Forwards Insp Repts 50-335/92-01 & 50-389/92-01 on 920210-14.No Violations or Deviations Noted
ML17227A381
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/24/1992
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Goldberg J
Florida Power & Light Co
Shared Package
ML17227A382 List:
References
NUDOCS 9204150223
Download: ML17227A381 (4)


See also: IR 05000335/1992001

Text

LIAR2<

199'ocket

Nos. '50-335,

50-389

License

Nos.

DPR-67,

NPF-16

Florida Power and Light Company

ATTN:

Nr. J.

H. Goldberg

President

- Nuclear

P.

0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NOS. 50-335/92-01

AND 50-389/92-01

This refers

to the inspection

conducted

by F.

N. Wright of this office on

February

10-14,

1992.

The

inspection

included

a

review of activities

authorized for your St. Lucie facility.

At the conclusion of the inspection,

the findings were discussed

with those

members of your staff identified in the

report.

Areas, examined

during the inspection

are identified in the report'.

Within

'these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of

activities in progress.

Within the

scope

of the

inspection,

no violations

or deviations

were

identified.

In accordance

with 10 CFR 2.790(a),

a copy of this letter

and its enclosure

will be placed in the

NRC Public Document

Room..

Should you have any questions

concerning this letter, please

contact us.

Sincerely,

ni.lrli'

Jy'. g~~~ g, i

/

Enclosure:

NRC Inspection

Report

cc w/encl:

(See

page

2)

I

S'204150223

920324

PDR

ADOCK 05000335

8

PDR

William E. Cline, Chief

Radiological Protection

and

Emergency

Preparedness

Branch

Division of Radiation Safety

and Safeguards

Florida Power and Light Company

cc w/encl:

D. A. Sager

Site Vice President

St. Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0128

R.

E. Grazio, Director

Nuclear Licensing

Florida Power

and Light Co.

P. 0.

Box 14000

Juno Beach,

FL

33408-0420

G. J.

Boissy

Plant General

Manager

St. Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0128

Harold F. Reis,

Esq.

Newman

8 Holtzinger

1615

L Street,

NW

Washington,

D.

C.

20036

John T. Butler, Esq.

Steel,

Hector and Davis

400 Southeast

Financial

Center

Miami,

FL

33131-2398

Jacob

Daniel

Nash

Office of Radiation Control

Department of Health and

Rehabilitative

Services

1317 Winewood Boulevard

Tallahassee,

FL

32399-0700

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

2600 Blair Stone

Road

Tallahassee,

FL

32301

cc w/encl:

(Cont'd

on page

3)

'

Florida Power and Light'Company

cc w/encl:

(Cont'd)

Jack

Shreve

Public Counsel

Office of the Public Counsel

c/o The Florida Legislature

111 West t/jadision Ave.,

Room 812

Tallahassee,

FL

32399-1400

Robert

G. Have, Director

Emergency

Yianagement

Department of ComImunity Affairs

2740 Centerview Drive,

Tallahassee,

FL

32399-2100

James

V. Chisholm

County Administrator

St. Lucie County.

2300 Virginia Avenue,.

Fort Pierce,

FL

34982

Charles

B. Brinkman

Washington

Huclear Operations

ABB Combustion Engineering,

Inc.

12300 Twinbrook Parkway, Suite

330

Rockville,

t/lD

20852

State of Florida

bcc w/encl:

J.

Johnson,

RII

K. Landis, RII

J. Norris',

NRR

Document Control

Desk

NRC Resident

Inspector

U.S. Nuclear Regulatory

Commission

7585 South Highway AlA

Jensen

Beach,

FL

33457

RI:

SS

R

R

RII

DRP

~

~

FWright

Rankin

KLandis

/ /92 Q ~92

5/I5/92