowable APRM Flux Scram Trip Settings in Figure 2.1-2 Single Loop Operation Allowable Trip Set Point Drive Flow Range (ATSP) c D

                                                                         % Rated SLOPE         INTERCEPT 0.20             69.5              0 :S Wo :S 32.5 0.71             52 .9           32.5 < Wo :S 65.9 0.65             64.1             65.9 < Wo :S 86 0              120.0            86 < W 0 :S 125 Notes:
1. ATSP =C * % W0 + D, ATSP is in% Power.
2. Figure 2.1-2 shows the plot of ATSP vs. Wo.
3. Reference 5.6, Table 1.b is the basis for the values of constants listed in this Table.

Cycle 21 COLR Revision 36 Page 9 of 38

PILGRIM NUCLEAR POWER STA TION CORE OPERA TING LIMITS REPORT RTYPE: G4.02 Figure 2.1-1 Allowable APRM Flux Scram Trip Settings - TLO {Normal Feedwater Temperature) 130.0 I 0~ 120.0

 ....,~ 120.0                                                         V:
 -~c:    110.0                                              106._9 /
   ~ 100.0

( E

   ...cu  90.0    ~                         ....-
                                                  /

V'" 99.7 0 en 80.0 ~/

a: 7 1.5 ~
 ~
a. 70.0 -
 <(

60.0 t- - >- --- - f-. - f- - . -- 0 10 20 30 40 50 60 70 80 90 100 110 120 W 0 , Drive Flow, 0/o Cycle 21 COLR Revision 36 Page 10 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERA TING LIMITS REPORT RTYPE : G4.02 Figure 2.1-2 Allowable APRM Flux Scram Trip Settings - SLO (Normal Feedwater Temperature) 130.0 0~

  ......~ 120.0 I                                                              120.0 I                         ~
  -~c: 110.0                                                      106.9 ~
    ~ 100.0       I                                                 (                                   I I

E I f

                                                           /    V"    99.7
    ...cu 90.0    I I                                  ....-

(,)

  ~ 80.0 i                   -
                                      ~ ,.
                                             /                                                          I I

l J

  ~             69.5
a. 70.0  !

I

                  ~
  <(

60.0 ------ ------

                                                                              .,_____i__  ~~--

0 10 20 30 40 50 60 70 80 90 100 110 120 W 0, Drive Flow, 0/o Cycle 21 COLR Revision 36 Page 11 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERA TING LIMITS REPORT RTYPE: G4.02 2.2 APRM Rod Block Trip Setting (Run Mode) Reference Technical Specifications: Table 3.2.C-2, 3.1.B.1 When the mode switch is in the RUN position, the Average Power Range Monitor (APRM) rod block Allowable Trip setting (ATSPRs) as a function of drive flow for Two Loop Operation shall be as given by Figure 2.2-1. The ATSPRs is clamped at 115% of rated core thermal power. Formulae that form the basis of the Figure 2.2-1 are listed in Table 2.2-1. The flow clamp feature is not used in Cycle 21. When the mode switch is in the RUN position, the Average Power Range Monitor (APRM) rod block Allowable Trip setting (ATSPRs) as a function of drive flow for Single Loop Operation shall be as given by Figure 2.2-2. The ATSPRs is clamped at 115% of rated core thermal power. Formulae that form the basis of the Figures 2.2-2 are listed in Table 2.2-2. The flow clamp feature is not used in Cycle 21. 2.3 Rod Block Monitor Trip Setting

References:

Technical Specification Table 3.2.C-2 , Ref. 5.15, Ref. 5.10 Table 4.5 (b) Allowable values for the power-dependent Rod Block Monitor trip set points shall be:

  • Reactor Power, P Trip Set point (Allowable Value)

(%of Rated) (% of Reference Level) p :-: ; 25.9 Not applicable (All RBM Trips Bypassed) 25.9 < p ~ 62 .0 125 62.0 < p :-: ; 82 .0 125 82.0 < p 125 The allowable value for the RBM downscale trip set point shall be :-: ; 94 .0% of the reference level. The RBM downscale trip is bypassed for reactor power:-::; 25 .9% of rated (Technical Specification Table 3.2 .C-1, Note 5). The most limiting Analytical Value of Rod Block set point of 125% is justified as the Rod Withdrawal Error is expected to reduce MCPR by 0.29 if this set point is used . Since the minimum OLMCPR value is always greater than 1.51, a reduction of 0.29 in MCPR, starting with operation at OLMCPR, is expected to lower MCPR to 1.22. This is substantially above the Safety Limit MCPR of 1.10. The HTSP can be set at 125 % as unblocked rod withdrawal is non-limiting, as justified in the SRLR. Cycle 21 COLR Revision 36 Page 12 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERA TING LIMITS REPORT RTYPE : G4.02 Table 2.2-1 Formulae for Allowable APRM Rod Block Settings in Figure 2.2-1 Two Loop Operation APRM Rod Block Allowable Trip Set Drive Flow Range Point (ATSPRs) c D

                                                                             % Rated SLOPE            INTERCEPT 0.20                  66 .5             0  $  Wo   $   22.5 0.71                  55.0            22.5 < W 0     $  55 .9 0.65                  63 .6           55 .9 < Wo     $  79 .1 0                  115.0             79 .1 < Wo    $   125 Notes:
1. ATSPRs =C * % Wo + D, ATSPRs is in % Power.
2. Figure 2.2-1 shows the plot of ATSPRs vs . Wo.
3. Reference 5.6, Table 1.a is the basis for the values of constants listed in this Table .

Cycle 21 COLR Revision 36 Page 13 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE: G4.02 Table 2.2-2 Formulae for Allowable APRM Rod Block Settings in Figure 2.2-2 Single Loop Operation APRM Rod Block Allowable Trip Set Drive Flow Range Point (ATSPRs) c D

                                                                             % Rated SLOPE            INTERCEPT 0.20                  64 .5             0 :S W 0 :S 32.5 0.71                  47.9            32.5 < W 0 :S 65.9 0.65                  57.1            65 .9 < Wo :S 89.1 0                  115.0             89 .1 < Wo :S 125 Notes :
1. ATSPRs = C * % Wo + D, ATSPRs is in% Power.
2. Figure 2.2-2 shows the plot of ATSPRs vs . Wo.
3. Reference 5.6, Table 1.b is the basis for the values of constants listed in this Table.

Cycle 21 COLR Revision 36 Page 14 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE : G4.02 Figure 2.2-1 Allowable APRM Flux Rod Block Trip Settings - TLO (Normal Feedwater Temperature) 120.0 I 115.0

                                            ~
                                                -             t-I 0~
 ,.;-110.0                                                                   7                 I c:
*-0                           -----+ --  -
                                                                      /~

a.. 99~

 ..... 100.0 Cl)

CJ) g 90.0 l)947 m /

"'C 0 80.0
                                                    /

ct::

E ct::

a.. 70.0 6

<(
             '~  .;;J

_v 71.0 v 60.0 0 10 20 30 40 50 60 70 80 90 100 110 120 W0 , Drive Flow, 0.lo Cycle 21 COLR Revision 36 Page 15 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERA TING LIMITS REPORT RTYPE : G4.02 Figure 2.2-2 Allowable APRM Flux Rod Block Trip Settings - SLO (Normal Feedwater Temperature) 120.0 11 ~.o 0~

                                                                          /,
   ... 110.0
 *-c:0 a..

