ML17228B496
| ML17228B496 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 05/16/1996 |
| From: | Wiens L NRC (Affiliation Not Assigned) |
| To: | Hebdon F NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9605210304 | |
| Download: ML17228B496 (7) | |
Text
iy May 16, 1996 MEMORANDUM TO:
FROM:
SUBJECT:
DATE & TIME:
LOCATION:
PURPOSE:
Frederick J.
Hebdon, Director Project Directorate II-3 Division of Reactor Projects - I/II Leonard A. Wi'ens, Sr. Project Manager Project Directorate II-3, Division of Reactor Projects I/II MEETING WITH FLORIDA POWER AND'LIGHT
'OMPANY CONCERNING STEAM GENERATOR INSPECTION AND REPAIR PLANS ST.
LUCIE UNIT 1'ay 23, 1996 1:00 p.m. - 4:00 p.m.
Nuclear Regulatory Commission 11555 Rockville Pike Room 0-4-B-13 Rockville, MD 20852 To address NRC staff questions concerning the licensee*s steam generator inspection plans and repair criteria.
An agenda for the meeting is attached.
- PARTICIPANTS:
NRC B. Sheron F.
Hebdon T. Sullivan L. Wiens K. Karwoski Docket No.:
50-335
Enclosure:
Meeting Agenda DUKE POWER A. Stahl K. Craig G. Boyers E.
Weinkam
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff policy," 43 Federal Re ister 28058, 6/28/78.
DOCUMENT NAME:
G: iSTLUCIEiMNNOTICE.PSL To receive a copy of this document, indicate in the box:
"C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE PDI 1-3/LA HAME BClayton DATE 05/
/9 PD I I -3/PM LWiens 05/
/9 j PDII-3/D FHeMon 05/
/96 OFFICIAL RECORD COPY 96052i0304 96051.'6 PDR ADOCK 05000335 P
PDR RIM R(r e(mm ~v
~I il h
tI II lt ul l
4
Florida Power and Light Company St. Lucie Plant CC:
Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, Florida 32399-1400 Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission 7585 S.
Hwy AlA Jensen
- Beach, Florida 34957 Joe Hyers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 J.
R.
Newman
- Morgan, Lewis
& Bockius 1800 H Street, N.W.
Washington, DC 20036 John T. Butler, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center Hiami, Florida 33131-,2398 Hr. Thomas R.L. Kindred
'ounty Administrator St.
Lucie County 2300 Virginia Avenue Fort Pierce, Florida 34982 Hr. Charles Brinkman,'anager Washington Nuclear Operations ABB Combustion Engineering, Nuclear Power 1
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Hr. Bill Passetti Office of Radiation Control'epartment of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700, Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 H.
N. Paduano, Manager Licensing
& Special Programs Florida Power and Light Company P.O.
Box 14000 Juno
- Beach, Florida 33408-0420 W. H. Bohlke, Site Vice President St. Lucie Nuclear Plant P. 0.
Box 128 Ft. Pierce, Florida 34954-0128 J. Scarola Plant General Manager St.
Lucie Nuclear Plant P.O.
Box 128 Ft. Pierce, Florida 34954-0128 Hr. Kerry Landis U.S. Nuclear Regulatory Commission 101'Harietta Street, N.W. Suite 2900 Atlanta, Georgia 30323-0199 Hr. T.
F. Plunkett President - Nuclear Division Florida Power and Light Company P.O.
Box 14000
,Juno
- Beach, Florida 33408-0420 ij
'E. J.
Weinkam Licensing'Manager St. Lucie Nuclear Plant P.O.
Box 128
'Fort Pierce, Florida 34954-0128
d
'1 l
J p
jl; 1
1'
AGENDA STEAM GENERATOR INSPECTION AND REPAIR ST.
LUCIE UNIT I I.
Introduction II.
Inspection
- scope, results (to date),
and expansion criteria III.
Repair criteria for all forms of SG tube indications detected at St. Lucie IV.
Actions taken 'to address root cause for free span indications and circumferential cracking (cold leg, non-dented locations)
V.
Assessment of structural integrity for all forms of SG tube indications detected at St.
Lucie VI.
Criteria for mid-cycle inspection VII.
Conclusions
DISTRIBUTION
--Docket File PUBLIC St LUCIE Rdg.
R.
Zimmerman (RPZ)
S. Varga (SAV)
E. Jordan (JKR)
G. Tracy (GMT)
E. Merschoff (EWM)
B. Sheron T. Sullivan K. Karwoski
4 2
~
I' I
'I 1
I
)
11 11 I'
I
)I 1