Text
'December
27,
1991
Docket Nos.
50-335,
.50-389
License
Nos.
Florida Power and Light Company
ATTN:
Mr. J.
H. Goldberg
President,-
Nuclear
P.
0.
Box 14000
Juno Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT
NOS. 50"335/91-25
AND 50"389/91-25
This refers
to the
inspection
conducted
by M..Glasman
of this office on
November 15-22,
1991.
The
inspection
included
a
review of activities
authorized for your St.
Lucie facility.
At the conclusion of the inspection,
the findings were discussed
with those
members of your staff identified in the
report.
Areas
examined
during the inspection
are identified in the report.
within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
Mjthin the
scope
of the
inspection,
violations or deviations
were
not
identified.
In accordance
with 10 CFR 2.790 of the
NRC's "Rules of Practice,"
a copy of
this letter and its enclosure will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter, please
contact
us.
Sincerely,
Original signed
by
Caudle
A. Julian
Enclosure:
NRC Inspection
Report
cc w/encl:
(See
page 2)
Caudle
A. Julian, Chief
Engineering
Branch
Division of Reactor Safety
9201l70l05 9il227
ADOCK 05000335
O
Florida Power and Light Company
cc w/encl:
D.
A. Sagei,
Vice President
St..Lucie Nuclear Plant
P.
0.
Box
128't.
Pierce,
FL,34954-0128
R.
E. Grazio,
Director'uclear
Licensing
,Florida Power and Light Co.
" P.
0.
Box 14000
Juno Beach,
FL
33408-0420
G. J. Boissy, Plant Manager
St.
Lucie Nuclear Plant
P.
0.
Box 128
Ft. Pierce,
FL
34954-0128
December
27,
1991
~
Harold F. Reis,
Esq.
- Newman
8 Holtzinger
1615
L Street,
NM
Mashington,
D.
C.
20036
John .T. Butler,
Esq.
Steel,
Hector and Davis
400 Southeast
Financial
Center
Miami, FL
33131-2398
Jacob Daniel
Nash
Office of Radiation Control
Department of Health and
=Rehabilitative Services
1317 Minewood Boulevard
Tallahassee,
FL
32399-0700
Administrator
Department of Environmental
Regulation
Power Plant Siting Section
State of Florida
2600 Blair Stone
Road
Tallahassee,
FL
32301
Jack Shreve
Public Counsel
Office of. the Public Counsel
'c/o The Florida Legislature
111.Mest Madision Ave.,
Room 812
Tallahassee,
FL
32399-1400
(cc w/encl cont'd - see
page 3)
Florida Power and Light'Company
December
27,
1991
(cc w/encl cont'd)
Gordon Guthrie, Director
Emergency
Management
Department of Community Affairs
2740 Centerview Drive .
Tallahassee,FL
32399-2100
James
V. Chisholm
County Administrator
St.
Lucie County
2300 Yirginia Avenue,
Fort Pierce,
FL
34982
'
Charles
BE Brinkman
= Mashington Nuclear Operations
ABB 'Combustion Engineering,
Inc.
,12300 Twinbrook Parkway, Suite
330
Rockville,
20852
State of Florida
bcc w/encl:
Document Control
Desk
K. Landis, RII
J. Norris,
NRC Resident Inspector
U.S. Nuclear Regulatory
Commission
7585 South Highway AlA
Jensen
Beach,
FL
33457
RI
S
MG asman:er
Z2/m/9Z
S
ke
/4'//91