October 18, 199
~
Docket No. 50-389 t1r. J.
H. Goldberg President - Nuclear Division Florida Power and Light Company P.O.
Box 14000 Juno Beach, Florida 33408-0420
Dear ter. Goldberg:
DISTRIBUTION NRC 8 Local PDRS PD2P Rdg SVarga GLainas DMiller JNorris OGC ACRS (10)
H. S inkule, RII
SUBJECT:
ST.
LUCIE UNIT 2 - FUEL PIN BURNUP TO 60 HMD/KG (TAC NO.llI75947)
By letter dated January 25, 1990, the Florida Power Im Light Company (FPL) requested NRC review and approval to raise the fuel pin burnup limit for Combustion Engineering (CE) 16 x 16 fuel from 52 N>ld/kg to 60 Mild/kg.
To support this request, FPL submitted CE report CEN-396-P, "Verification of the Acceptability of a Pin Burnup Limit of 60 tllld/kg for St. Lucie Unit 2."
The staff, with assistance of its contractor, the Pacific Northwest Laboratory (PNL), has reviewed your request.
Based on its review of the Technical Evaluation Report prepared by PNL (enclosed),
the staff concludes that the increased fuel pin burnup limit methodology described in CEN-396-P is acceptable for licensing applications.
This concludes our review of this request
- and, accordingly, we are closing TAC No. 75947.
Sincerely,
Enclosure:
Technical Evaluation Report cc w/enclosure:
See next page Jan A. Norris, Sr. Project Manager Pro,iect Directorate 11-2 Division of Reactor Proiects - I/II Office of Nuclear Reactor Regulation
.2 1 1er I y /g/91 P:,2 D
J(o r's:mhk H r w
o lg 91 P /5/91 0a9e 9>zo>S PDR ADOCK 05000389 p
PDR IIIIEC II'IIILKCREE IIlIIP