Q) 100.0 99~v en

   ~

g 90.0 l)947 m- / I "C 0 80.0

                                                     /

a:: --- -

                                               /
                                       /                     - -
                ~      . -                       - +                                    +

g:

  <(

70.0 -=

             ~ .5          ---           71.0
                                                           +

I 60.0 0 10 20 30 40 50 60 70 80 90 100 110 120 W0 , Drive Flow, % Cycle 21 COLR Revision 36 Page 16 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE : G4.02 3.0 CORE OPERATING LIMITS 3.1 Maximum Average Planar Linear Heat Generation Rate (MAPLHGR) Reference Technical Specification : 3.11.A During power operation , MAPLHGR as a function of axial location and average planar exposure shall not exceed the applicable limiting value. MAPLHGR limits for rated power and flow conditions are given in Tables 3.1-1 . Flow and power dependent multipliers used to be necessary only as a result of applying pin based limit using lattice local peaking factors . Beginning with Cycle 20, the peak pin LHGR setdown is applied to the pin based LHGR limit. Therefore, there is no need for power and flow dependent multipliers on the MAPLHGR limit (Reference 5.10) . Peak pin LHGR limits based on LOCA analysis are listed in Table 3.1-3. MAPLHGR limits for rated power and flow conditions for GNF2 are presented in Figure 3.1-1 . MAPLHGR limits are based on ECCS-LOCA considerations . The MAPLHGR values for rated power and flow conditions are listed in Tables 3.1-1 for GNF2 , which are obtained from the Supplemental Reload Licensing Report, Rev.a (Ref. 5.15). Licensing basis PCT based on the MAPLHGR Limits in this report for GNF2 is 2150 °F (Ref. 5.15). All PCT determination errors reported under 10CFR50.46 up to 12/31/2014 have been accounted for. Since the thermal-mechanical LHGR is no longer composited with MAPLHGR limits, there is no power or flow dependent aspect to MAPLHGR limits. The pLHGR limit is applied to LHGR which makes MAPLHGR fuel type dependent, rather than lattice dependent. Therefore the power & flow dependent multipliers only apply to LHGR limits. When in Single Loop Operation , an SLO Multiplier of 0.89 (Table 3.1-2) applies to the Rated MAPLHGR limit. Cycle 21 COLR Revision 36 Page 17 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE : G4.02 Table 3.1-1, MAPLHGR Limits for Rated Power and Rated Flow for GNF2 Fuel Bundle Type(s): GNF2-P1 ODG28388-6G6.0/7G5.0-1 OOT2-145-T6-3143 (GNF2) GNF2-P1 ODG28395-6G6.0/9G5.0-1 OOT2-145-T6-3422 (GNF2) GNF2-P1 ODG28401-6G6.0/8G5.0/1 G4.0-1 OOT2-145-T6-3421 (GNF2) GNF2-P1 ODG28389-6G6.0/8G5.0-1 OOT2-145-T6-3141 (GNF2) GNF2-P1 ODG28407-6G6.0/2G5.0/6G4.0-1 OOT2-145-T6-3642 (GNF2) GNF2-P1 ODG28406-6G6.0/6G5.0/2G4.0-1 OOT2-145-T6-3641 (GNF2) GNF2-P1 ODG28401-6G6.0/2G5.0/6G4.0-1 OOT2-145-T6-3640 (GNF2) GNF2-P1 ODG28389-6G6.0/2G5.0/6G4.0-1 OOT2-145-T6-3142 (GNF2) GNF2-P1 ODG28375-6G6.0/7G5.0-1 OOT2-145-T6-3434 (GNF2) GNF2-P1 ODG28406-6G6.0/2G5.0/6G4.0-1 OOT2-145-T6-4171 (GNF2) GNF2-P1 ODG28398-5G6.0/8G5.0-1 OOT2-145-T6-4172 (GNF2) GNF2-P1 ODG28389-15G5.0-1 OOT2-145-T6-4173 (GN F2) GNF2-P10DG28375-7G6.0/6G5.0-100T2-145-T6-4174 (GNF2) GNF2-P1 ODG28387-15G6.0-1 OOT2-145-T6-4308 (GN F2) GNF2-P1 ODG2B387-12G6.0/4G5.0-1 OOT2-145-T6-4309 (GNF2) GNF2-P1 ODG28398-14G5.0-1OOT2-145-T6-4310 (GNF2) GNF2-P10DG28387-13G6.0-100T2-145-T6-4311 (GNF2) Average Planar Exposure MAPLHGR Limit GWd/MT GWd/ST kW/ft 0 0 10.63 40.85 37.06 10.63 67 60.78 6.87 70 63.5 5.5 Cycle 21 COLR Revision 36 Page 18 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERA TING LIMITS REPORT RTYPE: G4.02 Table 3.1-2 MAPLHGR and LHGR Multipliers for Single Loop Operation The single loop operation multipliers on LHGR and MAPLHGR and the ECCS-LOCA analytical initial MCPR values applicable to each fuel type in the new cycle core are shown in the following table. Fuel Type Single Loop Operation Multiplier on LHGR and MAPLHGR GNF2 0.89 Table 3.1-3 Peak Pin LHGR Set Down from LOCA Analysis Pilgrim has an ECCS-LOCA set down on Peak Pin LHGR as shown in the Table below. This limit is therefore applied to LHGR which is a pin based limit. Fuel Type Peak Pin LHGR, kW/ft GNF2 11.81 Cycle 21 COLR Revision 36 Page 19 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE : G4.02 Figure 3.1-1, MAPLHGR Limit 12.5 I I 12.0 11.5 I I I 11.0 I10.631

  • I10.63 I I 10.5 -
                                                          ~                            I .....GNF2 10.0
                                                              ' "1 ,

9.5

  ~
 -a::
  .:ti:.

9.0 I

                                                                     ~"'"I\

(!) 8.5

c
 ...J a..

ct

  ~

8.0 7.5 7.0 I I

                                                                                   ' ~,
                                                                                           ~~
                                                                                        ~ 6~

6.5 I 6.0 I I \ 5.5 I I I

                                                                                             \ip-5.0 0         5 10 15 20    25     30     35      40       45    50    55    60      65     70 Average Planar Exposure (GWd/sT)

Cycle 21 COLR Revision 36 Page 20 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERA TING LIMITS REPORT RTYPE: G4.02 3.2 Linear Heat Generation Rate (LHGR) Reference Technical Specification: 3.11.B When reactor power is greater than 25% , the LHGR of any rod in any fuel assembly at any axial location shall not exceed the rated power and rated core flow limits presented in Reference 5.17. Figure 3.2-1 represents LHGR curves for GNF2 fuel. Proprietary detailed values are in Reference 5.17. At other than rated power and rated flow conditions, the applicable limiting LHGR value for each fuel type is the smaller of the flow- and power-dependent LHGR limits, LHGRF and LHGRp. The flow-dependent LHGR limit, LHGRF, is the product of the LHGR flow factor, LHGRFACF, shown in Figure 3.2-2 and the LHGR for rated power and flow conditions in Reference 5.17. The power-dependent LHGR limit, LHGRp, is the product of the LHGR power factor, LHGRFACp, shown in Figure 3.2-3 and the LHGR for rated power and flow conditions in Reference 5.17. LHGR Curves in Figure 3.2-1 are representative curves for U02 fuel rods and Gd containing rods . References 5.17 and 5.26 document the most limiting LHGR limits for Gd containing fuel rods. Reference 5.23 documents the GESTAR II compliance of GNF2 fuel, as amended, GESTAR II, Rev. 20 (Reference 5.1) incorporated Prime T-M methods. Cycle 21 LHGR limits are based on using PRIME for U02 fuel rods and Gd rods. Pbypass is the power level below which more restrictive thermal limits are applied , as Turbine Stop Valve closure and Turbine Control Valve Fast Closure scrams are assumed to be bypassed . Pbypass can be set anywhere in the range 25 to 45% core thermal power. Pbypass is set at 32 .5% power in 30 Monicore by default. However, the applicable less restrictive LHGRFACp limits in the upper curve in Figure 3.2-3 can be used whenever the Turbine Stop Valve closure and the Turbine Control Valve Fast Closure scrams are enabled. In modeling the Feedwater Level Control Failure with maximum demand Transient, an automatic Reactor Feed pump trip is not assumed because the trip may not occur during the transient. The trip is also not credited in the event of a system malfunction and therefore the results of the integrated plant response assume that the feed pump trip does not occur on high level. For example of a low reactor water level indication on one of the feed water level sensing channels may be present that could be the cause of the maximum Feedwater demand. This becomes important for lower power levels where the Turbine Stop Valve closure and the Turbine Control Valve Fast Closure scrams are bypassed. The off-rated limits in this COLR revision reflect this consideration (Ref. 5.25). Cycle 21 COLR Revision 36 Page 21 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERA TING LIMITS REPORT RTYPE : G4.02 ((

