Notification of Significant Enforcement Conference on 890905 in Region II Ofc W/Util to Discuss Inoperable Emergency Diesel Generator 1B Fuel Transfer Sys & Containment Cooler Access Doors Improperly Sealed Per Mode of Operation
ML17223A303
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/23/1989
From: Crlenjak R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8909070285
Download: ML17223A303 (3)


Text

AUG 2 S lS89 NOTICE OF SIGNIFICANT MEETING Name of Licensee:

Florida Power and Light Name of Facility:

St. Lucie Nuclear Plant Docket Nos.:

50-335 and 50-389 Date and Time of Meeting:

September 5, 1989, at 10:00 a.m.

Location of Meeting:

Region II Office, 26th Floor Conference Room Purpose of Meeting:

Enforcement Conference to discuss

1) inoperable EDG 18 fu'el transfer system;
2) temporary filter media installed on containment cooler during power operations; and
3) containment cooler access doors not properly sealed as required by the mode of operation.

NRC Attendees:

S.

D. Ebneter, Regional Administrator, RII L. A. Reyes, Director, Division of Reactor Projects (DRP)

A. F. Gibson, Director, Division of Reactor Safety (DRS)

G.

R. Jenkins, Director, Enforcement and Investigation Coordination Staff M. V. Sinkule, Chief, Reactor Projects Branch 2, DRP R. V. Crlenjak, Chief, Reactor Projects Section 2B, DRP S. J. Vias, Project Engineer, DRP P.

M. Madden, Project Engineer, DRP Licensee Attendees:

D. A. Sager, Vice President G. J. Boissy, Plant Manager D. A. Chancy, Director, Licensing C. L. Burton, Operation Supervisor T. S. Vogan, Engine'ering Project Manager R.

E. Dawson, Maintenance Superintendent D. H. West, Technical Supervisor NOTE:

Attendance by NRC personnel at this NRC/Licensee meeting should be made known by 2:00 p.m., August 30, 1989, via telephone call to S. J. Vias, FTS: 841-5350.

Distribution:

(See page 2)

Orig-nal signed by Approved by:

Marvin V. Sinkule for Rsc ard V.

r enga hsef Reactor Projects Section 28 Division of Reactor Projects S9090702S5 S90S23 PDR ADOCK 05000335 9

PDC

1

Notice of Significant Meeting AUG 23

$S89 Distribution:

J.

M. Taylor, Acting EDO J.

H. Sniezek, Deputy Director, NRR G.

C. Lainas, Assistant Director for Region II Reactors, NRR R.

W.

Bor chardt, Regional Coordinator, EDO J. Norris, Licensing Project Manager, NRR bcc:

NRC Resident Inspector NRC Section Chief NRC Project Engineer Document Control Desk RII: R9 RII'DRf SV as RCrlenjak 08/gy/89 08/~89 RII:D RI:D P RI

R MSinku e LReyes GJenk ns 6

'mes 08/g+89 08/ys/89 08/3/89 08+g/89