Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9611290246
DOC.DATE: 96/11/22
NOTARIZED: NO --
DOCKET
FACIL:50-331 Duane Arnold Energy Center,
Iowa Electric Light
& Pow
05000331
AUTH.NAME 'UTHOR AFFILIATION
GRANT,G.E. 'egion
3 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
LIU,L.
IES Utilities Inc., (formerly Iowa Electric Light
& Power
C
SUBJECT:
Forwards
insp rept 50-331/96-08
on 961015.Violations
noted.
violations involved
NRC identified failure to adequately
control personnei
access
to vital areas.
DISTRIBUTION CODE:
IE04D
COPIES
RECEIVED:LTR $
ENCL
]
SIZE:
TITLE: Safeguards
Inspection
Rpt/NOV Response
(50 DKT)-Publicly Ava1lable
NOTES:
E
RECIPIENT
ID CODE/NAME
PD3-3
INTERNAL: ACRS
NRR/DISP/PIPB
OE DIR
EXTERNAL: NOAC
COPIES
LTTR ENCL
1
1
1
1
1
0
1
1
1
1
RECIPIENT
ID CODE/NAME
KELLY,G.
FILE "CENTER
NUDOCS-ABSTRACT
RGN3
FILE
01
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
0
D
0
E
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
10
ENCL
9
November 22,
1996
Nr. Lee Liu
Chairman of the Board, President,
and Chief Executive Officer
IES Utilities Incorporated
200 First Street
S.
E.
P.O.
Box 351
Cedar Rapids,
SUBJECT:
NRC
DUANE ARNOLD ENERGY CENTER SECURITY INSPECTION
REPORT
NO. 50-
331/96008(DRS)
Dear Hr. Liu:
On October
15,
1996,
the
NRC completed
a security inspection at your Duane
Arnold Energy Center reactor facility.
The enclosed
report presents
the
results of that inspection.
Areas
examined during the inspection
are identified in the report.
Within
'hese
areas,
the inspection consisted
of a selective
examination of procedures
and representative
records,
interviews with personnel,
and observations
of
activities in progress.
The purpose of the inspection effort was to determine
whether activities authorized
by the license
were conducted
safely
and in
accordance
with NRC requirements.
The summary contained
in the report
provides
an overview of our assessment
of your performance
in the area of
physical security.
The inspection
was to initiate the security core
inspection
as identified in Inspection
Procedure
81700
and to conduct
an
initial inspection of your Vehicle Barrier System.
Two violations of NRC requirements
were noted in the areas
inspected.
The
first involved multiple examples of inadequacies
in your vehicle search
program.
Two of three
examples
were identified by the
NRC inspector.
The
repetitive nature of these findings concern
us
and
may
be indicative of
broader
weaknesses.
The second violation involved an
NRC identified failure
to adequately
control personnel
access
to vital areas.
Vital area
access
was
granted to 71 personnel
that did not have
a need to have
access
to some vital
areas.
Our identification of this problem was accomplished
by simple
comparisons
of available information that could easily
have
been
completed
by
your staff.
9hii290246 9hii22
ADQCK 0500033i
6
s-'"~"u.'a!ii)s
I
~()
' ~"
4 4IVl sag'
L. Liu
November 22,
1996
The material
enclosed
herewith contains
Safeguard
Information as defined
and -its disclosure to unauthorized
individuals is prohibited by
Section
147 of the Atomic Energy Act of 1954,
as
amended.
Therefore,
the
material will not be placed in the Public Document
Room.
Sincerely,
Original Signed
by Brent Clayton (for)
Geoffrey
E. Grant, Director
Division of Reactor Safety
Docket No. 50-331
License
No.
Enclosures:
1.
2.
Inspection
Report
No.
50-331/96008(DRS)
(SAFEGUARDS
INFORMATION)
cc w/encls:
G.
Van Hiddlesworth,
Plant Manager
K.
E. Peveler,
Manager,
Licensing
and
Emergency
Planning
NRR/DRIS/RSGB9D
NMSS/HIGDON/4E4
OE Director
cc w/encls,
w/o
SAFEGUARDS
INFORMATION:
Chairperson,
Iowa Utilities Board
Distribution:
Docket File w/o encls
DRS w/o encls
PUBLIC IE-04 w/o encls
RIII PRR w/o encls
OC/LFDCB w/o encls
SRI,
DAEC w/o encls
DRP w/o encls
LPH,
NRR w/o encls
A. B. Beach, RIII w/o encls
Enf. Coordinator, RIII w/o encls
CAAl w/o encls
(E-mail)
W. L. Axelson, RIII w/o encls
DOCUMENT NAME:
A:DUA96008.DRS
To receive a copy of this document, indicate in the born
C
~ Copy without attachment/enciosure
E
e Copy with attachment/enciosure
N
e No copy
OFFICE
RI I
THad da:j
NAME
DATE 'l//~96
RIII
MJordan
11/8 /96
RII
JCre
11/ 2,< /96
RIII
BClayton/GGrant
11/ ~~/96
OFFICIAL RECORD
COPY
En ?oars
go."
SLFXg
T10$