                                                        ))

Cycle 21 COLR Revision 36 Page 22 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE : G4 .02 Figure 3.2-2, Flow Dependent LHGR Factor (LHGRFACF)

                                                                                                                                                                                          -l---t-+--+--t----t-+-~-                                *t--"---r-+--o.... *r-~**********
                                                                                                          ,=~L-i                                          r.

1.00 ., ..........,........,..... ..........,..................*..................................... 0.95 1- + - + - - - + - - t - - + - - ' - - - - + - + - - r - + - - + - - t - L -

           -l--+--+----t---i---+--f---+---+---+---t---t--+--+---t---+--t-f---;T-..--~-+----+---t----+---<-+---+--+---+--+--t t
                                                                                                                                                                                                                      ~+-+-+L+ J11~. ,;~                                   ,__

u

~

0::: 0.80 --+--+--+--+---+--f---+----~-----+---+--+-----t-f---+---+----+----+--;---+---+--+--+---I t* ..,... 4- + +* - -* I (!) ~-+---+- .,___,.._ +- *****-+-*-**--.....*--

c
...J 0.75                                                                                                                                       I          j                                "j"* -*-t           - t      *
                                                                                                                                     +***-****'*****-* .,..                    *+                  +**** .. ,. -* +      *         .. ... *i*  ,.  +   **** - 1 0.70              ,. +                                                                                    r--  - -  -j-        *+--j-             +                -      .j - ..    -t*      +-*    +*    -~    . ...     -'-**     + ,.     +
                                                                                                                                                                                                                                ...i               t       ...      r . ..,           r       .

0.65 ~ __j. **- *t J.__ _)__ 0.60 .... L. .*.. +*** 130, 0.6261 1 f ----r--+--;-~~-t

             ......... , ... ******+******* ....         +*     *-t ............ *****                   +*                  *************** ***I***** ...,............,...... *t**                                    **+         t*                       . . . . ,......,..       + ***

0.55 +-----.----.-----.-+--.,.-----,----r---r----.-~---.-+--.,..---+---r----r---.---...---,---~ 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 Core Flow(%) Cycle 21 COLR Revision 36 Page 23 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE: G4.02 Figure 3.2-3, Power Dependent LHGR Factors (LHGRFACp) [Note: Factors listed apply to Normal Feedwater heating with the Turbine bypass In or Out of service condition. P8 = P-Bypass] 1.05 [IQ] 1.00 0.95 l o.935 l l o.935 l o.957 1

                                                                                                                                 ~ .......... -- _,,,,-

l..,...-" 0.90 ~ 0.830 0.840'1 ~ v 0.85 ,_ 0.80

           .r-- -- -

0.824 TSV/TCV Scram ENABLED (All Core Flows) Solid line: LHGRFACp with P 2: 32 .5 %CTP Dotted line: LHGRFACp with P < 32.5 %CTP 0.75

c. 0.70 TSV/TCV Scram DISABLED (Core Flows < 50%)

(.)

                                                                                               %CTP ~ P8 , 45 ~ P8 2: 25 %CTP
~ 0.65                                                                                    Dotted line: LHGRFACp with P > 32 .5 %CTP a::

(!) I Solid line: LHGRFACp w ith P $ 32 .5 %CTP

c 0.60 10.557
...I                                                                            P8 =power level below which TSV/TCV scrams are DISABLED
  • l 0.55 ... This Figure depicts solid & dotted line with P8 = 32 .5% CTP Io.49o
                               -     --_, , , .- l 0.50 0.379   /  l -- .
                                  ,.          10.537 TSV/TCV Scram DISABLED (90% > Core Flows > 50%)

0.45 0.40

              ,/

vv ('- I %CTP ~ P8 , 45 ~ P8 2: 25 %CTP Dotted line: LHGRFACp with P > 32 .5 %CTP

           ~(/   v   I0.435                                                               Solid line: LHGRFACp with P $ 32 .5 %CTP Pe = power level below which TSV/TCV scrams are DISABLED 0.35 0.30
            ~ 0.340 Th is Figure depicts solid & dotted line with Pe= 32 .5% CTP 0.25 25       30       35     40           45   50    55              60     65        70         75      80       85       90            95        100  105
                                                                                %CTP Cycle 21 COLR Revision 36                                                                                                                                       Page 24 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE : G4.02 3.3 Minimum Critical Power Ratio (MCPR) Reference Technical Specification: 3.11.C During power operation, the MCPR shall be greater than or equal to the Operating Limit MCPR (OLMCPR). The operating limit MCPR is the greater of the flow- and power-dependent MCPR operating limits, MCPRF and MCPRp. The flow-dependent MCPR operating limit, MCPRF, is provided in Figure 3.3-1 . For power level less than Pbypass. the MCPRp is independent of the fuel type and can be directly read from Figure 3.3-2, when Turbine Bypass is operable and from Figure 3.3-3 , when Turbine Bypass is out of service. Above PByP.a~s* MCPRp is the product of the rated power and flow MCPR operating limit presented in Table 3.3-1, and the Kp factor presented in Figure 3.3-2, when Turbine Bypass is in service and from Figure 3.3-3, when Turbine Bypass is out of service. The rated power and flow MCPR operating limits presented in Tables 3.3-1 are functions of 't' . Both Figures 3.3-2 and 3.3-3 include normal and reduced feed water temperature operating modes. For SLO MCPRp and MCPRF are raised by 0.02 compared to TLO values shown in Figures 3.3-2 and 3.3-3. The value oft in Table 3.3-1 shall be equal to 1.0, unless it is calculated from the results of the surveillance testing of Technical Specification 4.3.C . TS 4.11 .C defines 't'. Pbypass is the power level below which 30 Monicore applies more restrictive thermal limits, as Turbine Stop Valve Closure and Turbine Control Valve Fast Closure scrams are assumed to be bypassed . Pbypass can be set anywhere in the range 25% to 45% core thermal power. In 30 Monicore, Pbypass is set at 32 .5% by default in 30 Monicore. However, the less restrictive MCPRp limits (the lower curve) in Figures 3.3-2

      & 3.3-3 can be applied whenever the Turbine Stop Valve closure and the Turbine Control Valve Fast Closure scrams are enabled .

