Apri i 4, 1997 Florida Power and Light Company ATTN Mr. T.
F. Plunkett President
- Nuclear Division P. 0.
Box 14000 Juno Beach.
FL 33408-0420
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR)
- ST.
LUCIE 1 AND 2
Dear Mr. Plunkett:
On March ll, 1997, the regional staff completed the semiannual Plant Performance Review (PPR) of St. Lucie Unit 1 and Unit 2.
The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.
The results 'are used by regional management to facilitate planning and allocation of inspection resources.
The PPR f'r St. Lucie involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period from September 1996 to March 1997.
PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the St. Lucie PPR review.
It is provided in an attempt to minimize the resource impact-on your statf and to allow for scheduling conflicts to be resolved in
.advance of inspection dates.
The enclosure presents our inspection plan for the next six months.
Specific dates are included for near term inspections'.
Long term inspection dates will be announced prior to the inspections and any scheduling conflicts will be resolved with your staff.
The rational or basis for each inspection outside the core inspection program is provided so that you are aware of the reasons for emphasis in these program areas.
Resident inspections are not listed due to their ongoing and continuous nature.
nor are region based, inspections which accomplish Resident Core'odules to compensate for Resident Inspector absences due to training.
During each NRC inspect'ion planned during this period. specific attention will continue to be given to the verification ot selected Updated Final Safety Analysis Report (UFSAR) commitments.
Applicable portion(s) of the UFSAR that, relate to the inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant practices, procedures and/or parameters.
OFFICiAL COPY 9704i70240 9'70404 PDR ADQCK 05000335 6
PDR Illl.'Illl]llllGllll'jll:lilt'IlllllHlflllll
FP8L 2
We will inform you of any changes to tPe inspection plan.
If you.have any questions, please. contact me at 404-331-5526.
Sincerely, Orig sighted by Kerry D. Landis Caudle A. Julian, Acting Chief Reactor Projects Branch 3
Division of Reactor Projects Docket Nos.
50-335, 50-389 License Nos.
Enclosure:
St. Lucie Inspection Plan.
cc w/encl:
J.
A. Stall, Site Yice President St. Lucie Nuclear Plant P. 0.
Box 128 Ft. Pierce, FL
.34954-0128 H.
N. Paduario, Manager Licensing and Special Programs Florida Power and Light Company P. 0.
Box 14000 Juno Beach.
FL 33408-0420 J. Scarola, Plant. General Manager St. Lucie Nuclear Plant P. 0.
Box 128 Ft. Pierce,'FL 34954-0128 E. J: Weinkam, Plant Licensing Manager St. Lucie Nuclear Plant P. 0.
Box 128 Ft. Pierce, FL 34954-0218 N. S.
Ross, Attorney Florida Power 8 Light P. 0.
Box 14000 Juno Beach.
FL 33408-0420 John T. Butler, Esq.
Steel.
Hector and Davis 4000 Southeast Financial Center
- Niami, FL 33131-2398 cc:
Continued see page 3
FP&L cc:
Conti.nued Bi 11 Passetti Office of Radiatioy Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Joe Nyers,'irector Division of Emergency Preparedness Department of Community Affairs 2740 Center view Drive Tallahassee, FL 32399-2100
. Thomas R. L. Kindred County Administrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982 Distribution wiencl:'.
Wiens.
NRR B. Crowley. RII G. Hopper, RII PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory.Comm.
7585 South Highway AlA, Jensen
- Beach, FL 34957-2010 SIGNATURE KANE SNInh NKol land DATE 0 /
/ 97 04
/ 97 dies CCh stensen PP drI son
/ 97 04 /
/ 97
, 0
/ 97 04 /
/ 97.
COPY?
YES NO YES NO L
U L
YE NO YES
ST.
LUCIE INSPECTION PLAN INSPECTION PROCEDURE/
TEHPORARY.
INSTRUCTION TITLE/PROGRAH AREA NUH8ER OF INSPECTORS PLANNED INSPECTION DATES TYPE OF INSPECTION-COMHENTS 73753 INSERV ICE INSPECTION 4/Z8/97 CORE
-HAINTENANCE
'83750 50002 64704 OPERATIONAL HEALTH PHYSICS STEAM GENERATOR INTEGRATED INSPECTION FIRE PROTECTION 4/28/97 CORE 5/19/97 CORE - THERMOLAG IHPLEHENTATION
. 5/5/97 REGIONAL INITIATIVE 92703 FOLLOMUP A/E EXPANDED SSFI TEAN INSPECTION OPEN ISSUES 5/19/97 8(
6/16/97 REGIONAL INITIATIVE 81502 71001 50001 FITNESS FOR DUTY PREP MEEK LICENSED OPERATOR EXAHS S/G REPL PREP 6/11-13/97 FOLLOWUP FFD 6/2/97 6/16/97 LICENSEE REQUESTED 7/7/97 REGIONAL INITIATIVE 62700 TI2515/109 HAINTENANCE HOV INSPECTION 8/11/97 8/18/97 5 8/25/97 REGIONAL INITIATIVE REGIONAL INITIATIVE Enclosure
'F
INSPECTION PROCEDURE/
TEMPORARY INSTRUCTION 40500 TITLE/PROGRAM AREA EFFECTIVENESS OF LICENSEE CONTROLS IN IDENTIFYING RESOLVING. AND PREVENTING PROBLEHS; CORRECTIVE ACTION REVIEW NUMBER OF INSPECTORS PLANNED INSPECTION DATES 8/18/97 TYPE OF INSPECTION-COMMENTS CORE -
FSAR REVIEW FOLLOWUP 50001 SG HEAVY LIFT TI 2515/132
. SECURITY 2
8/28-29/97 9/8/97 VEHICLE BARRIER IMPLEMENTATION RI-REVIEW SG HEAVY LIFT PROGRAH Enclosure