ML17227A594
| ML17227A594 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 09/09/1992 |
| From: | Sinkule M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Goldberg J FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17227A595 | List: |
| References | |
| NUDOCS 9209220015 | |
| Download: ML17227A594 (5) | |
See also: IR 05000335/1992016
Text
EP 09 1992
Docket Nos.
50-335,
50-389
License
Nos.
Florida Power
& Light Company
ATTN:
J.
H. Goldberg
President
- Nuclear Division
P. 0.
Box 14000
Juno
Beach,
33408-0420
Gentlemen:
SUBJECT:
NRC
INSPECTION
REPORT
NOS. 50-335/92-16
AND 50-389/92-16
This refers to the inspection
conducted
by S. A. Elrod of this office on
July 14 - August 10,
1992.
The inspection
included
a review of activities
authorized for your St. Lucie facility.
At the conclusion of the inspection,
the findings were discussed
with those
members of your staff. identified in the
enclosed report.
~
~
~
~
~
~
~
~
~
~
~
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
'nd representative
records,
int'erviews with personnel,
and observation of
activities in progress.
The enclosed
Inspection
Report identifies activities that violated
NRC
requirements
that will not be subject to enforcement
action
because
the
licensee's
efforts in identifying and/or correcting the violation meet the
criteria specified in Section VII.B of the Enforcement Policy.
In accordance
with 10
CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosure(s) will be placed in th0
NRC Public Document
Room.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
Original signed
by
Paul
E. Fredrickson (for)
Enclosure:
NRC Inspection
Report
cc w/encl:
See
page
2
9209220015
920909
ADOCH, 05000335
8
Harvin V.. Sinkule, Chief
Reactor Projects
Branch
2
Division of Reactor Projects
+go
(
0
Florida Power
8 Light Company
cc w/encl:
D. A. Sager
Site Vice President
St. Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
R;
E. Grazio, Director
Nuclear Licensing
Florida Power
and Light Company
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
G. J.
Boissy
Plant General
Manager
St.
Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
Harold F. Reis,
Esq.
Newman
5, Holtzinger
1615
L Street,
NW
D.
C.
20036
John T. Butler,
Esq.
Steel,
Hector and Davis
400 Southeast
Financial
Center
Ni ami,
FL
33131-2398
Jacob, Daniel
Nash
Office of Radiation Control
Department of Health
and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee,
FL
32399-0700
'dministrator
Department of Environmental
Regulation
Power Plant Siting Section
State of Florida
2600 Blair Stone
Road
Tallahassee,
FL
32301
Jack Shreve
Public Counsel-
Office of the Public Counsel
c/o The Florida Legislature
ill West Hadison
Avenue,
Room 812
Tallahassee,
FL
32399-1400
cc w/encl cont'd:
See
page
3
SEP 09 1S92
Fl orida Power
5, Light Company
'cc w/encl cont'd:
Robert
G. Nave, Director
Emergency
Management
Department of Community Affairs
2740 Centerview Drive
Tallahassee,
FL
32399-2100
James
V. Chisholm
County Administrator
St. Lucie County
2300 Virginia Avenue
Fort Pierce,
FL
34982
Charles
B. Brinkman
Washington Nuclear Operations
ABB Combustion
Engineering,
Inc.
12300 Twinbrook Parkway, Suite 330
Rockville,
HD
20852
bcc w/encls:
K. Landis, RII
J. Norris,
Document Control
Desk
NRC Resident
Inspector
U.S. Nuclear Regulatory
Commission
7585 South Highway A1A
Jensen'each,
FL
33457
SEP 09892
RI I:DRP
09/g
2
RI I
P
KL
nd'9/g/92