Discusses 950518 Telcon W/A Marion & B Bradley Re Ampacity Derating Issues for Thermo-Lag Fire Barriers
ML17229B440
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/22/1995
From: Berlinger C
NRC (Affiliation Not Assigned)
To: Sheron B
NRC (Affiliation Not Assigned)
Shared Package
ML17229B441 List:
References
NUDOCS 9509140068
Download: ML17229B440 (6)


Text

, ~

~

May 22, 1995 NOTE TO:

Brian M.

S on, Director, DE, NRR FROM:

Carl H. Berlinger, Chief, EELB, DE, NRR

SUBJECT:

MEMORANDUM OF RECORD On Hay 18,

1995, members of the NRC staff (B. Sheron, C. Berlinger, P. Gill, H. Gamberoni and R. Jenkins) held a telephone conference call with Hr. Alex Marion and Hr. Biff Bradley of the Nuclear Energy Institute (NEI) on ampacity derating issues for Thermo-Lag fire barriers.

Hr. Harion contacted the staff regarding two topics:

(I) Status of the Safety 'Evaluation (SE) on the Comanche Peak Steam Electric Station (CPSES),

Unit 2 Ampacity Derating Test Program; and (2) Staff Acceptance of the IEEE Standard

P848, "Procedure for the Determination of the Ampacity Derating of Fire Protected Cables."

Dr. Berlinger stated that the subject SE for CPSES 2 ha'd been completed and we expected that it will be transmitted to the licensee within the next two weeks.

Dr. Berlinger agreed to notify Mr. Marion by phone after the SE had been issued by the staff.

Due to potential generic applications the staff will provide a copy of the

CPSES, Unit 2 SE to licensees with Thermo-Lag fire barriers.

The staff has been interfacing with the IEEE Task Force responsible for IEEE P848 over the last 2 years to improve the subject procedure.

This effort has resulted in recent revisions to the subject procedure which addressed the majority of the concerns raised by EELS (reference:

Letter dated 10/13/94 from C. Berlinger to A. K. Gwal).

Although not all of'he concerns were addressed by the IEEE Task Force Or. Berlinger indicated that the latest IEEE P848 draft procedure can be used by licensees or NEI as the basis for an ampacity derating test program.

The latest procedure revision (Draft 16) addresses the major test concerns regarding inductive heating and conduit surface emissivities effects.

The staff emphasized that licensees should submit the actual test procedures or plans to the staff for comment.

After discussion of the various options to develop a generic test program NEI agreed to review the CPSES 2

SE and then contact the staff as necessary for further discussions or questions on this matter.

cc:

Alex Harion, NEI CONTACT:

Ronaldo Jenkins, EELB/DE 415-2985

GCLainas, NRR
KSMest, NRR EELS R/F
AThadani, NRR MGamberoni, NRR SPLB TSI File Document Name:

G:)SHARED)FY95NEI.NOT To recetve a c of thfa dockcaent fndtcate fn the box CK u/o attachmentlencloaure E~C ulth attachasentlencloaure M ~ No copy OFFICE DATE EELB:DE:NRR t

SC EELB:DE:NRR

+

C EELB:DE:NRR RJenkins:nk PGlll~

CHBerlin e 05 /0 /95 05/

95 05/95 OFFICIAL R CORO COPY

~,

k

June 3, 1996 DISTRIBUTION D5Icket F-ile~

'dg.= File

,, B. Clayton L. Wiens MEMORANDUMTO:

Rules Review and Directives Branch Division of Freedom of Information and Publications Services Office of Administration I

A Office of Nuclear Reactor Regulation FROM:

SUBJECT:

NOTICE OF CONSIDERATION OF ISSUANCE OF AI1ENDNENT

{TAC NO. H95472)

One signed original of the Federal Register Notice identified below is attached for your transmittal to the Office of the Federal Register for publication. Additional conformed copies

(

5

) of the Notice are enclosed for your use.

Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s):

Time for submission of Views on Antitrust matters.

Notice of Consideration of Issuance of Amendment to Facility Operating License.

(Call with gg-day insert date).

15 Notice of Receipt of Application for Facility License(s); Notice of Availabilityof Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

Notice of Availabilityof NRC Draft/Final Environmental Statement.

Notice of Limited Work Authorization.

Notice of Availabilityof Safety, Evaluation Report.

Notice of Issuance of Construction;Permit(s).

Notice of Issuance of Facility Operating License(s) or Amendment(s).

Order.

Exemption.

Notice of Granting Exemption.

Environmental Assessment.

Notice of Preparation of Environmental Assessment.

Receipt of Petition for Director's Decision Under 10 CFR 2.206.

Issuance of Final Director's Decision Under 10 CFR 2.206.

Other:

DOCKET NO.

50-335 Attachment(s):

As stated

Contact:

B. Clayton Telephone:

415-3475 DOCUMENT NAME:

To receive a copy of thhr document,'Indicate in the bore C

Copy without attachmentlenciosure OFFICE NAME DATE OFFICIALRECORD COPY E

~ Copy with attachrnentlenclosure

~ No copy

1

Ouly 8, 1996 D>stribut~on St. Lucie Rdg.

L."Wiens B. Clayton MEMORANDUMTO:

Rules Review and Directives Branch Division of Freedom of Information and Publications Services Office of Administration FROM:

SUBJECT:

Office of Nuclear Reactor Regulation RECEIPT OF PETITION FOR DIRECTOR'S DECISION UNDER 10 CFR',2.206 One signed original of the Federal Register Notice identified below is attached for your transmittal to the Office of the Federal Register for publication.

Additional conformed copies

(

) of the Notice are enclosed for your use.

Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s):

Time for submission of Views on Antitrust matters.

Notice of Consideration of Issuance of Amendment to Facility Operating License.

(Call with 30-day insert date).

Notice of Receipt of Application for Facility License(s); Notice of Availabilityof Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

Notice of Availabilityof NRC Draft/Final Environmental Statement.

Notice of Limited Work Authorization.

Notice of Availabilityof Safety Evaluation Report.

Notice of Issuance of Construction Permit(s).

Notice of Issuance of Facility Operating License(s) or Amendment(s).

Order.

Exemption.

Notice of Granting Exemption.

Environmental Assessment.

Notice of Preparation of Environmental Assessment.

Qg Receipt of Petition for Director's Decision Under 10 CFR 2.206.

Issuance of Final Director's Decision Under 10 CFR 2.206.

Other:

DOCKET NO.

Attachment(s):

As stated

Contact:

L. Wiens Telephone:

4" 5 "495 DOCUMENT NAME:

To receive e copy of this document, indicete in the box:

C

~ Copy without ettechment/enclosure

'E" ~ Copy with attachment/enclosure N

~ No copy OFFICE NAME DATE S

der s 7 8 OFFICIALRECORD COPY

l'