- Commonwe. Edi so;~.
One Firs!* National Plaza, Chicago, llli:1oi::;
Address-FYep1y to: Pos-10ttice8ox-7Ef7 Chicago, Illinois 60690 i,.
I**
---,----..,;..,I *
- .: ~. :
- l.
. -: ~ *. *:.
... *' /
.*.*.-~ *.;.
. Mr. Angelo Giambusso,, Director Division of Reactor. Licensing
- .* u~s. Nuclear Regulatory commission Washington, D~C.
20555
Dear Mr. Giambusso:
.In response to, your letter dated October 19, 1973,
- .attached is a report which describes a study of the consequences of postulated A'rWS events.
This report entitled "Anticipated Transients With9ut Scram:
Study for Dresden 2, 3 and Quad-Cities*
1, 2 Nublear Power Stations"~ ~ED0-2084~, dated March 1975 is submitted in conformance with WASH-1270, Appendix A, Se.ct ion
.II.C.l.
As discussed iri previous letters to you dated December 10, 1973 and October 7, 1974, Commonwealth Edison Company considers a total failure to scra.."Tl in conjunction with a significant transient so unlikely that there is no significant risk associated with the ATWS event postulated_.
Further justification of this conclusion is contained' in the introduction of th~ attached report.
On the
/
bas.is of these considerations, backfitting the plant modifications identified in the attached report is not recommended; because the modifications will not significantly improve-public health and safety.
The analyses performed in the attached report used a re~
lief valve capacity which is available from eight (8) Target-Rock combination s(1fety-relief valves.. It is planned to modify alJ.. Qr~ _1 four (4) units.to the configuration of eight (8) combination Si~~t relief valves during.the Fall 1975 and{~)'t-eling outages.
I 3851
'. i.
- t.
. ---'----,_I.
.. ~. !.<-.
..... -~::.* *...
- ~***~***:""',.**.....,,,._
- .Mr.. Angelo '(;iambus so
- Page. 2 April 3, 1975
. ~ *:
. '*.*... *.: _.*\\*... *.
..... ~ ': :. *..
~
- :,,* : Presently, ail** four '(4) units are equipped with four * (4) electro..:..
- . inatic relief valves, one ( 1) combination safety-:-relief valve arid
- eig&t (8) spring sa~ety valvei.
s{nc~ the results of the analyses
- for the 8-valve confitjuration will overestimate the consequences for.the present 13-valve configuration, the report is.conservatively applicable to the. present plant configurations.
one (1) signed original and 39 copies of ):his study are
.. subn{itt~d for your information.
...,:~.
5.
... *.. :. :... ~. :..... '
- . *~.
Attachment *
.. very t r.uiy yours' 4~:;1*//.*... *...
... Lc-f':t d f~-l 0..
- J I
J *. S. Abel.
Nuc.lear Lfcensing Administrator Boiling Water Reactors*