ML17228B053
| ML17228B053 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 02/23/1995 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Goldberg J Florida Power & Light Co |
| Shared Package | |
| ML17228B054 | List: |
| References | |
| NUDOCS 9503080195 | |
| Download: ML17228B053 (5) | |
See also: IR 05000101/2002004
Text
PRIORIT'Y Z
REGULATORY.INA<55RAM4QE5555$fX58TION SYSTEM (RIDS)
ACCESSION NBR:9503080195
DOC.DATE: 95/02/23
NOTARIZED: NO
,
q FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTH.NAME
AUTHOR AFFILIATION
VERRELLI,D.M.
Region
2 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
GOLDBERG,J.H.
Florida Power
& Light Co.
SUBJECT:
Forwards insp repts
50-335/95-01
& 50-389/95-01
on
950101-0204
& NOV.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
DOCKET
05000335
05000389
RECIPIENT
ID CODE/NAME
PD2-2
INTERNAL: ACRS
AEOD/SPD/RAB
.BE CENTER
02
NRR/DORS/OEAB
NUDOCS-ABSTRACT
OGC/HDS3
ERNAL: LITCO BRYCE,J
H
NRC
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
NORRIS'
AEOD/DEIB
AEOD/SPD/RRAB
DEDRO
NRR/DISP/PIPB
NRR/DRCH/HHFB
OE DIR
RGN2
FILE
01
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL"RIDS" RECIPIENTS:.
PLEASE HELP US TO REDUCE 'O'ASTE! COiiTACTTHEDOCUMENTCOYTROL
DESK, ROOM PI-37 (ERAT. 504-2083 ) TO ELIMIYATEYOUR YAiMEFROiI
DISTRIBL'TIOY,LISTS FOR DOCUMEYTS YOU DON"I'L'ED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
February
23,
1995
Docket Nos.
50-335,
50-389
License
Nos.
Florida Power
& Light Company
ATTN:
J.
H. Goldberg
President
- Nuclear Division
P. 0.
Box 14000 .
Juno
Beach,
33408-0420
SUBJECT:
(NRC
INSPECTION
REPORT
NOS. 50-335/95-01
AND 50-389/95-01)
Gentlemen:
This refers to the inspection
conducted
by R. L. Prevatte of this office on
January
1 - February 4,
1995.
The inspection
included
a review of activities
authorized for your St. Lucie facility.
At the conclusion of the inspection,
the findings were discussed
with those
members of your staff identified in the
enclosed report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The purpose of the inspection
was to determine
whether activities authorized
by the licensee
were conducted safely
and in
accordance
with NRC requirements.
Based
on the results of this inspection,
certain of your activities appeared
to be in violation of NRC requirements,
as
specified in the enclosed
Notice of Violation (Notice).
You are required to respond to this letter and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should document the specific actions
taken
and any additional
actions you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the
NRC's "Rules of Practice,"
a copy of
this letter and its enclosure will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter
and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork Reduction Act of 1980,
Pub.
L. No.96-511.
OFFICIAL COPY
gVOOV4
9'503080i9S
9'S02R3
ADOCK 05000335
9
2
Should you have
any questions
concerning this letter,
please
contact us.
Sincerely,
Orig signed
by David Pl. Verrelli
David
H Verrelli, Chief
Reactor Projects
Branch
2
Division of Reactor Projects
Enclosures:
2.
NRC Inspection
Report
cc w/encls:
D. A. Sager
Vice President
St.
Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
H.
N. Paduano,
Manager
Licensing
and Special
Programs
Florida Power
and Light Company
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
C. L. Burton
Plant General
Manager
St.
Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
Robert
E.
Dawson
Plant Licensing Hanager
St.
Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0218
Harold F. Reis,
Esq.
Newman
L Holtzinger
1615
L Street,
NW
D.
C.
20036
John T. Butler,
Esq.
Steel,
Hector
and Davis
4000 Southeast
Financial
Center
Hiami,
FL
33131-2398
cc w/encls cont'd:
See
page
3
CC w/ encls cont'd:
Bill Passetti
Office of Radiation Control
Department of Health
and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee,
FL
32399-0700
Jack Shreve
Public Counsel
Office of the Public Counsel
c/o The Florida Legislature
111 West Madison Avenue,
Room 812
Tallahassee,
FL
32399-1400
Joe Myers, Director
Division of Emergency
Preparedness
Department of Community Affairs
2740 Centerview Drive
Tallahassee,
FL
32399-2100
Thomas
R. L. Kindred
County Administrator
St. Lucie County
2300 Virginia Avenue
Ft. Pierce,
FL
34982
Charles
B. Brinkman
Washington Nuclear Operations
ABB Combustion
Engineering,
Inc.
12300 Twinbrook Parkway,
Suite
3300
Rockville,
20852
)
Distribution w encls:
K. Landis, RII
J. Norris,
G. A. Hallstrom, RII
PUBLIC
NRC Resident
Inspector
U.S. Nuclear Regulatory
Comm.
7585 South
Highway AIA
Jensen
Beach,
FL
34957-2010
SEND TO PUB
C DOCUMENT R
M7
YES
NO
OFFICE
RII
SIGNATURE
NAME
Miller
DATE
02 ~LI 95
WPe crt
02 IX LI 95
Rll
RPrevett
02 /%1/ 95
Rll
RSchin
02 l~ll 95
Rll
KLendie
02 I )
95
Rll
BUryo
02
P7/ 95
SEND
NT ROOMY
TO PUBLIC DOCUME
NO
OFFICE
RII
SIGNATURE
NAME
EMerechoff
DATE
02 /
I 95
02 I
/ 95
02/
/95
02 I
I 95
02/
/95
02/
/95
OFFIC!AL RECORD
COPY
DOCUMENT NAME:
G:LSL9501.REP