ACCESSION NBR:
FACIL:50-335
~
~
~
~
50-389
AUTH.NAME
CASTO,C.A.
RECIP.NAME
GOLDBERGiJ.H.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
9404200053
DOC.DATE: 94/04/08
NOTARIZED:
NO
St. Lucie Plant, Unit 1, Florida Power
& Light Co.
St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTHOR AFFILIATION
Region
2 (Post
820201)
RECIPIENT AFFILIATION
Florida Power
& Light Co.
DOCKET
05000335
05000389
R
SUBJECT:
Forwards
insp repts
50-335/94-08
& 50-389/94-08
on
940307-11.Violations
noted.NRC
concerned
because
failure
to evaluate
non-conforming conditions
compromises
effectiveness
of CA program.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
-RECIPIENT
ID CODE/NAME
PD2-2
COPIES
LTTR ENCL
1
1
RECIPIENT
ID CODE/NAME
NORRISgJ
COPIES
LTTR ENCL
1
1
e
EXTERNAL
EG&G/BRYCEiJ
~ H ~
INTERNAL: ACRS
AEOD/DSP/ROAB
AEOD/TTC
NRR/DORS/OEAB
NRR/DRIL/RPEB
NRR/PMAS/ILPB1
NUDOCS-ABSTRACT
OGC/HDS3
RES/HFB
<<
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
AEOD/DEIB
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFB
NRR/DRSS/PEPB
~NRR/PMAS/ILPB
D
~R
FT'M
RGN2
NRC
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
02
1
1
01
'1
1
1
1
D
- 0
NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOhI P I-37 (EXT. 504-2065) TO ELIMINATEYOUR NAh'IE FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
Docket Nos.
50-335,
50-389
License
Nos.
Florida Power
and Light Company
ATTN:
Nr. J.
H. Goldberg
President
- Nuclear
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
(NRC
INSPECTION
REPORT
NOS. 50-335/94-08
AND 50-389/94-08)
This refers to the inspection
conducted
by B. Crowley and J.
Lenahan of this
office on Narch 7-11,
1994.
The inspection
included
a review of activities
authorized for your St.
Lucie facility.
At the conclusion of the inspection,
the findings were discussed
with those
members of your staff identified in the
enclosed report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
Based
on the results of this inspection,
certain of your activities appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
Violation A is of concern
because
failure to evaluate
non-conforming conditions
compromises
tPe effectiveness
of your corrective
action program.
Violation B is of concern
because
failure to identify five
on the pressurizer
power operated relief valve
and safety
relief valve discharge
piping after the November 24,
1992,
waterhammer
event
compromised
the structural integrity of this piping.
Failure of this piping
could
hav'e prevented
the valves
from performing their intended safety
functions.
The Nuclear Regulatory
Commission specifically addressed
the
importance of this piping under TNI Action -
NUREG 0737 item II.D.l.
You are required to respond to this letter and should follow the instructions
specified in the- enclosed
Notice when preparing your response.
In your
response,
you should document the specific actions
taken
and
any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
9404200053
940408
ADOCK 05000335
Q
0
APR
8
f9'lorida
Power
5 Light Co.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
2
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter, its enclosures
and
any reply will be placed in the
NRC Public
Document
Room.
If you wish to withhold information contained therein,
please
notify this office by telephone within ten days of the date of this letter and
promptly thereafter
submit
a written application to withhold information
contained therein.
Such application must
be consistent with the requirement
If we do not hear from you in this regard within the
period specified
above, this letter, its enclosures
and
any reply will be
placed in the
NRC Public Document
Room.
The responses
directed
by this letter
and the enclosed
Notices are not subject
to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork
Reduction Act of 1980,
Pub L.96-511.
Enclosures:
1.
2.
NRC Inspection
Report
cc w/encls:
D. A. Sager
Vice President
St.
Lucie Nuclear Plant
P. 0.
Box 128
Ft, Pierce,
FL
34954-0128
Charles
A. Casto,
Acting Chief
Engineering
Branch
Division of Reactor
Safety
H.
N. Paduano,
Manager
Licensing
and Special
Projects
Florida Power
and Light Company
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
C. L. Burton
Plant General
Manager
St. Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
(cc w/encls cont'd
- See
page 3)
Florida Power
& Light Co.
(cc w/encls cont'd)
Harold F. Reis,
Esq.
Newman
8, Holtzinger
1615
L Street,
NW
Wasliington,
D.
C.
20036
John T. Butler,
Esq.
Steel,
Hector and Davis
400 Southeast
Financial
Center
Miami,
FL
33131-2398
Bill Passetti
Office of Radiation Control
Department of Health
and
Rehabilitative Services
13,17 Winewood Boulevard
Tallahassee,
FL
32399-0700
Jack Shreve
Public Counsel
Office of the Public Counsel
c/o The Florida. Legislature.
111 West Madison Avenue,
Room 812
Tallahassee,
FL
32399-1400
Joe Myers, Director
Division of Emergency
Preparedness
Department of Community Affairs
2740 Centerview Drive
Tallahassee,
FL
32399-2100
Thomas
R. L. Kindred
County Administrator
St.
Lucie County
2300 Virginia Avenue
Ft. Pierce,
FL
34982
Charles
B. Brinkman
Washington Nuclear Operations
ABB Combustion
Engineering,
Inc.
12300 Twinbrook Parkway,
Suite
3300
Rockville,
20852
(bcc w/encls
- See
page
4)
ll
Florida Power
8 Light Co.
bcc w/encls:
K. Landis, RII
J
~ Norris,
Document Control
Desk
NRC Resident
Inspector
U.S. Nuclear Regulatory
Comm.
7585 South
Highway A1A
Jensen
Beach,
FL
34957-2010
p
~
3
toe)'ILE
NAME:
RI I:DRS
Q BCrowley
04/ a /94
S:))DRSQEB))STL9408L.JL
RI I:DRS
JLenahan
04/ 7 /94
RII:DRS
JBl
e
04/$ /94
RI I: DRP
KL ndis
04/f /94