Text
CA,TEQORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
~
~
CCESSION NBR:991
FACIL:50-335 St.
50-389 St.
AUTH. NAME
BOLAND,A.T.
RECIP.NAME
PLUNKETT,T.F.
0080203
DOC.DATE: 99/09/20
NOTARIZED: NO
Lucie Plant, Unit 1, Florida Power
R Light Co.
Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTHOR AFFILIATION
Region 2.(Post
820201)
RECIPIENT AFFILIATION
Florida Power
6 Light Co.
DOCKET
05000335
05000389
SUBJECT:
Forwards insp repts 50-335/99-05
Ec 50-389/99-05
on 990711-
0821.Three violations of NRC requirements identified
6 being
treated
as non-cited violations consistent with App
C of
DISTRIBUTION CODE: IE01F
COPIES
RECEIVED:LTR
I
ENCL
jt
SIZE:
TITLE: General
(50 Dkt)-Insp Rapt/Notice of Violation Response
NOTES:
E
INTERNAL:
RECIPIENT
ID CODE/NAME
LPD2-2
DEDRO
NRR/DZPM/ZIPB
NRR/DRIP/REXB
RGN2
FILE
0 1
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
RECIPIENT
"ID CODE/NAME
GLEAVES,W
/
FILE CENT
NRR DIPM OLHP
NUDOCS-ABSTRACT
OGC/RP
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
0
R
EXTERNAL: LMITCO MARSHALL
NRC PDR
1
1
1
1
NOAC
NUDOCS FULLTEXT
l
1
1
1
1
N
NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED: LTTR
18
ENCL
18
September 20, 1999
Florida Power and Light Company
ATTN:
Mr. T. F. Plunkett
President - Nuclear Division
P. O. Box 14000
Juno Beach, FL 33408-0420
SUBJECT:
NRC INTEGRATED INSPECTION REPORT NOS. 50-335/99-05, 50-389/99-05
Dear Mr. Plunkett:
This refers to the inspection conducted on July 11 through August 21, 1999, at your St. Lucie
Unit 1 and 2 reactor facilities. The enclosed report presents the results of that inspection.
During the inspection period, your conduct of activities at the St. Lucie facilitywas generally
characterized by safety conscious operations and well controlled maintenance and surveillance
activities. Reviews and self-assessments
associated with a November 1998 shutdown cooling
event were thorough and self-critical.
Based on the results of this inspection, the NRC has determined that three violations of NRC
requirements occurred.
These violations are being treated as non-cited violations (NCV),
consistent with Appendix C of the Enforcement Policy. These NCVs are described in the
subject inspection report. Ifyou contest the violations or severity level of these NCVs, you
should provide a response within 30 days of the date of this inspection report, with the basis for
your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington DC 20555-0001, with copies to the Regional Administrator, Region II, the Resident
Inspector at your facility, and the Director, Office of Enforcement, United States Nuclear
Regulatory Commission, Washington DC 20555-0001.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure willbe placed in the NRC Public Document Room.
Sincerely,
Docket Nos. 50-335, 50-389
( Original signed by A. Boland )
Anne T. Boland, Acting Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure: NRC Inspection Report Nos. 50-335/99-05
and 50-389/99-05
cc w/encl: (See page 2)
99'10080203
9'90920
ADQCK 05000335
8
0
cc w/encl:
J. A. Stall
Vice President
St. Lucie Nuclear Plant
6351 South Ocean Drive
Jensen
Beach, FL 34957
R. G. West
,Plant General Manager
St. Lucie Nuclear Plant
Electronic Mail Distribution
E. J. Weinkam
Licensing Manager
St. Lucie Nuclear Plant
Electronic Mail Distribution
J. Kammel
Radiological Emergency
Planning Administrator
Department of Public Safety
Electronic Mail Distribution
Douglas Anderson
County Administrator
St. Lucie County
2300 Virginia Avenue
Ft. Pierce, FL 34982
John Gianfrancesco, Manager
Administrative Support & Special Projects
Florida Power & Light Company
Electronic Mail Distribution
Mark Dryden
Administrative Support 8 Special Projects
Florida Power 8 Light Company
Electronic Mail Distribution
Rajiv S. Kundalkar
Vice President - Nuclear Engineering
Florida Power 8 Light Company
Electronic Mail Distribution
M. S. Ross, Attorney
Florida Power & Light Company
Electronic Mail Distribution
William A. Passetti
Bureau of Radiation Control
Department of Health
Electronic Mail Distribution
Joe Myers, Director
Division of Emergency Preparedness
Department of Community Affairs
Electronic Mail Distribution
Distribution w/encl
W. Gleaves, NRR
PUBLIC
- (See previous concurrence)
OFFICE
SICMATURE
NAME
DATE
COPY?
11:DRP
isaiI
9/
YES
NO
RII:DRP
TRoss
9/
/99
YES
NO
RI I:DRP
DLanyi
9/
/99
YES
NO
RI I IDRP
GMarnick
9/
/99
YES
NO
RII:DR
Lenahan
9/
/
YES
0
9/
J
/99
YES
MO
9/
/99
YES
MO
SEP"28-1999
15: 58
1 561 461 4622
P 82
Distribution wl
W..Gleaves. NRR
PUBLIC
SZGHLTU
RZZ:
RZZ:DRP
RZZ:DRS
COPY'?
SRudi.o~I.
TRoee
DLan~
s
YES
gO
g Sccpri~~
TOTAL P.82