ML17222A729
| ML17222A729 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/03/1989 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML17222A728 | List: |
| References | |
| 50-335-89-02, 50-335-89-2, NUDOCS 8903240276 | |
| Download: ML17222A729 (3) | |
Text
ENCLOSURE 1
NOTICE OF VIOLATION Florida Power and Light St. Lucie Docket No. 50-335
'icense No.
DPR-67 During the Nuclear Regulatory Comnission (NRC) inspection conducted on January 23-27,
- 1989, a violation of NRC requirements was identified.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"
10 CFR Part 2, Appendix C (1989),
the violation is listed below:
10 CFR 50, Appendix B, Criterion V requires, in part, that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstance and shall be accomplished in accordance with these instructions.
.1.
Contrary to the
- above, during the period from September 1986 to January 23,
- 1989, the licensee failed to calibrate the safety-related Neutron Flux Channel 26-SOA according to IEC Procedure No.
1-1240065 and the preventative maintenance program.
2.
Contrary to the
- above, during the period from September 1986 to February 24, 1988 and from Hay 1988 to January 23, 1989, the licensee failed to calibrate the safety-related Neutron Flux Channel 26-80B according to IEC Procedure No.
1-1240065 and the preventative maintenance program.
3.
Contrary to the
- above, during the period from November 1985 to January 22,
- 1989, the licensee did not have a specific calibration procedure requiring calibration and did not list the following important to safety High Pressure Safety Injection flow loops FT-3313, FT-3323, FT-3333,- and FT-3343 in the preventative maintenance tracking system.
Consequently, these instrumentation flow loops have not been calibrated since November 23, 1985.
This is a Severity Level IV violation (Supplement I) applicable to Unit 1
only.
P3PPPg76 850P0335 ee0303 PDR PDOCK 0 PNU 9
Florida Power and Light St. Lucie.
Docket No. 50-335 License No.
DPR-67 Pursuant to the provisions of 10 CFR 2.201, Florida Power and Light Company is hereby required to submit a written statement or explanation to the Nuclear Regulatory Commission, ATTN:
Document Control
- Desk, Mashington, DC
- 20555, with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector, St. Lucie, within 30 days of the date of the letter transmitting this Notice.
This reply should be clear'ly marked as a "Reply to a
Notice of Violation" and should include:
(1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results
- achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved.
Where good cause is shown, consideration will be given to extending the response time.
If an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.
FOR THE NUCLEAR REGULATORY COMMISSION Dated at Atlanta, Georgia thisg~Q day of 8,:vc>,
~q g
~
Caudle A. Julian, Chief Eng,ineering Branch Division of Reactor Safety