ML17229B037
| ML17229B037 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 02/26/1999 |
| From: | Christensen H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Plunkett T FLORIDA POWER & LIGHT CO. |
| References | |
| 50-335-99-04, 50-335-99-4, 50-389-99-04, 50-389-99-4, NUDOCS 9903090358 | |
| Download: ML17229B037 (8) | |
Text
GA. J. 64U ZL X REGULAT Y INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9903090358 DOC.DATE: 99/02/26'OTARIZED:
NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
50-389 St.'Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTH.NMCE AUTHOR AFFILIATION CHRISTENSEN,H.
Region 2 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION PLUNKETT,T.F.
Florida Power
& Light Co.
DOCKET I 05000335 05000389
SUBJECT:
Discusses arrangements made during 990218 telephone conservation for administration of licensing exams at St.--
Lucie NPP during 990628-0702.Requests exam outlines by 990427
& copy of ref matls by 990518.
DISTRIEUTION CODE:
IE42D COPIES RECEIVED: LTR I
ENCL"g SIZE:
TITLE: Operator Licensing Examination Reports NOTES:
E RECIPIENT ID CODE/NAME PD2-3 PD INTERNAL: ACRS NRR/DRCH/HOHB EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME GLEAVES,W FIL~@
RGN2 FILE 01 NRC PDR COPIES LTTR'ENCL 0
.'M N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTETH TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM'DISTRIBUTION'LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTRL RUNNER OF COPIES REQUIRED:
LTTR 8
ENCL Q'
February 26, 1999 Florida Power and Light Company ATTN:
Mr. T. F. Plunkett President - Nuclear Division P. O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
REACTOR AND SENIOR REACTOR OPERATOR INITIALEXAMINATIONS ST. LUCIE NUCLEAR PLANT-50-335/99-04 AND 50-389/99-04
Dear Mr. Plunkett:
ln a telephone conversation on February 18, 1999, between Mr. Tim Bolander and Mr. George Hopper, License Examiner, arrangements were made for the administration of licensing examinations at the St. Lucie Nuclear Plant during the period June 28-July 2, 1999.'our staff willprepare the proposed examinations in accordance with the guidelines in Interim Revision 8, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."
The NRC regional office willdiscuss with your staff any examination changes that might be necessary prior to their administration.
It is requested that your staff coordinate with the chief examiner to determine the appropriate quantity of operating test items necessary to maintain sequestering of candidates to a mutually acceptable level during the examination week.
To meet the above schedule, it will be necessary for your staff to furnish the proposed examination outlines by April27, 1999. Two copies of the proposed written examinations, two copies of the proposed operating tests, and one copy of the supporting reference materials identified in Attachment 2 of ES-201 will be due by May 18, 1999. Any delay in receiving the
~ required reference and examination materials or the submittal of inadequate or incomplete materials may result in the examinations being rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402 and to make the simulation facility available on the dates noted above.
In accordance with ES-302, your staff should. retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
Your staff should submit preliminary reactor operator and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC willbe able to review the applications and medical certifications, and evaluate any requested waivers.
Ifthe applications are not received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least 14 day's before the first examination date.
9903090358 990226 PDR ADQCK 05000335 V
PDR P
FP&L This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires April 30, 2000. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per
- response, including gathering, xeroxing and mailing the required reference material; the estimated average burden to prepare the examinations is 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />.
Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Mail Stop T-6 F33, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and Budget, Washington, D.C. 20503.
Thank you for your cooperation in this matter.
Mr. Bolander has been'advised of the policies and guidelines referenced in this letter.
Ifyou have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Hopper at (404) 562-4645, or myself at (404) 562-4638.
Sincerely, Docket Nos.: 50-335, 50-389 License Nos.: DRP-67, NPF-16 (Oriiginal signed by H. O. Christensen).
Harold O. Christensen, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety CC:
J. A. Stall Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL'4957 R. G. West Plant General Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FI 34957 E. J. Weinkam Licen'sing Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957 cc cont'd: ( see page 3)
FPLL cc cont'd:
John Gianfrancesco, Manager Administrative Support. L Special Projects Florida Power 8 Light Company P. O. Box 14000 Juno Beach,'FL 33408-0420 Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power 8 Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 M. S. Ross, Attorney Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 WilliamA. Passetti Bureau of Radiation Control Department of Health and Rehabilitative Services 2020 Capital Circle SE, Bin OC21 Tallahassee, FL 32399-1741 Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive
, Tallahassee, FL 32399-2100 J. Kammel Radiological Emergency Planning Administrator Department of Public Safety 6000 SE Tower Drive
'tuart, FL 34997 Douglas Anderson County Administrator St. Lucie County
'300 Virginia Avenue Ft. Pierce,.FL 34982 D. L. Fadden Training Manager St. Lucie Nuclear Plant
~
6351 South Ocean Drive Jensen Beach, FL 34957 Distribution: (see page 4)
I
FP&L Distribution:
L. Plisco, Rll R. Schin, Rll W. Gleaves, NRR G. Hopper,'Rll PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 6090 Jensen Beach, FL 34957 OFFICE SIGNATURE NAME RII:DRS RBaldwln RII:DRS CC rlstensen R I:DRP ert RII:DRS C hrlstonson DATE COPY?
YES No ES NO YES No OF ALRECORD C PY DOCUMENTNAME: G:
ES NO t120DLTR.WPD 2/
/99 YES No 2/
/99 YES No 2/
/99 YES NO