MONTHYEARML24018A0862024-02-0101 February 2024 Examination Confirmation Letter No. 50-288/Ol-24-02, Reed College ML24017A0312024-01-18018 January 2024 Reed College, Examination Confirmation Letter 50-288/Ol-24-01 ML23289A1562023-10-25025 October 2023 Reed College 2022 Financial Test for Self-Guarantee for Decommissioning Funding ML23263B1622023-09-20020 September 2023 Reed Research Reactor 2022-2023 Annual Report ML23163A0132023-07-18018 July 2023 Examination Result Letter No. 50-288/OL-23-03, Reed College ML23163A0122023-07-18018 July 2023 Examination Report Letter No. 50-288/OL-23-03, Reed College ML23165A2312023-06-14014 June 2023 Reed Research Reactor (Docket No. 50-288/License No. R-112) 2022 Financial Assurance Update ML23139A1322023-05-16016 May 2023 Reed Research Reactor (Docket No. 50-288/License No. R-112) 2022 Financial Assurance ML23053A2402023-03-0606 March 2023 Examination Confirmation Letter No. 50-288/OL-23-03, Reed College ML23024A1732023-02-27027 February 2023 Examination Confirmation Letter No. 50-288/OL-23-02, Reed College ML23020A9372023-01-20020 January 2023 Reed College, Letter Intended to Fulfill the 14-day Written Report Requirement of Technical Specification 6.7.2, Special Reports, Following Operation in Violation of Limiting Conditions of Operation ML22241A1382022-09-0606 September 2022 Us Nuclear Regulatory Commission Staff Review Re Reed College 2021 Financial Test for Self-Guarantee for Decommissioning Funding ML22230B8022022-08-18018 August 2022 Annual Report for Reed College (Docket 50-288, License No. R-112) for the Period July 1, 2021 Through June 30, 2022 ML22229A5632022-08-17017 August 2022 Reed Research Reactor 2021-2022 Annual Report ML22199A2932022-07-28028 July 2022 Examination Confirmation Letter No. 50-288. OL-23-01, Reed College IR 05000288/20222022022-06-15015 June 2022 Reed College - U.S. Nuclear Regulatory Commission Routine Safety Inspection Report No. 05000288/2022202 IR 05000288/20222012022-06-14014 June 2022 Cover Letter - Reed College Nuclear Regulatory Commission Inspection Report No. 05000288/2022201 (Public) ML22019A1022022-02-0707 February 2022 Examination Confirmation Letter No. 50-288/OL-22-02, Reed College ML21258A3962021-10-0404 October 2021 U. S. Nuclear Regulatory Commission Staff Review Re Reed College 2020 Financial Test for Self-Guarantee for Decommission Funding NRC Ltr Rrr 2020 Financial Self Guarantee Draft ML21242A2362021-09-0808 September 2021 Reed College Regarding U.S. Nuclear Regulatory Commission Staff Review and Approval of the Revised Reed Research Reactor Requalification Plan ML21224A2032021-08-16016 August 2021 Examination Confirmation Letter No. 50-288/OL-22-01, Reed College ML21216A4392021-08-0404 August 2021 Reed College - Reed Research Reactor, Annual Report, July 1, 2020 - June 30, 2021 ML21174A1942021-06-23023 June 2021 Revised Reed Research Reactor Requalification Plan in ML21160A1792021-06-0808 June 2021 Reed College, Submitting Information Inadvertently Omitted from Letter Dated October 28, 2020 (ML21014A437) ML21202A1792021-06-0808 June 2021 Reed College - Submitting Information Inadvertently Omitted from Letter Dated October 28, 2020 (ML21014A437) IR 05000288/20212012021-06-0303 June 2021 Reed College U.S. Nuclear Regulatory Commission Routine Safety Inspection Report 05000288/2021201 ML21028A0922021-01-27027 January 2021 Examination Confirmation Letter No. 50-288/OL-21-02, Reed College ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20304A3152020-10-28028 October 2020 Self-report of a Violation of Reed Research Reactor'S Requalification Plan ML21014A4372020-10-28028 October 2020 Reed College - Financial Assurance for Reed Institute Dba Reed College and Financial Statements for the Reed Institute June 30, 2020 and 2011 9 ML20290A6802020-10-27027 October 2020 U.S. Nuclear Regulatory Commission Staff Review Reed College 2019 Financial Assurance (Self-Guarantee)(EPID No. L-2019-LLL-0034 ML20265A3972020-09-21021 September 2020 Reed College - Response to Notice of Violation 05000288/2020201 ML20266G5442020-09-21021 September 2020 Reed College - Change of Management Staff ML20247J6032020-09-0303 September 2020 Examination Confirmation Letter No. 50-288/OL-21-001, Reed College IR 05000288/20202012020-09-0202 September 2020 Reed College - U.S. Nuclear Regulatory Commission Routine and Confirmatory Order Follow-Up Inspection Report No. 05000288/2020201 ML20216A6772020-08-0303 August 2020 Reed Research Reactor Annual Report July 1, 2019 -- June 30, 2020 (Rev. 1) ML20189A3002020-07-0808 July 2020 Completion of Required Actions Under Confirmatory Order EA-19-071 Related to U.S. Nuclear Regulatory Commission Investigation Reports 4-2016-022 and 4-2017-023 ML20175A8322020-06-23023 June 2020 Reed College - Change of