ML17228B387

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-335/95-22 & 50-389/95-22 on 951203-960106.No Violations or Deviations Noted
ML17228B387
Person / Time
Site: Saint Lucie  
Issue date: 02/05/1996
From: Landis K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17228B388 List:
References
NUDOCS 9602120012
Download: ML17228B387 (7)


See also: IR 05000335/1995022

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9602120012

DOC.DATE: 96/02/05

NOTAR ZED:

NO

PACIL:50-335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

50-389 St. Lucie Plant, Unit 2, Florida Power

!t Light Co.

TH.NAME

AUTHOR AFFILIATION

ANDIS,K.D.

Region

2 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

GOLDBERG,J.,

Florida Power

& Light Co.

SUBJECT:

Forwards

insp repts

50-335/95-22

a 50-389/95-22

on

951203-960106.No

violations or deviations

noted..

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

DOCKET

S.

05000335

05000389

RECIPIENT

ID CODE/NAME

PD2-1

PD

COPIES

LTTR ENCL

1

1

RECIPIENT

COPIES

ID CODE/NAME

LTTR ENCL

NORRISIJ

1

1

INTERNAL: ACRS

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

NAL: LITCO 'BRYCE,J

H

NRC

PDR

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

AEOD/DEIB

AEOD/T

P

CEhfTBR

FB

NRR/DRPM/PERB

OE DIR

RGN2

FILE

01

NOAC

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US

TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK,

ROOM OWFN SD-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM

DISTRIBUTION LISTS

FOR

DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

February 5,

1996

Florida Power

8 Light Company

ATTN:

J. Goldberg

,

President.

Nuclear Division

P. 0.

Box 14000

Juno

Beach,

Florida

33408-0420

SUBJECT:

NRC

INSPECTION

REPORT

NOS. 50-335/95-22

AND 50-389/95-22

, Gentlemen:

1

This refers to the inspection

conducted

on December

3,

1995 through January

6,

1996, at the St.

Lucie facility.

The purpose of the inspection

was to

determine

whether activities authorized

by the license

were conducted

safely

and in accordance

with NRC requirements.

At the conclusion of the inspection,

the findings were discussed

with you and those

members of your staff"

identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Within the scope of the inspection,

violations or deviations

were not cited.

~

~

In accordance

with 10

CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosure will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact us.

Sincerely,

Orig signed

by Kerry D. Landis

Kerry D. Landis, Chief

Reactor Projects

Branch

3

Division of Reactor Projects

Docket Nos.

50-335,

50-389

License

Nos.

DPR-67,

NPF-16

Enclosures:

, NRC Inspection

Report

OFFICIAL COPY

9602i200i2 960205

PDR

ADOCK 05000335

8

PDR

FP&L

cc w/encl:

D. A. Sager

Vice President

St. Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0128

H. N. Paduano,

Manager

Licensing

and Special

Programs

Florida Power

and Light,Company

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

J. Scarola

Plant General

Manager

St. Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0128

Robert

E.

Dawson

Plant Licensing Manager

St.

Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0218

J.

R.

Newman,

Esq.

Morgan,

Lewis L Bockius

1800

M Street,

NW

Washington,

D.

C.

20036

John T. Butler,

Esq.

Steel,.Hector

and Davis

4000 Southeast

Financial

Center

Miami, FL

33131-2398

Bill Passetti

Office of Radiation Control

Department of Health

and

Rehabilitative Services

1317 Winewood Boulevard

Tallahassee,

FL

32399-0700

Jack Shreve

Public Counsel

Office of the Public Counsel

c/o The Florida Legislature

ill West Madison Avenue,

Room 812

Tallahassee,

FL

32399-1400

cc w/encl:

See

page

3

I

~

~

~

FPKL

cc w//encl:

Continued

Joe Nyers, Director

Division of Emergency

Preparedness

Department of Community. Affairs

2740 Centerview Drive

Tallahassee,

FL

32399-2100

Thomas

R. L. Kindred

County Administrator

St. Lucie County

2300 Virginia Avenue

Ft. Pierce,

FL

34982

Charles

B. Brinkman

Washington Nuclear Operations

ABB Combustion

Engineering,

Inc.

12300 Twinbrook Parkway, Suite 3300

Rockville,

HD

20852

Distribution w encl:

J. Norris,

NRR

G. Hallstrom, RII

PUBLIC

NRC Resident

Inspector

U.S. Nuclear Regulatory

Comm.

7585 South Highway AlA

Jensen

Beach,

FL

34957-2010

OFFICE

SIGNATURE

NAM

ellen

ilier

RAellle

CSmlth

5iae

d3i

/

e

DA

/9

YES

NO

YES

N

COPY?

YES

NO

OFFICIAL R

RO COPY

OOCUHENT NAIIE:

G:iSL9522.OEC

AH /

/98

YES

NO

01 /

/98

01 /

/98

YES

NO

YES

NO

0

IR