Transient Analysis assumes that the transient initiates from operation within the Feedwater temperature vs. Reactor Power band (Figure 3.3-4). Transient Analysis assumes that a transient initiates from operation within the Feedwater temperature vs. Reactor Power band (Figure 3.3-4) . Also, Transient Analysis considers the initial pressure when a transient initiates. Figure 3.3-5 presents four curves:

1. A constant "Analysis Upper Pressure Bound" equal to 1046 psig , and
2. A representative nominal I expected dome pressure curve which has a dome pressure of 1035 psig at 100% core thermal power, and
3. A standard lower band labeled"(-) 10 psi Analysis Pressure Bound" , and
4. An expanded pressure band labeled"(-) 20 psi Analysis Pressure Lower Bound" If operating dome pressure is above the"(-) 10 p;:;i Analysis Pressure Bound" on Figure 3.3-5 an OLMCPR penalty is not applied. If dome pressure is within the expanded pressure band on Figure 3.3-5 which is below the"(-) 10 psi Analysis Pressure Bound" and above the"(-) 20 psi Analysis Lower Bound" an OLMCPR penalty of 0.01 must be applied. The Cycle 21 SRLR (Reference 5.15) provides the pressure boundaries on Figure 3.3-5 and indicates these boundaries supersede those provided previously in a cycle independent expanded dome pressure report. The dome pressure limit curve on Figure E-1 in the Cycle 21 SRLR is based on Reference 5.22. The OLMCPR penalty of 0.01 when operating in the expanded range pressure range between (-)10 psi and (-)20 Cycle 21 COLR Revision 36 Page 25 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERA TING LIMITS REPORT RTYPE : G4.02 psi is required per Reference 5.15. In modeling the Feedwater Level Control Failure with maximum demand Transient, an automatic Reactor Feed pump trip is not assumed because the trip may not occur during the transient. The trip is also not credited in the event of a system malfunction and therefore the results of the integrated plant response assume that the feed pump trip does not occur on high level. For example, a low reactor water level indication on one of the feed water level sensing channels may be present that could be the cause of the maximum Feedwater demand . This becomes important for lower power levels where the Turbine Stop Valve closure and the Turbine Control Valve Fast Closure scrams are bypassed . The off-rated limits in this COLR revision reflect this consideration (Ref. 5.25). Cycle 21 COLR Revision 36 Page 26 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERA TING LIMITS REPORT RTYPE : G4.02 Table 3.3-1 MCPR Operating Limits At Rated Power and Rated Flow The MCPR Operating Limit for Two Loop Operation (OLMCPRTLo) is a function of fuel type , exposure, and 't , which is derived from scram timing measurements . OLMCPR For GNF2 Fuel Two Tau Loop Operation From To BOC to MOC MOC to EOC 0 .0 1.51 1.57 0.0 0.1 1.52 1.58 0.1 0.2 1.53 1.59 0.2 0.3 1.54 1.60 0.3 0.4 1.55 1.61 0.4 0.5 1.56 1.62 0.5 0.6 1.57 1.63 0.6 0.7 1.58 1.64 0.7 0.8 1.59 1.65 0.8 0.9 1.60 1.66 0.9 1.0 1.61 1.67 BOC= Beginning Of Cycle MOC= Middle of Cycle= End Of Rated Power Operation at Rated Flow (EOR) - 1.935 GWd/ST EOC = End Of Cycle Note : The rated OLMCPR Limits given above apply to both normal and reduced Feedwater Temperature as well as Turbine Bypass Valve OOS and Turbine bypass Valves in service. Off rated MCPR limits are given in Figures 3.3-1, 3.3-2 and 3.3-3 as taken from the Supplemental Reload Licensing Report (Reference 5.15). Single Loop Operation OLMCPR sLo = 0.02 + OLMCPR TLo, where OLMCPR TLOis selected from the Table above. Cycle 21 COLR Revision 36 Page 27 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE: G4.02 Figure 3.3-1, Flow Dependent MCPR Limits (MCPRF) 1.65 1.60

         ~
           -{ 30, 1.61 :

1.55 "- I ' ....

                                       "'II 1.50                                    "-
                                               " llli....

I SLO MCPRf =TLO MCPRf + 0.02 , for all values. I r;t 1.45 1.40

                                                          '   "- I'....
                                                                          "'II~

a.. ()

~   1.35                                                                        '  llli.....

1.30 ' "' '- 1.25

                                                                                                     ' Iii..
                                                                                                             "'II' I

1.20

                                                                                                                   '  ..... 192 .7, 1.22 1 112, 1 22 1.15 1.10 30            35    40         45      50          55    60      65      70          75    80       85      90          95      100 105   110      115 Core Flow(%)

Cycle 21 COLR Revision 36 Page 28 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE : G4.02 Figure 3.3-2 Power Dependent MCPR Limits {MCPRp I Kp) [Note 1: Turbine Bypass is Assumed Operable for both Normal and Reduced Feedwater Temperature]

                                                                                                                            =

[Note 2: The KP multiplier is applied to the rated MCPR when %CTP >PB where PB P-Bypass, TSC/TCV Scram enabled] 4.50 TSV/TCV Scram DISABLED (Core Flows > 50%, s 90%) 4.25 25% $ %CTP $ PB $ 45% ~ Dotted line: MCPRp with 45 ~ P > 32 .5 %CTP , %CTP s P8 4.00 Solid line: MCPRp with P s 32.5 %CTP

                                                                                                                                                               ~

PB= power level below which T5V/TCV scrams are DISABLED 3.75 ~ Th is Figure depicts solid & dotted line with PB = 32 .5% CTP 3.50 A~ I I I TSV/TCV Scram DISABLED (Core Flows < 50%) 3.25 %CTP $PB' 45 ~ PB ~ 25 %CTP f--

               ~~ ...... i'....
-rl
 ~

D.. 3.00 2.75 ."' ...

                              -~

li011

                                                      -... ..... ~ 12.sBl Dotted line: MCPRp with 45 ~ P > 32 .5 %CTP , %CTP s P8 Solid line: MCPRp with P s 32.5 %CTP PB= power level below which TSV/TCV scrams are DISABLED f--

f-- ll. (.) 2.50 2.25

                        "'   ~~

2.4o l "J

                                               ...... ...... l2.01 This Figure deoicts solid & dotted line with Pc = 32 .5%

TSV/TCV Scram ENABLED (All Core Flows) f-- 2.00 .. 1"".., - Solid line: Kp with P ~ 32.5 %CTP Dotted line: Kp w ith P < 32 .5 %CTP f-- 1.75 f-- 1.50 l 1.281 J j--..1...-

                             §                               @~                    11.1961 1.25                                                                                                                         ~-
                                                                                                                                     ~
                                                                                       ~

1.00 T I ....

                                                                                                                                                             @]

25 30 35 40 45 50 55 70 75 80 85 90 95 100 WHEN IN Single Loop Operation {SLO): For P ::5 Pbypass MCPRp is raised by 0.02 compared to TLO values . For P > Pbypass , the rated OLMCPR is raised by 0.02 before multiplying by Kp to calculate MCPRp . Cycle 21 COLR Revision 36 Page 29 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE : G4.02 Figure 3.3-3 Power Dependent MCPR Limits (MCPRp I Kp) [Note 1: Turbine Bypass is Assumed Out of Service for both Normal and Reduced Feedwater Temperature] [Note 2 : The KP multiplier is applied to the rated MCPR when %CTP >PB , where PB = P-Bypass, TSC/TCV Scram enabled] 4.50 ~ d4.4al TSV/TCV Scram DISABLED (Core Flows > 50%, :5 90%) 4 .25 ~ ,, 25% $ %CTP $ PB $ 45% - 4.00 \ Dotted line: MCPRp with 45 ~ P > 32.5 %CTP, %CTP 5 P8 3.75 '~ Solid line: MCPRp with P $ 32.5 %CTP, %CTP PB= power level below wh ich TSV/TCV scrams are DISABLED

                                                                                                                                                            $ PB
                                                                                                                                                                       ~
                               \        ~s_j 3.50 j ~
                                        ,,                                                          This Figure depicts solid & dotted line with P6 = 32 .5% CTP 3.25                                      ' ....                                                          TSV/TCV Scram DISABLED (Core Flows 5 50%)