Management Staff ML20162A1902020-06-10010 June 2020 Reed College - Actions Under Confirmatory Order EA-19-071 ML20136A4062020-04-27027 April 2020 Transmittal of Proposed Security Plan at Reed College ML20098F1312020-04-0202 April 2020 NRC Reed TR 20200402 Request for Rvw Officials Ellis and Sams 4.2.20 ML20108F5312020-04-0101 April 2020 Reed College, Notification of Personnel Change Update ML20010G1772020-01-14014 January 2020 Examination Confirmation Letter No. 50-288/OL-20-02, Reed College ML19317D7912019-10-30030 October 2019 Financial Assurance and Financial Statements for the Reed Institute June 30, 2019 and 2018 ML19282A3882019-10-0202 October 2019 Reed College - Requesting Termination of Quality Assurance Program Approval Form for Radioactive Material Packages No. 0949, Revision 0, Docket No.71-0949 IR 05000288/20192012019-08-16016 August 2019 Reed College - U.S. Nuclear Regulatory Commission Security Inspection Report 05000288/2019201 ML19225C1642019-07-31031 July 2019 Transmittal of Security Plan at Reed College ML19211C0072019-07-24024 July 2019 Reed College, Transmittal of Annual Report July 1, 2018 - June 30, 2019 ML19155A1752019-06-13013 June 2019 U.S. Nuclear Regulatory Commission Staff Review Reed College 2018 Financial Assurance (Self-Guarantee) Docket No. 50 288 ML23130A2532019-04-29029 April 2019 Reed College, Management Change Update 2024-02-01
[Table view] |
Text
REED COLLEGE REACTOR FACILITY 3203 Southeast Woodstock Boulevard Portland, Oregon 97202-8199 Aug.23, 2017 telephone 503/777-7222 fax 503/777-7274 email reactor@reed.edu ATTN: Document Control Desk U.S. Nuclear Regulatory Commission web Washington, DC 20555-0001 http://reactor.reed.edu Docket: 50-288 License No: R-112
Subject:
NRC Tracking Number 52896 Enclosed is the follow up report per Reed Technical Specification TS 6.7.2.a.
For the notification to the NRC Operations Center 8/10/2017, NRC Tracking Number 52896.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on 'if/~~
I
/r:f Melinda Krahenbuhl, Ph.D.
Director, Reed Research Reactor
Follow-up report per Reed Technical Specification TS 6.7.2.a NRC Tracking Number 52896 On August 10, 2017, Reed College reported a potential violation of Technical Specifications 3.22. and 3.2.3. Specifically, the reactor was operated with the log channel inoperable at low powers due to noise in the signal. Due to the signal to noise ratio, the source interlock would not have actuated if the source had not been physically present, although the source interlock test was performed on the start-up checklist and functioned normally.
The operators discovered the noise in the log power signal during the start-up checklist on Aug 9, 2017. The data point collected from the log channel indicated a power level of 1.02 x 10-4 %
of full power. The typical shutdown power is~ 2.0 x 10-7% of full power. The scheduled reactor operation was terminated. The staff evaluated the recent start-up checklists to determine*
the cause and duration of the electronic noise on the log channel. The staff determined that the reactor was operated with the high noise to signal ratio on three previous runs. The data collected during the evaluation is contained the following table. An additional start-up was initiated on, 8/8/2017, however the reactor operations were terminated prior to criticality due to fluctuations in the high voltage readings of the linear channel.
Date Log channel readings with reactor shut down 8/1/17 7.75 xl0-6 8/3/17 1.24 xl0-4 8/4/17 2.15 xl0-4 8/8/17 1.02 x 10-'I The evaluation also induded reviewing the electronic logs of the log channel readings. This review found that the noise is most often but not exclusively associated with the status of console power. The noise was removed by repositioning the log channel's signal cable. The manufacturer was contacted to help find and implement a means of preventing future incidents of excessive noise in the signal.
In order to deter future operations when noise obscures the log channel's signal at low power, two changes have been made to the start-up checklist.
- 1. An acceptable range for the log power channel power at start-up was added. This range excludes the readings associated with noise in the table above, and should prevent operations if noise is obscuring the signal.
- 2. The log channel's operability will be verified by evaluating its response to the control rod movement. This operability test is already used for the linear power channel. The resulting change in power is small enough to be completely obscured by noise. Therefore the test is well suited to identifying noise related problems.
These two changes are largely redundant and should reinforce continued and on-going training on the importance of the log channel and source interlock function.