ML17228B401

From kanterella
Jump to navigation Jump to search
Responds to Violations Noted in Insp Repts 50-335/95-17 & 50-389/95-17.Corrective Actions:Changed Date 960118, Incorrectly Recorded as 950118.Substance of Violation Response Remains Unchanged
ML17228B401
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/10/1996
From: Bohlke W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-29, NUDOCS 9602220138
Download: ML17228B401 (3)


Text

I 0

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9602220138 DOC.DATE: 96/02/10 NOTARIZED: NO DOCKET ACIL:50='33 i Bt. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BOHLKE,W.H. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to violations noted in Insp Repts 50-335/95-17 &

50-389/95-17.Corrective actions:changed date 960118, incorrectly recorded as 950118.Substance of violation response remains unchanged.

DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR TITLE: General (50 Dkt)-Insp Rept/Notice I ENCL of Violation 0 SIZE:

Response

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD NORRIS,J INTERNAL: ACRS 2 2 AEOD/DEIB 1 AEOD/SPD/RAB 1 1 1 DEDRO 1 1 RI-ZrE GENgg 1 NRR/DISP/PIPB 1 1 NRR/DRCH/HHFB 1 NRR/DRPM/PECB 1 1 NRR/DRPM/PERB 1 NUDOCS-ABSTRACT 1 OE DIR 1 OGC/HDS3 1 RGN2 FILE 01 1 1 EXTERNAL: LITCO BRYCE,J H NOAC NRC PDR NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK,

( 'OOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL

Florida Power & Light Company, P.O. Box 128, Fort Pierce, FL 34954.0128 FEB i0 1996 L-96-29 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE: St. Lucie Units 1 and 2 Docket No. 50-335 and 50-389 Res o se to Notice of Violation 50-335 389 95-17-01 ot'ce of Correction'he purpose of this letter is to correct item 4, page 6, of the subject violation response. The date of full compliance was incorrectly'ecorded as January 18, 1995. The correct date is January 18, 1996. The substance of the violation response remains unchanged.

Please submittal.

contact us if there are any questions regarding this Very truly yours, W. H. Bohlke Vice President St. Lucie Plant WHB/EJB cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC 9602220138 960210 PDR -

ADQCK 05000335 G PDR 220058 an FPL Group company