25% $ %CTP $PB$ 45%

                                                                                                                                                                       ~
~ 3.00
             §EJ                                     ""
                                                                                                       Dotted line: MCPRp with 45 ~ P > 32.5 %CTP, %CTP 5 P8         f---

r:l 2.75

                     ~                 .-                                                                    Solid line: MCPRp with P $ 32.5 %CTP, %CTP $PB f---
                          ........... 12.63 1 c..
~ 2.50
                                    .1* ..... _                              "~
                                                                                .~                   PB= powe r level below which TSV/TCV scram s are DISABLED This Figure depicts solid & dotted line with PB= 32.5% CTP
                                                     ..........                                                                                                        f---

2.25

                                                                ........ ...      _L                                                                                   ~
                                                                             -J .. 2.20 TSV/TCV Scram ENABLED (All Core Flows) 2.00                                                                                                               Solid line: Kp with P ~ 32.5 %CTP               ~

Dotted line: Kp with P < 32.5 %CTP 1.75 f--- 1.50 I I 1.25 1.2a1

           ~-~-               ~                                              ~2061                ~                                               ~~

T T T ~ 1.00 I - I 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100

                                                                                                      %CTP WHEN IN Single Loop Operation (SLO):

For P s; Pbypass MCPRp is raised by 0.02 compared to TLO values . For P > Pbypass , the rated OLMCPR is raised by 0.02 before multiplying by Kp to calculate MCPRp. Cycle 21 COLR Revision 36 Page 30 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE: G4.02 Figure 3.3-4, Feedwater Temperature Analytical Bands 375 ,...,. 365 355

                                                                                                                                                                                                                                                     -""'                ,...,.. .... I""

u.. 0 345

                                                                                                                                                                            ....... ii-....
                                                                                                                                                                                             ...... jllll' c... ....
     ...::I Q)     335 c... ...

ca Q) c.. 325

                                                                                                       ~ .......
                                                                                                                       ~

_i,- .... .... i... ....... E 31 5 .... ........ ... ,.. .... ... .... ....

    ~
                                                                              ........               , ~,..~
     ...                                                      ........ ~
   - Q) ca
     ~
    "'C Q) 305 295 I
                                           ~I--'
                                                  .,.i.-
                                                         --~

111111 fl'""

                                                                                       .-fl',...
                                                                                                     ' ~~    ...
                                                                                                                  .... ~ ....

I Nominal Feedwater Temperature

                                                                                                                                              +!- 10 Deg.F (Feedwater Temp An alytical Limits)

Q) ,;" ~~ ~ .... u.. "'

                                ~~

ca 285 ), ,,.,~

                                           ""'fl'        ..-""'                                                                            Operation outside of the+/- 10 Deg .F Feedwater c:                                           ,i.-                                                                                          Tem oerature Anal11tical Limits is prohibited.
                        )'

u.. 275

                 ~~         "'~ "" ~
                                      ,,,, ~~

265 "'~ )' 1..11" )' '

                        ~~

255

                 ~~                                                                                                                                                                 I 245 25          30         35          40               45                       50                  55               60                 65                 70                75               80                  85                  90                95               100
                                                                                                                                 %CTP Cycle 21 COLR Revision 36                                                                                                                                                                                                                                              Page 31 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERA TING LIMITS REPORT RTYPE : G4.02 Figure 3.3-5 Reactor Dome Pressure Operating Domain 1060 l OSO

                                      -r-   t-1040
                                     --                        -       SR LR Analysis Upper Pressure Bound 1046 psig 1030                                                                                                                                                              .,,,, /

1020 Th er nal Limits - - SRLR Cycle 21 Nominal/ Expected Dome Pressure

                                                                                                                                                                  -~               _,,

v ,, ,

                                                               - - - * (-) 10 psi Analysis Press ure Bound per Cycle 21 SRLR                                                 I' iiii                    Mc nitori ig                                                                                                                                 , ~1-       /
  'iii                             _.                          -       (-) 20 psi Analysis Pressure Lower Bound per Cycle 21 SR LR                      ~
  .e: 1010                      -**-                                                                                                      L/ ... _, i.. - ., ,
                                                                                                                                                    ~                     ~.,..

QI

I O)meP essu1 e limit >-* - ...... - -

1000

   ..."'"'                                                                                                                                              ~V' -
                                                                                                                                                    ~

Noti 'pplic 1ble /

                                                                                                                          . / ,, ,

QI ,~ - Cl. I e.lo.\&I 0 QI E 0

   ...0 990 980 -

2 1 % CP ->--

                                                                                                 ~..-
                                                                                                          ~
                                                                                                                  ~ -;;, **..,. -LT """"
                                                                                                                   , ..            I/'"
                                                                                        ~

_, :.-" .I/'" 4J 970 u QI * - - --

                                                                  ~
                                                                          ~ >-           __ .    .,-~ >-

___,,,. ~ - An additional penalty of 0.01 must be er::: 960

                               --         - ~
                                                  ----   .. --   --   --    -             ,..,,; ~=

applied to the OLMCPR to operate in the highlighted area between the 9SO - "(-)10 psi Analysis Pressure Bound " and the -

                                                  ...-~ '---      ~~              -                                             "(-) 20 psi Analysis Pressu re Lower Bound" 940 -                      -
                  -- s - ---
                                                                       -r--
                   ~-
                                                                  ~
                 -                        ~~

930 920 0 10 lS 20 2S 30 3S 40 4S so SS 60 6S 70 7S 80 8S 90 9S 100 Core Ther mal Power {% CTP) Cycle 21 COLR Revision 36 Page 32 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE : G4.02 3.4 Power/Flow Relationship During Power Operation Reference Technical Specification : 3.11.D The Cycle 21 stability analysis does not credit the flow clamp feature of the FCTR cards. The dominance of Core Wide Oscillations was demonstrated without the use of the flow clamp. APRM Flux scram and Rod Block curves without the flow clamp are therefore applicable to Cycle 21 . The power/flow relationship shall not exceed the limiting values shown on the Power/Flow Operating Maps in Figures 3.4-1 when in Two Loop Operation and 3.4-2 when in Single Loop Operation . Cycle 21 operation is not fully analyzed for reduced feedwater temperature for issues other than thermal limits. The SRLR (Reference 5.15) contains only the thermal limit analysis results for reduced feed water temperature mode . The exclusion and the buffer regions shown in Figures 3.4-1 and 3.4-2 are based on Stability Solution 1-D (references 5.4 , 5.12, 5.15 and 5.20) . Cycle 21 Stability Analysis summarized in the SRLR (Reference 5.15, Section 15) utilizes ODYSY LTR (Reference 5.24) that removed the decay ratio adder of 0.15.Figures 3.4-1 and 3.4-2 show APRM Scram and Rod Block lines using Allowable values as a function of Core Flow. Exclusion and Buffer Region boundaries specified in the SRLR are slightly smaller than those in the P-F Map Reference 5.14. The current P-F Map is therefore conservative for buffer and exclusion regions and was not revised for Cycle 21, other than the core flow restriction to 90% core flow for power below Pbypass of 32 .5% . Single Loop Analysis limits maximum Core Flow to 52% of Rated Core Flow and maximum Power to 65% of Rated due to SLO vessel internal vibration (Ref. 5.7, p. 1-2). Various lines on the Power to flow map are described in Ref. 5.14. Cycle 21 COLR Revision 36 Page 33 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERA TING LIMITS REPORT RTYPE : G4.02 FIGURE 3.4-1 PILGRIM POWER I FLOW MAP - Two Loop Operation Scram and Rod Block Data based on Allowable Values CORE FLOW, MLB/HR 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 125 120 APRM SCRAM CLAMP AT 120%

                                                                                                                                                                                           ~        2434 115 110
                                                                                                                        'ift!
                                                                                                                        'fi!ii' ~      ~*

ti!'~=!!!!:.:=~~!!!!:!!:===~~~ APRM ROD BLOCK CLAMP AT 115% I

                                                                                                                                                                                               .. 2332 2231 105 F    -
                                                                                                                            '!"j/j'fl/Jypr-                                         OPERATION    I  2129 0    100                                                                                                             ~
  • f ** < - r 2028 w
       ~

95 90

                                                                                                                                - ~
                                                                                                                                       ~
                                                                                                                                       ~                                               '            1927 1-1825 s:
       ~ 851~~~~~~~~~~~~~~~

1724 ~

       ~     80                        -       - .                                                                                                                                                  1622 ci w

ffi

                                                                                                                                                                                                         ~

75 1521 s: 70 *

                                 -t ICF                 1420 5

CORE FLOW Q.

