~pa% 'Iig "o
+
9~
Cy
)l 0
Vl Q
0'+*++
UNITED STATES NUCLEAR R EG ULATORYCOMMISSlON WASHINGTON, O.C. 20666 June 2,
1992 Docket No. 50-389 Mr. J.
H. Goldberg President - Nuclear Division Florida Power and Light Company P.O.
Box 14000 Juno
- Beach, Florida 33402-0420
Dear Mr. Goldberg:
SUBJECT:
ST.
LUCIE UNIT 2 INTERIM RELIEF FOR CHECK VALVE V-3103 (TAC NO. M83428)
By letter dated May 27,
- 1992, you requested a one-time relief for the 1992 refueling outage.
Specifically, you requested relief from the guidelines of Generic Letter 89-04, "Guidance on Developing Acceptable Inservice Testing Programs,"
Position 2, relative to the disassembly and inspection schedule for check valve V-3103.
The Inservice Testing Program includes a disassembly and inspection of high pressure safety inj ction pump minimum flow recirculat;ion line check valves V-3102 and V-3103.
Valve V-3102 was disassembled and inspected during the 1990 refueling outage with satisfactory results.
However, the effort resulted in concern with potential galling of the valve threads.
Replacement valves were ordered such that if disassembly and inspection damages the threads, a
delay in startup from the refueling outage would be precluded by installation of a new valve.
Because you have not yet received the replacement
- valves, a one-time deferral of the disassembly and inspection of valve V-3103 from the 1992 refueling outage to the fall 1993 refueling outage is requested.
This interim relief applies to valve V-3103 only.
Your submittal states that valve V-3102, which was inspected during the 1990 outage, will be tested again during the 1995 outage.
However, since this relief only affects the inspection schedule for valve V-3103, valve V-3102 needs to be inspected during the 1993 outage, in accordance with the original schedule.
We have reviewed and evaluated your relief request and determined that relief may be granted in accordance with 10 CFR 50.55a(a)(3)(ii),
based on the resulting hardship without a compensating increase in the level of quality and safety which would result if the requirements were immediately imposed.
During the interim period, you should procure replacement valves or parts, in case valve damage occurs during future disassembly and inspection activities.
Additionally, the evaluation of the use of non-intrusive techniques should be continued, possibly providing a method to test these valves in lieu of disassembly and inspection.
The results of the review are provided in the enclosed Safety Evaluation.
920b 1 10134,920b02 PDR ADOCK 05000389 PDR
\\ (
')
r 4
Mr. J.
H. Goldberg June 2, 1992 This completes our action with regard this issue
- and, consequently, we are closing TAC No.
M83428.
Sincerely,
Enclosure:
Safety Evaluation cc w/enclosure:
See next page DISTRIBUTION
'ocket File--
NRC E Local PDRS P022 Rdg TMurley/FMiraglia JPartlow CRossi JLieberman SVarga GLainas HBerkow DMiller JNorris OGC EJordan GHill(4)
ACRS (10)
OPA OC/LFMB JWechselberger, 17G21 MSinkule, RII PM:PD 2
D:PD22 Herbert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation EMEB rris HBerko TSullivan J
rber 92 4
92 4/S 92 5 /g /92
$/g /92 OFFICIAL RECORD COPY FILENAME:
STLUCIE. REL
, Mr. J.
H. Goldberg Florida Power and Light Company St.
Luc>e Plant CC:
Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, Florida 32399-1400 Senior Resident Inspector St.
Lucie Plant U.S. Nuclear Regulatory Commission 7585 S.
Hwy AIA Jensen
- Beach, Florida 33457 Mr. Rober t G. Nave, Director Emergency Management Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Harold F. Reis, Esq.
Newman 8 Holtzinger 1615 L Street, N.W.
Washington, DC 20036 John T. Butler, Esq.
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 34982 Mr. James V. Chisolm, County Administrator St.
Lucie County 2300 Virginia Avenue Fort Pierce, Florida 34982 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering, Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 Regional Administrator, RII U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Mr. R.
E. Grazio Director, Nuclear Licensing Florida Power and Light Company P.O.
Box 14000 Juno
- Beach, Florida 33408-0420