Forwards SE Approving Request for Approval of Improved Methodology, Extended Statistical Combination of Uncertainties, for Applications Described in Rept CEN-371(F)-P Dtd Jul 1989
ML17228A489
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/14/1994
From: Norris J
Office of Nuclear Reactor Regulation
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17228A491 List:
References
TAC-M87722, NUDOCS 9403180108
Download: ML17228A489 (4)


Text

Docket No. 50-389 Mr. J.

H. Goldberg President - Nuclear Division Florida Power and Light Company'ost Office Box '14000 Juno

Beach, Florida 33408-0420

Dear Mr. Goldberg:

March 14, 1994

SUBJECT:

ST.

LUCIE UNIT 2 CHANGE TO TECHNICAL SPECIFICATION BASES SECTIONS "2. 1. 1 REACTOR CORE" AND,!'3/4'.2.5 DNB PARAMETERS" (TAC NO. M87722)

I o

By letter dated August 27, 1993, Florida Power 3 Light Comp'any (FPL) requested approval of an improved m'ethodology, "Extended Statistical Combination of Uncertainties (ESCU)," for applications described in the report CEN-371(F)-P dated July 1989.

The report. describes the application of ESCU to the calculation of aggregate analytical uncertainties associated with Departure from Nucleate Boiling, related analog protection and monitoring system setpoints for St.

Lucie Unit 2.

I The staff has reviewed the above request and finds the ESCU methodology acceptable for application to St. Lucie Unit 2 when Combustion Engineering 16x16 fuel assemblies are utilized.

The enclosed Safety Evaluation contains details of the staff's review.

Enclosed also are new pages B 2-1, B 2-4, and B 3/4 2-2 and their overleafs.

Sincerely,

Enclosures:

Safety Evaluation and Bases Pages w/overleafs cc w/enclosure:

See next page Distribution Docket File NRC 8 Local PDRs PDII-2 RF S.

Varga G, Lainas H. Berkow J. Norris E.

Tana OGC ACRS (10)

M. Sinkule RII (Original Signed By)

Jan A. Norris, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation OFC NAME LA:PDI I-2 ETana P.:P, I

(

)Norr's D:PDI -2 HB r DATE 9/ ///94 4/ /+/94

~/z '/94 gHPMIt;BIIRCP OFFICIAL RECORD COPY - FILENAME

/

Ross'solos v4os<4 P PDR ADOCK 05000389 P

PDR t

S:i87722.JAN

I t

'I

~

~t ll j,

il ll IIv t

l l

~ i

Hr. J.

H. Goldberg Florida Power and Light Company CC:

Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, Florida 32399-1400 1

Senior Resident Inspector St.

Lucie Plant U.S. Nuclear Regulatory Commission 7585 S.

Hwy A1A Jensen

Beach, Florida 34957 Hr. Joe Hyers, Director Div. of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Harold F. Reis, Esq.

Newman 5 Holtzinger 1615 L Street, N.W.

Washington, DC 20036 John T. Butler, Esq.

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Hr. Thomas R.L. Kindred County Administrator St.

Lucie County 2300 Virginia Avenue Fort Pierce, Florida 34982 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering, Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 St. Lucie Plant Mr. Bill Passetti Office of Radiation Control Department of'Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Regional Administrator, RII U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Hr. H. N. Paduano, Manager Licensing 3 Special Projects Florida Power and Light Company P.O.

Box 14000 Juno

Beach, Florida 33408-0420 D. A. Sager, Vice President St.

Lucie Nuclear Plant P.O.

Box 128 Ft. Pierce, Florida 34954-0128 C. L. Burton Plant General Manager St. Lucie Nuclear Plant P.O.

Box 128 Ft. Pierce, Florida 34954-0128

~

P I