       ~     65 . . .. . .-~

n- ~~ ~f .............. REGION 1318 ...J 1217 <(

       ...J
       <(

60 OPERATION I :. : .,#

                                                                                                                                                                                                         ~

1115 ~

       ~ !~            PROHIBITED..                                        ~VA                                                                                                                           w 1014 ::c 913 l-I-

w 40 1 LOWER BOUND +-4 811 ~

                                                                                                                                                                               .----T~..,-

r

       ~     35        NAT CIRC LINE        -4          '                                                                                                                                                o 8     30                                                                                                                                                                 OPERATION PROHIBITED I    110 608  (.)

507 25 MINIMUM POWER INTERLOCK

             ~~l~N~AT~~~~l!!~~~~~~~~l-~-~~~~~*~~~~~~~-~1-~~~~~~~~:~+~~~~:

10 5 0 0 CIRC LINE 5 10 _.,. ~- 15

.;:~

20

                                                                 - ;-- t--

25 30 MIN PUMP SPEED (26%)

                                                                                     ~-~ .T ,..!., -l 35 J..;.;. J::
                                                                                                      ~

r: 40 45 1.

                                                                                                                                       ~::

50 r 55 60

                                                                                                                                                              ~ ~-

65 t'::: 70 1 75 80 203 101 0 CORE FLOW, MLB/HR Cycle 21 COLR Revision 36 Page 34 of 38

PILGRIM NUCLEAR POWER STA TION CORE OPERATING LIMITS REPORT RTYPE: G4.02 FIGURE 3.4-2 PILGRIM POWER I FLOW MAP - Single Loop Operation Scram and Rod Block Data based on Allowable Valu e Setpoint CORE FLOW, MLB/HR 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 125 2535 120 i11il~~~~~~li~il~~ii~~~~ii~illl~il~~il~ii~~~~~~~~~~~~~~ APRM SCRAMCLAMPAT120't. - 2434 115 2332 110 2231 105 2129 100 2028 ffi 95 1927 I-I- 90 1825 s:

   ~    85                                                                                                                   1724 ~
   <!-  80                                                                                                                   1622 rx;~

w

 * ~

w 75 1521 s: s: 70 1420 2 0 65 1318 _J

a. <t

_J 60 1217 ~

   <t   55     OPERATION                                                                                                     1115 rx;
   ~           PROHIBITED                                                                                                         w rx;  50                                                                                                                   1014 :I:

w 1-

I: 45 913 w 1- rx; w 40 LOWER BOUND 811 0 rx; 35 NAT CIRC LINE 710 CJ 608 25 507 20 406 MINIMUM POWER INTERLOCK 15 304 10 203 5 101 0 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 CORE FLOW, MLB/HR Cycle 21 COLR Revision 36 Page 35 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE : G4.02 4.0 REACTOR VESSEL CORE DESIGN Reference Technical Specification : 4.2 The reactor vessel core for the present cycle consists of 580 fuel assemblies of the types listed below. The core loading pattern (Ref. 5.15) for each type of fuel is shown for the present cycle in Figure 4.0-1.

                                                                          #of         Cycle Irradiated Bundles Bundles     Loaded GNF2-P1 ODG2B388-6G6.0/7G5.0-1 OOT2-145-T6-3143                           21          18 GNF2-P1 ODG2B388-6G6.0/7G5.0-1 OOT2-145-T6-3143                            5          18 GNF2-P10DG2B395-6G6.0/9G5.0-100T2-145-T6-3422                             16          19 GNF2-P1 ODG2B401-6G6.0/8G5.0/1 G4 .0-1 OOT2-145-T6-3421                   24          19 GNF2-P1 ODG2B389-6G6.0/8G5.0-1 OOT2-145-T6-3141                           14          18 GNF2-P1 ODG2B407-6G6.0/2G5.0/6G4 .0-1 OOT2-145-T6-3642                    44          19 GNF2-P1 ODG2B401-6G6.0/2G5 .0/6G4.0-1 OOT2-145-T6-3640                    28          19 GNF2-P1 ODG2B406-6G6 .0/6G5.0/2G4.0-1 OOT2-145-T6-3641                    16          19 GNF2-P1 ODG2B401-6G6.0/2G5.0/6G4.0-1 OOT2-145-T6-3640                      8          19 GNF2-P10DG2B389-6G6.0/2G5.0/6G4.0-100T2-145-T6-3142                       92          18 GNF2-P10DG2B375-6G6.0/7G5 .0-100T2-145-T6-3434                            16          19 GNF2-P1 ODG2B406-6G6.0/2G5 .0/6G4.0-1 OOT2-145-T6-4171                    56          20 GNF2-P1 ODG2B398-5G6.0/8G5.0-1 OOT2-145-T6-4172                           24          20 GNF2-P1 ODG2B389-15G5.0-1 OOT2-145-T6-4173                                40          20 GNF2-P1 ODG2B375-7G6.0/6G5.0-1 OOT2-145-T6-4174                           32          20 New Bundles for Cycle 21 GNF2-P1 ODG2B387-15G6.0-1 OOT2-145-T6-4308                                24          21 GNF2-P1 ODG2B387-12G6.0/4G5.0-1 OOT2-145-T6-4309                          30          21 GNF2-P1 ODG2B398-14G5.0-1OOT2-145-T6-4310                                 28          21 GNF2-P1 ODG2B387-13G6.0-100T2-145-T6-4311                                  16         21 GNF2-P1 ODG2B387-15G6.0-1 OOT2-145-T6-4308                                 8          21 GNF2-P1 ODG2B387-12G6.0/4G5.0-1 OOT2-145-T6-4309                           10          21 GNF2-P1 ODG2B398-14G5.0-1OOT2-145-T6-4310                                 20          21 GNF2-P1 ODG2B387-13G6.0-1 OOT2-145-T6-4311                                 8          21 Total                                                                     580 Cycle 21 COLR Revision 36                                                                       Page 36 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERA TING LIMITS REPORT RTYPE: G4 .02 FIGURE 4.0-1 , Reactor Vessel Core Loading Pattern 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2 1 22 23 24 25 26 GN F 1 19 19 11 19 5 19 5 19 5 19 5 11 19 19 1 19 19 19 19 7 12 8 8 12 7 19 19 19 19 2 19 19 11 20 21 23 21 15 22 22 15 21 23 21 20 11 19 19 3 19 19 21 21 27 27 31 31 27 27 31 31 27 27 21 21 5 19 4 6 11 5 7 13 31 12 23 13 23 8 8 23 13 23 12 31 13 7 19 6 19 5 19 19 7 12 21 26 21 12 23 25 24 24 25 23 12 21 26 21 12 7 5 19 6 11 19 19 21 13 21 30 21 30 24 29 24 26 26 24 29 24 30 21 26 21 13 21 19 19 19 7 19 5 20 21 31 26 21 26 23 26 24 25 8 8 25 24 26 23 26 21 26 31 21 20 19 19 8 19 19 21 27 12 21 30 23 16 12 25 20 13 13 20 25 12 16 23 30 21 12 27 21 5 19 9 19 19 23 27 23 12 24 26 12 16 22 32 22 22 32 22 16 12 26 24 12 23 27 23 19 11 10 5 7 21 31 13 23 29 24 25 22 28 15 28 28 15 28 22 25 24 29 23 13 31 21 7 5 11 19 12 15 27 23 25 24 25 20 32 15 28 12 12 28 15 32 20 25 24 25 23 27 15 12 19 12 19 8 22 27 8 24 26 8 13 22 28 13 12 12 13 28 22 13 8 26 24 8 27 22 8 5 13 5 8 22 27 8 24 26 8 13 22 28 20 12 12 20 28 22 13 8 26 24 8 27 22 8 19 14 19 12 15 27 23 25 24 25 13 32 15 28 12 12 28 15 32 20 25 24 25 23 27 15 12 19 15 19 7 21 31 13 23 29 24 25 22 28 15 28 28 15 28 22 25 24 29 23 13 31 21 7 5 16 19 19 23 27 23 12 24 26 12 16 22 32 22 22 32 22 16 12 26 24 12 23 27 23 6 11 17 19 19 21 27 12 21 30 23 16 12 25 13 13 13 20 25 12 16 23 30 21 12 27 21 5 19 18 6 19 20 21 31 26 21 26 23 26 24 25 8 8 25 24 26 23 26 21 26 31 21 20 19 19 19 19 6 19 21 13 21 30 21 30 24 29 24 26 26 24 29 24 30 21 26 21 13 21 5 19 19 20 11 19 7 12 21 26 21 12 23 25 24 24 25 23 12 21 26 21 12 7 19 19 21 19 19 11 7 13 31 12 23 13 23 8 8 23 13 23 12 31 13 7 19 19 5 22 19 19 21 21 27 27 31 31 27 27 31 31 27 27 21 21 19 19 23 19 19 19 20 21 23 21 15 22 22 15 21 23 21 20 11 19 19 24 19 19 19 19 7 12 8 8 12 7 19 19 19 19 25 19 19 11 19 5 5 19 19 5 5 19 11 11 19 26 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 GN F

