ML17228B400

From kanterella
Jump to navigation Jump to search
Summarizes 960208 Meeting in Atlanta,Ga to Discuss Status of Licensee Progress on Plan to Improve Operational Performance.List of Attendees & FPL Presentation Handouts Encl
ML17228B400
Person / Time
Site: Saint Lucie  
Issue date: 02/08/1996
From: Landis K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
References
NUDOCS 9602210373
Download: ML17228B400 (13)


Text

February 8, 1996 Florida Power and Light Company ATTN:

Mr. J.

H. Goldberg President

- Nuclear Division P: 0.

Box 14000 Juno

Beach, FL 33408-0420

SUBJECT:

MEETING

SUMMARY

PRESENTATION ON CORRECTIVE ACTION PLAN SAINT LUCIE 1

AND 2 -

DOCKET NOS. 50-335 AND 50-389

Dear Mr. Goldberg:

This refers to the meeting requested by the NRC on February 8, 1996, in Atlanta, Georgia.

The purpose of the meeting was to discuss the status of your progress on your plan to improve operational performance.

It is our opinion, that this meeting was very beneficial.

Enclosed is a list of Attendees and Florida Power and Light Company Handout.

The discussions included the following topics:

Operational Improvement Activities; Transition from the Improvement Plan to Management Indicators; Recent Challenges and Areas for Improvement.

In accordance with Section 2.790 of NRC's "Rules of Practice, "Part 2, Title 10 Code of Feder'al Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, Orig signed by Kerry D. Landis Docket Nos. 50-335, 50-389 License Nos.

DPR-67, NPF-16

Enclosures:

1.

List of Attendees 2.

FPKL Handout Kerry D. Landis, Chief Reactor Projects Branch 3

Division of Reactor Projects cc w/encls:

M. H. Bohlke, Acting Vice President St. Lucie Nuclear Plant P. 0.

Box 128 Ft. Pierce, FL 34954-0128 cc w/encls:

Continued see page 2

96022f0373 9'60208 PDR ADQCK 05000335 P

PDR OFFICIAL COPY L(L qe 05

I

FP&L cc w/encls:

Continued H. N. Paduano, Hanager Licensing and Special Programs Florida Power and Light Company P. 0.

Box 14000 Juno Beach, FL 33408-0420 J. Scarola, Plant General Hanager St. Lucie Nuclear Plant P. 0.

Box 128 Ft. Pierce, FL 34954-0128 E. Weinkam, Plant Licensing Hanager St. Lucie Nuclear Plant P. 0.

Box 128 Ft. Pierce, FL 34954-0218 J.

R.

Newman; Esq.

Horgan, Lewis E Bockius 1800 H Street, NW Washington, D. C.

20036 John T. Butler, Esq.

Steel, Hector and Davis 4000 Southeast Financial Center
Hiami, FL 33131-2398 Bill,Passetti Office of Radiation Control Dept. of Health 5 Rehab.

Serv.

1317 Winewood Boulevard Tallahassee, FL 32399-0700 Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature

-111 West Hadison Avenue, Room 812 Tallahassee, FL 32399-1400 Joe Hyers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Thomas R. L. Kindred, County Administrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982 Charles B. Brinkman Washington Nuclear Operations ABB Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 3300 Rockville, HD 20852

FP&L Distribution w encl:

J. Norris, NRR G. Hallstrom, RII PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Comm.

7585 South Highway AlA Jensen

Beach, FL 34957-2010 OFFICE SIGNATURE NAM OAT COPY?

88 o

SISS YES No o2I I ae YES NO o2 I I ae YES NO o2I I ae YES NO 02 I I ae 02 I I ae YES NO YES No OFFICIAL CORD COPY DOCUMENT NAME:

G:

SLNTG. SUN

LIST OF ATTENDEES Florida Power and Li ht Com an W. Bohlke, Vice President, St.

