Forwards Insp Repts 50-335/94-08 & 50-389/94-08 on 940307-11.Violations Noted.Nrc Concerned Because Failure to Evaluate non-conforming Conditions Compromises Effectiveness of CA Program
ML17228A538
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/08/1994
From: Casto C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17228A539 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.D.1, TASK-TM NUDOCS 9404200053
Download: ML17228A538 (6)


See also: IR 05000335/1994008

Text

e

(

ACCESSION NBR:

FACIL:50-335

~

~

~

~

50-389

AUTH.NAME

CASTO,C.A.

RECIP.NAME

GOLDBERGiJ.H.

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

9404200053

DOC.DATE: 94/04/08

NOTARIZED:

NO

St. Lucie Plant, Unit 1, Florida Power

& Light Co.

St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTHOR AFFILIATION

Region

2 (Post

820201)

RECIPIENT AFFILIATION

Florida Power

& Light Co.

DOCKET

05000335

05000389

R

SUBJECT:

Forwards

insp repts

50-335/94-08

& 50-389/94-08

on

940307-11.Violations

noted.NRC

concerned

because

failure

to evaluate

non-conforming conditions

compromises

effectiveness

of CA program.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

-RECIPIENT

ID CODE/NAME

PD2-2

PD

COPIES

LTTR ENCL

1

1

RECIPIENT

ID CODE/NAME

NORRISgJ

COPIES

LTTR ENCL

1

1

e

EXTERNAL

EG&G/BRYCEiJ

~ H ~

NSIC

INTERNAL: ACRS

AEOD/DSP/ROAB

AEOD/TTC

NRR/DORS/OEAB

NRR/DRIL/RPEB

NRR/PMAS/ILPB1

NUDOCS-ABSTRACT

OGC/HDS3

RES/HFB

<<

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

AEOD/DEIB

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFB

NRR/DRSS/PEPB

~NRR/PMAS/ILPB

OE

D

~R

FT'M

RGN2

NRC

PDR

1

1

1

1

1

1

1

1

1

1

2

1

1

1

1

02

1

1

01

'1

1

1

1

D

- 0

NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOhI P I-37 (EXT. 504-2065) TO ELIMINATEYOUR NAh'IE FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

24

ENCL

24

Docket Nos.

50-335,

50-389

License

Nos.

DPR-67,

NPF-16

Florida Power

and Light Company

ATTN:

Nr. J.

H. Goldberg

President

- Nuclear

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC

INSPECTION

REPORT

NOS. 50-335/94-08

AND 50-389/94-08)

This refers to the inspection

conducted

by B. Crowley and J.

Lenahan of this

office on Narch 7-11,

1994.

The inspection

included

a review of activities

authorized for your St.

Lucie facility.

At the conclusion of the inspection,

the findings were discussed

with those

members of your staff identified in the

enclosed report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Based

on the results of this inspection,

certain of your activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

Violation A is of concern

because

failure to evaluate

non-conforming conditions

compromises

tPe effectiveness

of your corrective

action program.

Violation B is of concern

because

failure to identify five

inoperable

snubbers

on the pressurizer

power operated relief valve

and safety

relief valve discharge

piping after the November 24,

1992,

waterhammer

event

compromised

the structural integrity of this piping.

Failure of this piping

could

hav'e prevented

the valves

from performing their intended safety

functions.

The Nuclear Regulatory

Commission specifically addressed

the

importance of this piping under TNI Action -

NUREG 0737 item II.D.l.

You are required to respond to this letter and should follow the instructions

specified in the- enclosed

Notice when preparing your response.

In your

response,

you should document the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

9404200053

940408

PDR

ADOCK 05000335

Q

PDR

0

APR

8

f9'lorida

Power

5 Light Co.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

2

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter, its enclosures

and

any reply will be placed in the

NRC Public

Document

Room.

If you wish to withhold information contained therein,

please

notify this office by telephone within ten days of the date of this letter and

promptly thereafter

submit

a written application to withhold information

contained therein.

Such application must

be consistent with the requirement

of 10 CFR 2.790(b)(1).

If we do not hear from you in this regard within the

period specified

above, this letter, its enclosures

and

any reply will be

placed in the

NRC Public Document

Room.

The responses

directed

by this letter

and the enclosed

Notices are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

Pub L.96-511.

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

cc w/encls:

D. A. Sager

Vice President

St.

Lucie Nuclear Plant

P. 0.

Box 128

Ft, Pierce,

FL

34954-0128

Charles

A. Casto,

Acting Chief

Engineering

Branch

Division of Reactor

Safety

H.

N. Paduano,

Manager

Licensing

and Special

Projects

Florida Power

and Light Company

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

C. L. Burton

Plant General

Manager

St. Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0128

(cc w/encls cont'd

- See

page 3)

Florida Power

& Light Co.

(cc w/encls cont'd)

Harold F. Reis,

Esq.

Newman

8, Holtzinger

1615

L Street,

NW

Wasliington,

D.

C.

20036

John T. Butler,

Esq.

Steel,

Hector and Davis

400 Southeast

Financial

Center

Miami,

FL

33131-2398

Bill Passetti

Office of Radiation Control

Department of Health

and

Rehabilitative Services

13,17 Winewood Boulevard

Tallahassee,

FL

32399-0700

Jack Shreve

Public Counsel

Office of the Public Counsel

c/o The Florida. Legislature.

111 West Madison Avenue,

Room 812

Tallahassee,

FL

32399-1400

Joe Myers, Director

Division of Emergency

Preparedness

Department of Community Affairs

2740 Centerview Drive

Tallahassee,

FL

32399-2100

Thomas

R. L. Kindred

County Administrator

St.

Lucie County

2300 Virginia Avenue

Ft. Pierce,

FL

34982

Charles

B. Brinkman

Washington Nuclear Operations

ABB Combustion

Engineering,

Inc.

12300 Twinbrook Parkway,

Suite

3300

Rockville,

MD

20852

(bcc w/encls

- See

page

4)

ll

Florida Power

8 Light Co.

bcc w/encls:

K. Landis, RII

J

~ Norris,

NRR

Document Control

Desk

NRC Resident

Inspector

U.S. Nuclear Regulatory

Comm.

7585 South

Highway A1A

Jensen

Beach,

FL

34957-2010

p

~

3

toe)'ILE

NAME:

RI I:DRS

Q BCrowley

04/ a /94

S:))DRSQEB))STL9408L.JL

RI I:DRS

JLenahan

04/ 7 /94

RII:DRS

JBl

e

04/$ /94

RI I: DRP

KL ndis

04/f /94