ML17229A279
| ML17229A279 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/17/1997 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Plunkett T FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17229A280 | List: |
| References | |
| EA-97-107, NUDOCS 9704010256 | |
| Download: ML17229A279 (6) | |
See also: IR 05000335/1997001
Text
RECIPIENT
ID CODE/NAME
PD2-3
COPIES
LTTR ENCL
1
1
RECIPIENT
ID'ODE/NAME
WZENS,L.
COPIES
LTTR ENCL
. 1
1
L
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9704010256
DOC.DATE: 97/03/17
NOTARIZED:
NO
ACIL:50-335 St. Lucie Plant, Unit 1, .Florida Power
a Light"Co.
50-389 St. Lucie Plant, Unit 2, Florida Power
'a Light Co.
UTH.NAME
AUTHOR AFFILIATION
JULIAN,C.A.
Region
2 (Post
820201)
RECIP.NAME
RECIPIENT. AFFILIATION
PLUNKETT,T.F.
Florida Power
& Light Co.
SUBJECT:
Forwards insp rept 50-335/97-01
6 50-389/97-01
on
970105-0215
6 NOV.
DISTRIBUTION CODE:
ZEOlF
COPIES
RECEIVED!LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
DOCKET I
05000335
05000389
T
E
G
0
INTERNAL: ACRS
ENTE
NRR/DRPM/PERB
OE DIR
RGN2
FILE
01
RNAL: LITCO BRYCE,J
H
NRC
2
2
1
1
1
.
1
1
1
1
1
1
1
1
1
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3
1
1
NOAC
1
1
NUDOCS FULLTEXT
1
11-
1
3.
1
1
1
1
1
.1
1
1
1
1
1
R
2
D
0
E
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBERiOF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
March 17,. 1997
EA97-107
Florida Power
8 Light
Company'TTN:
T. F. Plunkett
President
- Nuclear Division
P. 0.
Box '14000
Juno Beach,
33408
0420
SUBJECT:
NRC
INTEGRATED INSPECTION
REPORT
NOS.
50-335/97-01,
50-389/97-'01
AND NOTICE OF VIOLATION.
Dear
Hr. Plunkett
r
On February 15,
1997, the
NRC completed
an 'inspection at your. St. Lucie 1 and
2
reactor facilities.
The enclosed report presents the results of'hat inspection.
Based
on the results of this inspection,
the
NRC has determined that violations
of NRC requirements
occurred.
One violation is cited for the failure to execute
.
an effective program for post-accident
sampling.
The violation is of concern
because it indicates that the units'ost Accident Sampling Systems
have,
over
time. suffered from a lack o'f ownership which would integrate the system's
needs
'n
a way that would ensure operability.
The types of individual deficiencies
identif'ied in - this
area
indicate
weaknesses
which
span
the
areas
of design
. control.
post-maintenance
and surveillance testing,
arid agreement
with
descriptions.
. While each of these
areas
are of concern to us,
we are particularly concerned
about failures in interdepartmental
communications
and your corrective action
program which'llowed the
Unit
2
Post
Accident
Sampling
System
to
remain'noperable
for
a period'in excess
of. two months.
This period coul'd have
been
significantly reduced
had the proper priority been placed
on the system.
These
violations
are
cited
in the
enclosed
Notice 'of Violation, -and
the
circumstances
surrounding the violations are described in detail in the enclosed
report.
Please
note that you are requi'red to respond to this .letter and should
follow the instructions specified in the enclosed. Notice when preparing your
response.
The
NRC will use your response,
in part, to determine. whether further
'enforcement
action
is
necessary
to
ensure
compliance
.with 'regulatory
requirements.
OFFICIAL COPY
9704010256
970317
ADOCK 05000335
II!IIIIIIIIIIIIIIIIIII!Il(EIIMIIII]ill!
4
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice."
a copy of this
letter and its enclosures will be placed in the
NRC Public Document
Room (PDR).
Sincerely,
Orig signed
by Caudle
A. Julian
Caudle A. Julian, Acting Chief
Reactor Projects
Branch 3
Division of Reactor Projects
1
Docket Nos.
50-335,
50-389
License Nos..
Enclosures:
1.
2.
Inspection Report
Nos. 50-335/97-01,
50-389/97-01
cc w/encls:
J.
A. Stall
Site Vice President
St. Lucie Nuclear Plant
6351 South
Ocean Drive
Ft. Pierce,
FL
34957
H.
N. Paduano,
Hanager
Licensing and Special
Programs
Florida Power and Light Company
P. 0.
Box 14000
Juno. Beach,
FL
33408-0420.,
J. Scarola
Plant General
Hanager
, St. Lucie Nuclear
Plant
6351 South
Ocean Drive
Ft. Pierce,
FL
34957
E. J.
Weinkam
Plant Licensing 'Hanager
St. Lucie Nuclear Plant
6351 South
Ocean Drive
Ft. Pierce,
FL
34957
H. S.
Ross, Attorney
Florida Power
& Light
~
11770
US Highway
1
North Palm Beach,
FL
33408
.
cc/w encls cont'd:
(See
page 3)
I
r ~. ~o
l
~(
FPSL
cc/w encls cont'd:
John T. Butler,
Esq.
Steel,
Hector
and Davis
4000 Southeast
Financial
Center
Hiami,
FL
33131-2398
Bill Passetti
Office of Radiation Control
Department of Health and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee,
FL
32399-0700
Joe Nyers, Director
Division of Emergency
Preparedness
Department of Community Affairs
2740 Centerview Drive .
Tallahassee.
FL
32399-2100
Thomas R.,L. Kindred
'
County Administrator
.
St. Lucie County
.2300 Virginia Avenue
Ft. Pierce.
FL
34982
Distribution w/encls:
K. Landis, RII
J. Norris,
NRR.
B.
R. Crowley., RII
G. Hopper, RII
PUBLIC
NRC Resident
Inspector
'.S.
Nuclear Regulatory
Comm.
7585 South Highway A1A
Jensen
Beach,
FL
34957-2010
SIGNATURE
NAHE
HHI11
C. +
earden
en
DATE
'OPY?
03 /
/ 97
YES
NO
03 / /
/ 97
YES .
HO
03 /
97
03 / / / 97
YES
HO
YES
HO
03/]I/97
03//
/97
YES
HO
YES
NO
SIGNATURE
DATE
COPY?
03 / / / 97
YES
HO
rwoskl
03 / t / / 97
YES
HO'Thonas
0
7 / 97
03 /
/ 97
'ES
HO
.
YES
NO
'03 /
/ 97
03 /
/ 97
YES
HO
.YES
NO
k