                                                                                    #of      Cycle IAT  Bundle Description                                            Bundles Load ed 5  GNF2-P1ODG2B388-6G6.0/7G5.0- 1OOT2-1 45-T6-3143                  21        18 6  GNF2-P1 ODG2B388-6G6.0/7G 5.0- 1OOT2-145-T6-3143                  5        18 7  GNF2-P1ODG2B395-6G6.0/9G5 .0-1 OOT2-145-T6-3422                  16        19 8  GNF2-P1 ODG2B401 -6G6.0/8G5.0/1G4.0-1 OOT2- 145-T6-3421          24        19 11  GNF2-P1 ODG2B389-6G6.0/8G5.0- 1OOT2-145-T6-314 1                 14        18 12  GNF2-P1ODG2B407-6G6.0/2G5.0/6G4.0-1OOT2- 145-T6-3642             44        19 13  GNF2-P1 ODG 2B401 -6G6.0/2G5.0/6G4.0-1OOT2- 145-T6-3640          28        19 15  GNF2-P1 ODG2B406-6G6.0/6G5.0/2G4.0-1OOT2-145-T6-3641             16        19 16  GNF2-P1 ODG2B401 -6G6.0/2G 5. 0/6G4.0-1OOT2-145-T6-3640           8        19 19  GNF2-P1ODG2B389-6G6.0/2G5 .0/6G4.0-1OOT2-145-T6-3142             92        18 20  GNF2-P1ODG2B375-6G6 .0/7G5.0-1OOT2-145-T6-3434                   16        19 21  GNF2-P1 ODG2B406-6G6.0/2G5.0/6G4.0-1OOT2-145-T6-41 71            56        20 22  GNF2-P1 ODG2B398-5G6. 0/8G5.0-1 OOT2-145-T6-4 172                24        20 23  G NF2-P1 ODG 2B389-15G5.0-1OOT2-145-T6-4173                      40        20 24  GNF2-P1 ODG2B375-7G6.0/6G 5.0-1 OOT2-145-T6-4174                 32        20 25  GNF2-P1ODG2B387-15G6.0-1 OOT2- 145-T6-4308                       24        21 26  G NF2-P1 ODG2B387-12G6.0/4G5 .0- 1OOT2- 145-T6-4309              30        21 27  GNF2-P1ODG2B398- 14G5.0-1OOT2-145-T6-431 0                       28        21 28  GNF2-P1 ODG2B387- 13G6.0-1 OOT2-145-T6-431 1                     16        21 29  GNF2-P1 ODG2B387- 15G6.0-100T2-145-T6-4308                        8        21 30  GNF2-P1 ODG2B387-12G6.0/4G5 .0- 1OOT2- 145-T6-4309               10        21 31  GNF2-P1ODG2B398- 14G5.0-1OOT2-145-T6-4310                        20        21 32  GNF2-P1 ODG2B387-13G6.0-1 OOT2-145-T6-431 1                       8        21 Tota l   580 Cycle 21 COLR Revision 36                                                                                             Page 37 of 38

PILGRIM NUCLEAR POWER STATION CORE OPERATING LIMITS REPORT RTYPE : G4.02

5.0 REFERENCES

5.1 NEDE-24011-P-A-21 and NEDE-24011-P-A-21-US, "General Electric Standard Application for Reactor Fuel" , May, 2015, eB record: KGO-ENO-GEN-15-085. 5.2. EC47669, Cycle 21 Reload Core Design . 5.3. NEDC-31852-P , rev. 4, "Pilgrim Nuclear Power Station SAFER/GESTR-LOCA Loss-of-Coolant Accident Analysis for PNPS", January 2008 . 5.4. NEDC-33155P, Rev.O, Application of Stability Long-Term Solution Option 1-D To Pilgrim Nuclear Power Station, October 2004 . 5.5. Letter 2.14.076, License Amendment Request for Cycle 21 SLMCPR . 5.6. GE-NE-GENE-0000-0033-6871-01, Rev. 0, Pilgrim Option 1-D APRM Flow Biased Set points, October 2004. 5.7 . GE-NE-0000-0027-5301, Rev 2, Pilgrim Nuclear Power Station Single Loop Operation, April 2006. 5.8. S&SA-186 , % ;).Wo for use with Stability Option 1-D for Pilgrim (applicable to SLO) . 5.9. SUDDS/RF 94-42, NEDC-32306P, "Maximum Extended Load Line Limit Analyses", March 1994. 5.10. SUDDS/RF 88-160 , NEDC-31312-P, "ARTS Improvement Program Analysis for Pilgrim Nuclear Power Station", September 4, 1987. 5.11 . A22-00109-00 MAPLHGR set down process explanation for Pilgrim, November 2001 . 5.12. ECH-NE-09-00019, R2, GNF2NFI , GEH-0000-0085-9069-R2, GNF2 Fuel Design Cycle Independent Analyses for Entergy PNPS , March 2011. 5.13 . ER 03110960, Stability 1-D implementation . 5.14. PNPS-RPT-03-00001, Rev. 7, "Pilgrim Power To Flow Map Report."(EC56046) 5.15. ECH-NE-15-00008 , "Supplemental Reload Licensing Report, Reload 20, Cycle 21 , February 2015", OOON9841-SRLR Rev.O (EC56046). 5.16 . ECH-NE-15-00006, EC55561 , PNPS Cycle 21 OPL-3 Form . 5.17. ECH-NE-15-00009, OOON9842-FBIR Rev.O, January 2015 , "PNPS Cycle 21 Fuel Bundle Information Report (FBIR)" (EC56046) . 5.18. SUDDS/RF 02-86 , GNF SER issued by NRG approving elimination of Upper Bound PCT limit requirement. 5.19. EC7933 documents OPL-4 & 5 LOCA Inputs. 5.20 . NED0-32465A, Licensing Topical report "Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Application , August 1996. 5.21. ECH-NE-09-00018, PNPS GNF2 ECCS-LOCA Evaluation . 5.22. ECH-NE-2016-00036, "Pilgrim Expanded Dome Pressure Band for All Off-Rated Powers" . I 5.23. NEDE-33270P, GNF2 Advantage Generic Compliance with GESTAR 11), Revision 5, May 2013 (This reference is also known as Amendment 22 report for GNF2) . (record in eB : KGO-ENO-J B 1-13-085) 5.24 . NEDE-33213, ODYSY Application. for Stability Licensing Calculations Including Option 1-D and II Long Term Solutions, April 2009 5.25. CR-PNP-2014-5904, Inappropriate Use of Reactor Feed Pump Trip in transient analysis 5.26 . EC47669-7.010 , 002N3765-00, GNF2-B36-P3-HK1-18PDN Limits Tables 5.27. GNF Letter KGO-ENO-HK1-15-094, dated June 16, 2015. Cycle 21 COLR Revision 36 Page 38 of 38

