L-96-275, Forwards St Lucie Plant Status Meeting on 961017

From kanterella
(Redirected from ML17229A100)
Jump to navigation Jump to search
Forwards St Lucie Plant Status Meeting on 961017
ML17229A100
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 10/22/1996
From: Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17229A101 List:
References
L-96-275, NUDOCS 9610290287
Download: ML17229A100 (3)


Text

CATEGORY 1 REGULAT+ INFORMATION DISTRIBUTIONSTEM (RIDE)

ACCESSION NBR:9610290287 DOC.DATE: 96/10/22 NOTARIZED: NO

','FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

50-389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFILIATION STAI.L,J.A.

Florida Power S Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "St Lucie Plant Status Meeting on 961017."

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution DOCKET N

05000335 05000389 NOTES:

RECIPIENT ID CODE/NAME PD2-3 LA WIENS,L.

INTERNAL: ACRS NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-3 PD FILE CENTER 01 B

NRR/DSSA/SRXB OGC/HDS3 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

0 1

1 E

0 D

0 N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 13 ENCL 12

'y *W'g t fX 0 4

~ 'T' h.g!

t h

P 4 I

'4

i

~

Florida Power L Light Company, P.O. Box 120, Fort Pierce, FL 34954-012S October 22, 1996 L-96-275 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Manag During a November 1995 meeting with the NRC, Florida Power and Light Company (FPL) reviewed the progress made in completing activities outlined in the St. Lucie Plan to Improve Operational Performance, FPL stated that meetings to review performance would be held monthly and would include a detailed review of the plant's key performance indicators.

In the November meeting, FPL committed to provide the monthly review materials to the NRC.

Attached is a copy of the key performance indicators issued in October 1996 for St. Lucie Plant.

The indicators were discussed at the October 17, 1996, FPL management review meeting at St.

Lucie.

We look forward to NRC presence and feedback at these monthly meetings. Ifyou have any questions on this material, please contact us.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt cc:

Stewart D. Ebneter, Regional Administrator, USNRC, Region II Jon R. Johnson, Deputy Director, DRP, USNRC, Region II Ellis W. Merschoff, Director, DRP, USNRC, Region II Kerry D. Landis, Branch Chief, USNRC, Region II Leonard A, Wiens, Project Manager, USNRC, NRR Senior Resident Inspector, USNRC, St. Lucie Plant

'Pbi0290287 Vhi022 PDR,'DOCK 05000335' PDR an FPL Group company