March 27, 1996 Florida Power and Light Company ATTN:

Mr. T.

F. Plunkett President - Nuclear Division

~

P. 0.

Box 14000 Juno

Beach, FL 33408-0420

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR)

ST.

LUCIE 1

AND 2

Dear Mr. Plunkett:

On February 28,

1996, the regional staff completed the semiannual Plant Performance Review (PPR) of St.

Lucie Unit 1 and Unit 2.

The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.

The results are used by regional management to facilitate planning and allocation of inspection resources.

The PPR for St. Lucie involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period September 1995 through February 1996.

PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the St

~ Lucie PPR review.

It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite.

The enclosure details our inspection plan for the next six (6) months.

The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reasons for emphasis in these program areas.

Resident inspections are not listed due to their ongoing and continuous nature.

During each NRC inspection planned during this period, specific attention will be given to the verification of selected UFSAR commitments.

Applicable portion(s) of the UFSAR that relate to the inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant practices, procedures and/or parameters.

The goal is to determine the accuracy of the UFSAR regarding existing plant practices and conditions by providing specific attention to the UFSAR when performing various reactor inspections.

Inspectors will not be judging the overall completeness of the UFSAR; rather, the inspections will focus on identifying differences between the UFSAR description and the plant, OFFICIlU COPY

FP&L We will inform you of any changes to the inspection plan.

If you have any questions, please contact me at 404-331-5509.

Sincerely, Orig signed by Kerry D. Landis Kerry D. Landis, Chief Reactor Projects Branch 3

Division of Reactor Projects Docket Nos.

50-335, 50-389 License Nos.

DPR-67, NPF-16

Enclosure:

Inspection Plan cc w/encl:

W.

H. Bohlke, Vice President St.

Lucie Nuclear Plant P. 0.

Box 128 Ft. Pierce, FL 34954-0128 H.

N. Paduano, Manager Licensing and Special Programs Florida Power and Light Company P. 0.

Box 14000 Juno

Beach, FL 33408-0420 J. Scarola Plant General Manager St.

Lucie Nuclear Plant P. 0.

Box 128 Ft. Pierce, FL 34954-0128 E.

Weinkam Plant Licensing Manager St.

Lucie Nuclear Plant P. 0.

Box 128 Ft. Pierce, FL 34954-0218 J.

R.

Newman, Esq.
Morgan, Lewis

& Bockius 1800 M Street, NW Washington, D.

C.

20036 John T. Butler, Esq.

Steel, Hector and Davis 4000 Southeast Financial Center
Miami, FL 33131-2398 cc:

Continued see page 3

FP&L cc:

Continued Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Jack Shreve Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, FL 32399-1400 Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Thomas R,

L, Kindred County Administrator St.

Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982 Charles B. Brinkman Washington Nuclear Operations ABB Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 3300 Rockville, MD 20852 Distribution w encl:

J. Norris, NRR G. Hallstrom, RII PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Comm.

7585 South Highway AIA Jensen

Beach, FL 34957-2010 OFFICE SIGNATURE

///SCR'//s 3 /Z~/ 96 CCosto HChristenson NAME 03/K /96 DATE

/96 YES NO COPY)

E NO ES NO OFFICIAL R CORD COPY UHENT NAHEt G:iPPR-ST.LTR PFr r'c n

96 E

NO KB r

0

/

96 YES NO TPoobles 0 /l /96

ST. LUCIE - lNSPECTlON PLAN INSPECTION PROCEDURE/

TENPORARY INSTRUCTION TITLE/PROGRAN AREA NUNBER OF INSPECTORS

'LANNED INSPECTION DATES TYPE OF INSPECTION-CONNENTS 71001 61726 62703 INITIAL OPERATOR EXAMINATION INITIALOPERATOR EXAMINATON LICENSED OPERATOR RE(UALIFICATION PROGRAM EVALUATION MAINTENANCE OBSERVATIONS SURVEILLANCE OBSERVATIONS 3/25/96 RE(VALIF ICATION PROGRAM INSPECTION 3/25/96 CORE INSPECTION 3/1 1/96 PREPARATION 3/25/96 ADMINISTRATION OF EXAM 81700 4XXXX 62700 37550 73753 40500 92720 PHYSICAL SECURITY PROGRAM FOR POWER REACTORS EHPLOYEE CONCERNS PROGRAM MAINTENANCE IMPLEMENTATION ENGINEERING INSERVICE INSPECTION EFFECTIVENESS OF LICENSEE CONTROLS IN IDENTIFYING RESOLVING, AND PREVENTING PROBLEMS; CORRECTIVE ACTION REVIEW 4/1/96 4 29 96 5/6/96 5

13 96 5

13 96 6/24/96 CORE SAFEGUARDS REGIONAL INITIATIVE REGIONAL INITIATIVE MAINTENANCE OUTAGE ACTIVITIES'ROCEDURES CORE 50.59 FOCUS CORE MAINTENANCE INSPECT STATUS OF PERFORMANCE IMPROVEMENT PROGRAM; DILUTION EVENT FOLLOW-UP 61726 62703 37500 MAINTENANCE OBSERVATION SURVEILLANCE OBSERVATION ENGINEERING 6/24/96 CORE MAINTENANCE AND SURVEILLANCE 7/22/96 FSAR CORRECTIVE ACTIONS

INSPECTION PROCEDURE/

TEMPORARY INSTRUCTION 84750 86750 62700 71715 81700 83750 62706 40500 71001 TITLE/PROGRAM AREA RADIOACTIVE WASTE TREATMENT AND EFFLUENT AND ENVIRONHENTAL MONITORING; SOLID RADIOACTIVE WASTE HANAGEHENT AND TRANSPORTATION OF RADIOACTIVE MATERIAL MAINTENANCE IMPLEMENTATION LICENSED OPERATOR REQUALIFICATION PROGRAM EVALUATION PHYSICAL SECURITY PROGRAM FOR POWER REACTORS OCCUPATIONAL RADIATION EXPOSURE MAINTENANCE RULE INSPECTION PROCEDURE EFFECTIVENESS OF LICENSEE CONTROLS IN IDENTIFYING, RESOLVING, AND PREVENTING PROBLEMS LICENSED OPERATOR REQUALIFICATION PROGRAM EVALUATION NUMBER OF PLANNED INSPECTORS INSPECTION DATES 8/5/96 8/19/96 9/9/96 9/9/96 9 9 96 9/16/96 10/7/96 11/18/96 TYPE OF INSPECTION COMMENTS CORE FOCUS ON BOP AND EDG MAINTENANCE PLANT OPERATIONS FOCUS ON COMMAND, CONTROL, COMMUNICATION AND NORMAL CR OBSERVATION CORE - SAFEGUARDS CORE INSPECTION EDG MAINTENANCE PROCEDURE ADEQUACY AND SAFETY SYSTEM PERFORMANCE INSPECT STATUS OF PERFORMANCE IMPROVEMENT PROGRAM REQUALIFICATION PROGRAM INSPECTION