ENCLOSURE 1
NOTICE OF VIOLATION Florida Power
& Light Co.
St.
Lucie Nuclear Plant Docket Nos.
50-335 and 50-389 License Nos.
DPR-67 and NPF-16 je During an NRCinspection conducted on March 21-24,
- 1994, March 28-31, 1994 and April 5-8,
- 1994, a violation of NRC requirements was identified.
In accor-dance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"
10 CFR Part 2, Appendix C, the violation is listed below:
10 CFR 50, Appendix B, Criterion V, requires, in part, that activities affecting quality shall be prescribed by instructions, procedures or drawings.......and shall be accomplished in accordance with these instructions, procedures, or drawings.
10 CFR 50, Appendix B, Criterion X, requires, in part, that a program for inspection of activities affecting quality shall be...executed...
to verify conformance with the documented instructions, procedures, and drawings for accomplishing the activity.
For repair of the pressurizer vapor space
- nozzles, paragraphs 13 and 14 of Welding Services, Inc. Work Procedure
- 3403304, Revision 2, Weld Performance, Post Weld Heat Treatment and Nozzle Installation, St Lucie Unit 2, Nozzles 8 and C,
and referenced Florida Power and Light Company Plant Change/Modification 038-294 requires that:
(1) the J-weld prepara-tion (PREP) for attaching the nozzles to the pressurizer be ground to an angle of 45'0'/-5',
and (2) the J-weld PREP be dimensionally inspected and signed off by guality Control.
Contrary to the above, on April 7, 1994, activities affecting quality were not accomplished in accordance with prescribed procedures and the program for inspection of activities affecting quality was not executed to verify conformance with documented procedures in that, the J-weld PREP bevel angles were ground to 50 - 52 degrees for nozzle "C" and 38 - 45 degrees for nozzle "B".
The PREPs were dimensionally inspected and accepted by guality Control.
This is a Severity Level IV violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, Florida Power 5 Light Co. is hereby required to submit a written statement or explanation to the U.S.
Nuclear Regulatory Commission, ATTN: Document Control
- Desk, Washington, D.C.
20555 with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).
This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results
- achieved, (3) the qg052003 K 0>000~5 2g cyg0428 PDR ADQC
@DR Q
Notice of Viol ati on corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
If an adequate reply is not received within the time specified in this Notice, an order or Oemand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be
- taken, Where good cause is shown, consideration will be given to extending the response time.
Oated at Atlanta, Georgia this 28~
day of April 1994