ML17229A896

From kanterella
Jump to navigation Jump to search
Informs That During 981028 Telcon Between T Bolander & G Hopper,Arrangements Were Made for Administration of Licensing Exam Repts 50-335/98-302 & 50-389/98-302 at Plant During Period of 981130-1218
ML17229A896
Person / Time
Site: Saint Lucie  
Issue date: 10/29/1998
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Plunkett T
FLORIDA POWER & LIGHT CO.
References
50-335-98-302, 50-389-98-302, NUDOCS 9811040170
Download: ML17229A896 (5)


See also: IR 05000335/1998302

Text

~

CATEGORY

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9811040170

DOC.DATE: 98/10/29

NOTARIZED: NO

FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power

6 Light Co.

50-389 St. Lucie Plant, Unit 2, Florida Power

&, Light Co.

AUTH.NAME

AUTHOR AFFILIATION

PEEBLES,T.A.

Region

2 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

PLUNKETT,T.F.

Florida Power

& Light Co.

SUBJECT: Informs that during 981028 telcon between

T Bolander

&

G Hopper, arrangements

were made for administration of

licensing

exam repts

50-335/98-302

& 50-389/98-302 at plant

during period, of 981130-1218.

DISTRIBUTION CODE:

IE42D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: Operator Licensing Examination Reports

NOTES:

DOCKET I

05000335

05000389

E

RECIPIENT

ID CODE/NAME

PD2-3

PD

'COPIES

LTTR ENCL

RECIPIENT

ID CODE/NAME

GLEAVES,W

COPIES

LTTR ENCL

0

INTERNAL: ACRS

NRR/DRCH/HOHB

EXTERNAL: NOAC

ILE C NTER

RGN2

I

01

NRC PDR

D

0

N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THF NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

8

ENCL

October 29,

1998

Florida Power and Light Company

ATTN:

Mr. T. F. Plunkett

President - Nuclear Division

P. O. Box 14000

Juno Beach, FL 33408-0420

SUBJECT:

REACTOR AND SENIOR REACTOR OPERATOR INITIALEXAMINATIONS

ST. LUCIE NUCLEAR PLANT- 50-335/98-302 AND 50-389/98-302

Dear Mr. Plunkett:

In a telephone conversation on October 28, 1998 between Mr. Tim Bolander and Mr. George

Hopper, License Examiner, arrangements

were made for the administration of licensing

examinations at the St. Lucie Nuclear Plant during the period November 30, 1998 through

December 18, 1998.

Your staff willprepare the proposed examinations in accordance with the guidelines in Interim

Revision 8, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."

The NRC regional office willdiscuss with your staff any examination changes that might be

necessary prior to their administration.

Mr. Bolander has coordinated with the chief examiner

and developed the appropriate quantity of operating test items necessary to maintain

sequestering

of candidates to a mutually acceptable

level during the exam weeks.

This

material has been delivered to the chief examiner for review.

In order to conduct the requested written examinations and operating tests, it willbe necessary

for your staff to provide adequate space and accommodations

in accordance with ES-402 and

to make the simulation facilityavailable on the dates noted above.

In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures,

and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that willbe in

effect while the written examinations and operating tests are being administered.

Your staff should submit preliminary senior reactor operator license applications and waiver

requests at least 30 days before the first examination date so that the NRC willbe able to

review the applications and the medical certifications and evaluate any requested waivers.

If

the applications are not received at least 30 days before the examination date, a postponement

may be necessary.

Signed applications certifying that all training has been completed should

be submitted at least 14 days before the first examination date.

o~S~~"

98ii040i70 98i029

PDR

ADQCK 05000335

V

PDR

FPKL

2

This request is covered by Office of Management and Budget (OMB) Clearance Number

3150-0101, which expires April30, 2000. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per

response,

including gathering, xeroxing and mailing the required reference material; the

estimated average burden to prepare the examinations is 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />.

Send comments

regarding this burden estimate or any other aspect of this collection of information, including

suggestions for reducing this burden, to the information and Records Management Branch,

Mail Stop T-6 F33, Office of Information Resources

Management,

U.S. Nuclear Regulatory

Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101),

Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and Budget,

Washington, D.C. 20503.

Thank you for your cooperation in this matter.

Mr. Tim Bolander has been advised of the

policies and guidelines referenced in this letter. Ifyou have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Rick Baldwin at (404) 562-4642, or

myself at (404) 562-4638.

Sincerely,

(Original signed

by T.

A

Peebles)

Docket Nos.: 50-335, 50-389

License Nos.: DRP-67, NPF-16

Thomas A. Peebles, Chief

Operator Licensing and Human

Performance Branch

Division of Reactor Safety

CC:

J. A. Stall

Vice President

St. Lucie Nuclear Plant

6351 South Ocean Drive

Jensen

Beach, FL 34957

R. G. West

Plant General Manager

St. Lucie Nuclear Plant

6351 South Ocean Drive

Jensen

Beach, FL 34957

E. J. Weinkam

Licensing Manager

St. Lucie Nuclear Plant

6351 South Ocean Drive

Jensen

Beach, FL 34957

cc cont'd: ( see page 3)

FP&L

cc cont'd:

John Gianfrancesco, Manager

Administrative Support & Special Projects

Florida Power & Light Company

P. O. Box 14000

Juno Beach, FL 33408-0420

Rajiv S. Kundalkar

Vice President - Nuclear Engineering

Florida Power & Light Company

P. O. Box 14000

Juno Beach, FL 33408-0420

M. S. Ross, Attorney

Florida Power & Light Company

P. O. Box 14000

Juno Beach, FL 33408-0420

William A. Passetti

Bureau of Radiation Control

Department of Health and

Rehabilitative Services

2020 Capital Circle SE, Bin ¹C21

Tallahassee,

FL 32399-1741

Joe Myers, Director

Division of Emergency Preparedness

Department of Community Affairs

2740 Centerview Drive

Tallahassee,

FL 32399-2100

J. Kammel

Radiological Emergency

Planning Administrator

Department of Public Safety

6000 SE Tower Drive

Stuart, FL 34997

Douglas Anderson

County Administrator

St. Lucie County

2300 Virginia Avenue

Ft. Pierce, FL 34982

D. L. Fadden

Training Manager

St. Lucie Nuclear Plant

6351 South Ocean Drive

Jensen

Beach, FL 34957

Distribution: (see page 4)

FP8L

Distribution:

L. Plisco, Rll

R. Schin, Rll

W. Gleaves, NRR

G. Hopper, Rll

PUBLIC

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

P. O. Box 6090

Jensen

Beach, FL 34957

OFFICE

SIGNATURE

RII:DRS

RII:DRS

RII:DRP

RII:DRS

GHopper

g0

L POC

LWert

TP

Ies

DATE

COPY? .

10/ Zq/98

10/

/98

YES

NO

10/

/98

YES

No

10/Z. /98

ES

NO

Es

NO

YE

NO

0

ALRECORD

Y

DOCU

NT NAME: IAO

ALA TL5120DLTR.WPD

10/

/98

10/

/98

YES

NO

YES

NO