ML17238A924

From kanterella
Jump to navigation Jump to search
Quad-Cities Units 1 and 2 - Notice of Issuance of Amendments to Facility Operating Licenses
ML17238A924
Person / Time
Site: Dresden, Quad Cities  Constellation icon.png
Issue date: 11/13/1978
From: Ippolito T
Office of Nuclear Reactor Regulation
To:
References
Download: ML17238A924 (2)


Text

J

.;l

  • ~* ~_,

., 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NOS. 50-237, 50-249, 50-254 AND 50-265 COMM(}JWEALTH EDISON COMPANY

~-

AND IOWA ILLINOIS GAS ANifE"LECTRIC COMPANY NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The U. S. Nuclear Regulatory Commission (the Commission) has issued an amendment each to Facility Operating License Nos. DPR-19, DPR-25, DPR-29 and OPR-30, issued to Commonwealth Edison Company (and, in the matter of License Nos. OPR-29 and DPR-30, the Iowa-Illinois Gas and Electric Company), which revised Technical Specifications for operation of each of the Dresden and Quad Cities Nuclear Power Stations (collectively referred to as the facilities). The Dresden Station consists of Unit Nos. 1, 2, and 3 and is located in Grundy County, Illinois. However, the actions noticed herein relate to Dresden Station Units 2 and 3. The Quad Cities Station consists of Unit Nos. l and 2 and is located in Rock Island County, Illinois. These amendments are effective as of their dates of issuance.

The amendments revise Technical Specifications to provide operating


*- temperature and pressure limits in accordance with Appendix G, 10 CFR Part 50.

The applications for the amendments comply with the standards 'and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The-Commission has made appro-priate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments. Prior public notice of these amendments was not required

  • since the amendments do not involve a significant hazards consideration.

\

l.

  • .:.*' IV The Commission has determined that the issuance of these amendments

_'!(_

will not result in any significant environmental impact and that pursuant to 10 CFR Section 5l.5(d)(4), an environmental impact statement or

. . u negative declaration and environmental impact appraisal need not be prepared in connection with issuance of the amendments.

For further details with respect to this action, see (l) the a~pli cations for amendments dated September 10, 1974 and May 17, 1976, as supplemented March 21, 1977 and March 13, 1978, (2) Amendment Nos. 39 and 37.

to License Nos. DPR-19, and DPR-25, (3) Amendment Nos. 48 and 47 to License Nos. DPR-29 and DPR-30, and (4) the Commission's related Safety Evaluation.

All of these items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N. W., Washington, D. C. and for those items relating to Dresden Unit Nos. 2 and 3 at the Morris Public Library, 604 Liberty Street, Morris, Illinois 60450 and for those items relating to *Quad Cities Unit Nos. l and 2 at the Moline Public Library, 504 -17th Street, Moline, Illinois 60625. A single copy of items (2), (3), and (4) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, Attention: Director, Division of Operating Reactors.

Dated at Bethesda, Maryland this 13th day of November 1978.

FOR THE NUCLEAR REGULATORY COMMISSION

~J~.#:

Th~~s'J\.~~l1to, Chief Operating Reactors Branch #3 Division of Operating Reactors

\\