Attachment 4 Letter Number 2.17.061 2, KGO-ENO-HK1-17-081 , Affidavit for Enclosure 10, Pilgrim Nuclear Power Station Cycle 21 Core Operating Limits Report, Revision 36, GNF Proprietary Information - Class II (Internal)

ENCLOSURE12 KGO-ENO-HK1-17-081 Affidavit for Enclosure 10

Global Nuclear Fuel - Americas AFFIDAVIT I, Brian R. Moore, state as follows: (1) I am General Manager, Core & Fuel Engineering, Global Nuclear Fuel - Americas, LLC (GNF-A), and have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and have been authorized to apply for its withholding. (2) The information sought to be withheld is contained in Enclosure 10 of GNF ' s letter, KGO-ENO-HKl-17-081 , Kimberly O ' Connor (GNF) to Neta Szwarc (Entergy), entitled "Pilgrim Nuclear Power Station Cycle 20 Core Operating Limits Report (COLR) Revision 33 and Cycle 21 COLR Revision 34, 35 , and 36 - Proprietary and Non-Proprietary Versions," July 28, 2017 . GNF proprietary information in Enclosure 10, which is entitled "Pilgrim Nuclear Power Station Cycle 21 Core Operating Limits Report, Revision 36," is identified by a dotted underline inside double square brackets. ((Ih.i.~--~-~D.t.~D~~_.!~__ _l';l.D.

    ~~!:l!l!P.!~,'. ~!J] A " ((" marking at the beginning of a table, figure , or paragraph closed with a
    ")) marking at the end of the table, figure or paragraph is used to indicate that the entire content between the double brackets is proprietary. In each case, the superscript notation {3 l refers to Paragraph (3) of this affidavit, which provides the basis for the proprietary determination.

(3) In making this application for withholding of proprietary information of which it is the owner or licensee, GNF-A relies upon the exemption from disclosure set forth in the Freedom of Information Act ("FOIA"), 5 USC Sec. 552(b)(4), and the Trade Secrets Act, 18 USC Sec. 1905, and NRC regulations 10 CFR 9.17(a)(4), and 2.390(a)(4) for "trade secrets" (Exemption 4). The material for which exemption from disclosure is here sought also qualify under the narrower definition of "trade secret, within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Energy Project v. Nuclear Regulatory Commission, 975F2d871 (DC Cir. 1992), and Public Citizen Health Research Group v. FDA, 704F2dl280 (DC Cir. 1983). (4) Some examples of categories of information which fit into the definition of proprietary information are:

a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies;
b. Information which, if used by a competitor, would reduce his expenditure of resources or improve hi~ competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product;
c. Information which reveals aspects of past, present, or future GNF-A customer-funded development plans and programs, resulting in potential products to GNF-A ;

KGO-ENO-HKl-17-081Enclosure10 Affidavit Page l of 3

d. Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.

The information sought to be withheld is considered to be proprietary for the reasons set forth in paragraphs (4)a. and (4)b. above. (5) To address 10 CFR 2.390 (b) (4), the information sought to be withheld is being submitted to NRC in confidence. The information is of a sort customarily held in confidence by GNF-A, and is in fact so held. The information sought to be withheld has, to the best of my knowledge and belief, consistently been held in confidence by GNF-A, no public disclosure has been made, and it is not available in public sources. All disclosures to third parties including any required transmittals to NRC, have been made, or must be made, pursuant to regulatory provisions or proprietary agreements which provide for maintenance of the information in confidence. Its initial designation as proprietary information, and the subsequent steps taken to prevent its unauthorized disclosure, are as set forth in paragraphs (6) and (7) following. (6) Initial approval of proprietary treatment of a document is made by the manager of the originating component, the person most likely to be acquainted with the value and sensitivity of the information in relation to industry knowledge, or subject to the terms under which it was licensed to GNF-A. (7) The procedure for approval of external release of such a document typically requires review by the staff manager, project manager, principal scientist or other equivalent authority, by the manager of the cognizant marketing function (or his delegate), and by the Legal Operation, for technical content, competitive effect, and determination of the accuracy of the proprietary designation. Disclosures outside GNF-A are limited to regulatory bodies, customers, and potential customers, and their agents, suppliers, and licensees, and others with a legitimate need for the information, and then only in accordance with appropriate regulatory provisions or proprietary agreements. (8) The information identified in paragraph (2) is classified as proprietary because it contains details of GNF-A ' s fuel design and licensing methodology. The development of this methodology, along with the testing, development and approval was achieved at a significant cost to GNF-A. The development of the fuel design and licensing methodology along with the interpretation and application of the analytical results is derived from an extensive experience database that constitutes a major GNF-A asset. 1 (9) Public disclosure of the information sought to be withheld is likely to cause substantial harm to GNF-A's competitive position and foreclose or reduce the availability of profit-making opportunities. The information is part of GNF-A's comprehensive BWR safety and technology base, and its commercial value extends beyond the original development cost. The value of the technology base goes beyond the extensive physical database and KGO-ENO-HKI-17-081Enclosure10 Affidavit Page 2 of 3

analytical methodology and includes development of the expertise to determine and apply the appropriate evaluation process. In addition, the technology base includes the value derived from providing analyses done with NRC-approved methods. The research, development, engineering, analytical, and NRC review costs comprise a substantial investment of time and money by GNF-A. The precise value of the expertise to devise an evaluation process and apply the correct analytical methodology is difficult to quantify, but it clearly is substantial. GNF-A's competitive advantage will be lost if its competitors are able to use the results of the GNF-A experience to normalize or verify their own process or if they are able to claim an equivalent understanding by demonstrating that they can arrive at the same or similar conclusions. The value of this information to GNF-A would be lost if the information were disclosed to the public. Making such information available to competitors without their having been required to undertake a similar expenditure of resources would unfairly provide competitors with a windfall , and deprive GNF-A of the opportunity to exercise its competitive advantage to seek an adequate return on its large investment in developing and obtaining these very valuable analytical tools. I declare under penalty of perjury that the foregoing is true and correct. Executed on this 28th day of July 2017. Brian R. Moore General Manager, Core & Fuel Engineering Global Nuclear Fuel - Americas, LLC 390 I Castle Hayne Road Wilmington, NC 28401 Brian.Moore@ge.com KGO-ENO-HKI-17-081Enclosure10 Affidavit Page 3 of 3}}