Lucie T. Plunkett, President

- Elect J. Scarola, Plant Hanager, St. Lucie E. Weinkam, Licensing Hanager, St. Lucie Nuclear Re ulator Commission C. Casto, Chief, Engineering Branch Division Reactor Safety (DRS)

R. Croteau, Project Hanager, Office of Nuclear Reactor Regulation A. Gibson, Director, DRS J. Johnson, Deputy Director, Division of Reactor Projects (DRP)

K. Landis, Chief,

DRP, Branch 3

T. Peebles, Chief, Operator Licensing Branch, DRS L. Reyes, Deputy Regional Administrator R. Schin, Reactor Inspector, Engineering Branch DRS

FLO A-POWER AND LIGHTCO ST. LUCIKPLANT IMPROVEMENT STA.TUS-S Y

USNRC REGION IIMEETING ATLANTA,GA FEBRUARY 8, 1996

OPERATIONALIMPROVEMENT ACTIVITIES RESOLUTION OF LONG-STANDING

- PROBLEMS ELIMINA'IZD43 OPERATOR WOIKAROUNDS IMPLI9AERIZDDAILYDARKBOARDEXPECI'ATIONFOR ANNUNCIATORS MODIFIEDCONTAINMENTSPRAY VALVES REPLACED EXCORE NUCLEARINSTRUMENTATIONSYSTEM INSTALLEDCONDENSER CLEANINGSYSTEM EQUIPMENT PERFO CE CE BACKLOGBY400 PLANTWORKORDERS REDUCED 'IHENUMBEROF ACIIVELEAKSPROM 120 TO 40 REDUCED THENUMBEROF TEMPORARY SYSTEM ALTERATIONSPROM 43 TO 15 TRAINEDENGINEERS INROOT CAUSE ANALYSIS PERSONNEL PERFO CE IMPLEMENIK>OPERATIONS SELF ERROR IDENIIPICATIONSYSTEM LOWERED TSE IN&OUSEE%9fl'HRESHOLD COMMUNICATEDANDREINFORCED REQUIREMENTS FOR PERSONAL ACCOUNTABKXIYTO OPERATORS

l

PROCEDURE IMPROVEMENT UPGRADINGOHRhTIONS PROCEDURES UPGRADING IMPLEMENTEDMORE RIGOROUS TEMPORARY SYSTEM ALTERATIONPROCESS FGURNGOIBNED 'ISB REVIEWPROCESS FOR HRST-TIMEZJKEPROCEDURES ASSESS/TREND PLANTEVENTS CREATEDh QUARTERLYSTAR'HANDREPORT IMPROVEDTHE INFORMATIONRECORDED WfQIIN THB OPERATOR LOGS IMPLEMENTEDTHE USB OP COMPVIBRIZEDLOGS SITIONFROM THE IMPROVE PLAN TO AGEMENTINDICATORS

4 I'

RECENT CHALLENGES VNH'2MANUALREACIQR'IRIP GENERATOR COLD GAS 'IZMPERATURECORIROLVALVE CORIROL ROOM OPERATOR RESPONSE LESSONS LEARNED DYNAMICPOST HELDOPEEQTOR PERESRMANCE POST TRIP DATACOLLECHONANDREVIEW UNITI BORON OVER-DILUTION h REACITVI'IYMANIPULATIONWAS INITIATEDANDLEFTUNATIZNDED SLOW RESPONSE BYPLANTSTAFF FOR RECOGNHTON OF EVENT SIGNIFICANCE BAR1UE9% REVIEWED PERSONNEL SUPERVISION ANDMANAGHMEN'I'ICIES EQUIPMENTPERFORMANCE TRAINING8t QUALXIYASSURANCE

AREAS FOR IMPROVEMENT SELF-ASSESSMENTS PROVIDINQOUTSIDE 'HUININQ CONTINUED USE OF INDUSTRYSPECIALISTS FOR ANDAUDITS BENCHMAIKINQOF INDUSTRY-BESTPERFORMANCE STANDARDS PERSONAL PERFORMANCE DEVELOPINGTREND INDICATORS EXPECTATIONS VERSUS PERFORMANCE IMPLEhKhtTINQFOCUSED OBSERVATIONS BYMANAGEMENT CON'IKMTOF PROCEDURES INCREASINGLEVELOF DETAILIN PROCEDURES IMPROVINGTIMELINESSOF PROCEDURE UPGRADES IMPLEMENT NANCERULE IDEKHFFINQANDMON1TORINQSYSTEMS IN CATEGORYAl IMPIZhKÃI'INQCORIKCTIVEACTIONTO TRANSITIONFROM CATEGORY AlTO CATEGORYA2