ML17221A619
| ML17221A619 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 01/19/1988 |
| From: | Berkow H Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17221A620 | List: |
| References | |
| NUDOCS 8802110125 | |
| Download: ML17221A619 (15) | |
Text
~pR R8811, (4
fp,0 Cy
~c 0O lA 'l 0
4
+w*w+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA PO'HER 8 LIGHT COMPANY DOCKET NO. 50-335 ST.
LIICIE PLANT UNIT NO.
1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 89 License No. DPR-67 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Florida Power 8 Light Company, (the licensee),
dated May 13, 198? (L-87-209),
as supplemented October 21,
- 1987, complies with the standards ano requirements of'he Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility wi'll operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangerin1g the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of'his amendment will not be inimical to the corrmon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
8808110 8000335 80119 PDR.
ADOCK 0 PDR P
C
2.
Accordingly, Facility Operating License No.
DPR-67 is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and by amending paragraph 2.C.(2) to read as follows:
(2)
Technical S ecifications The Technical Specifications contained in Appendices A and B,
as revised through Amendment No. 89., are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COÃlISSION
Attachment:
Changes to the Technical Specifications
~ I e bert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation Date of Issuance:
I January lg, 1938
V l
~ 4
~
ATTACHMENT TO LICENSE AMENDMENT NO.
89 TO FACILITY OPERATING LICENSE NO. DPR-67 DOCKET NO. 50-335 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages.
The revised paces are identified by amendment number and contain vertical lines indicating the area of change.
The corresponding overleaf pages are also provided to maintain document completeness.
Remove Pa es 3/4 6-23 Insert Pa es 3/4 6-23
CONTAINMENT SYSTEMS 3/4.6.4
".OMBUSTIBLE GAS CONTROL HYDROGEN ANALYZERS LIMITING CONDITION FOR OPERATION 3.6.4.1 Two independent containment hydrogen analyzers shall be OPERABLE.
APPLICABILITY:
MODES 1
and 2.
ACTION:
With one hydrogen analyzer inoperable, restore the inoperable analyzer to OPERABLE status within 30 days or demonstrate within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> that the grab sample system of the inoperable hydrogen analyzer has the capability to draw a sample of the containment atmosphere into the grab sample canister..
Verify this capability of the grab sample system at least once per 30 days thereafter.
Return the inoperable hydrogen analyzer to OPERABLE status within an additional 60 days.
Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE RE UIREMENTS.
4.6.4.1.1 Each hydrogen analyzer shall be demonstrated OPERABLE by the performance of a CHANNEL FUNCTIONAL TEST at least once per 31 days, and at least once per 92 days on a
STAGGERED TEST BASIS by performing a
CHANNEL CALIBRATION using sample gases containing:
a.
Nominally one volume percent
b.
Nominally four volume percent
ST.
LUGIE - UNIT 1
3/4 6-23 Amendment No. 89,
CONTAINMENT SYSTEMS ELECTRIC HYDROGEN RECOMBINERS -
W LIMITING CONDITION FOR OPERATION 3.6.4.2 Two independent containment hydrogen recombiner systems shall be OPERABLE.
APPLICABILITY:
MODES 1
and 2.
ACTION:
With one hydrogen recombiner system inoperable, restore the inoperable system to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE RE UIREMENTS 4.6.4.2 Each hydrogen recombiner system shall be demonstrated OPERABLE:
a
~
b.
At least once per 6 months by verifying during a recombiner system functional test that the minimum heater sheath temper-ature increases to > 700'F within 90 minutes and is maintained for at le'ast 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
At least once per 18 months by:
1.
Performing a
CHANNEL CALIBRATION of all recombiner instru-mentation and control circuits.
2.
Verifying through a visual examination that there is no evidence of abnormal conditions within the recombiners (i.e., loose wiring or structural connections, deposits of foreign materials, etc.).
ST.
LUCIE - UNIT 1
3/4 6-24
~gS REoy, c4 0p.0 Cy 0O I
cc <
O~
cN
/f ++*<<+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER 8t LIGHT COMPANY ORLANDO UTILITIES COMMISSION OF THE CITY OF ORLANDO, FLORIDA AND FLORIDA MUNICIPAL POWER AGENCY DOCKET NO. 50-389 ST, LUCIE PLANT UNIT NO.
2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
License No. NPF-16 The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Florida Power 8 Light Company, et al. (the licensee),
dated May 13, 1987 (L-87-210),
as supplemented October 21, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facilitywill operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
'The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; cLAd E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have heen satisfied.
2.
Accordingly, Facility Operating License No. NPF-16 is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and by amending paragraph 2.C.2 to read as follows'.
2.
Technical S ecifications The Technical Specifications contained in Appendices A and B,
as revised through Amendment No.
27, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
.3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Charoes to the Technical Specifications Date of Issuance:
January 19, 1988 Herbert N. Berkow, Director Proiect Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation
~
~
~
P t
ATTACMHENT TO LICENSE ANENDHENT NO. U TO FACILITY OPERATING LICENSE NO. NPF-16 DOCKET NO. 50-389 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages.
The revised pages are identified by amendment number and contain vertical lines indicating the area of change.
The corresponding overleaf pages are also provided to maintain document completeness.
Remove Pa es 3/4 6-24 Insert Pa es 3/4 6-24
$ ~
CONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN ANALYZERS LIMITING CONDITION FOR OPERATION 3.6.4.1 Two independent containment hydrogen analyzers shall be OPERABLE.
APPLICABILITY:
MODES 1
and 2.
ACTION:
With one hydrogen analyzer inoperable, restore the inoperable analyzer to OPERABLE status within 30 days or demonstrate within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> that the grab sample system of the inoperable hydrogen analyzer has the capability to draw a sample of the containment atmosphere into the grab sample canister.
Verify this capability of the grab sample system at least once per 30 days thereafter.
Return the inopera'ble hydrogen analyzer to OPERABLE status within an additional 60 days.
Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE RE UIREMENTS 4.6.4.1 Each hydrogen analyzer shall be demonstrated OPERABLE by the performance of a CHANNEL FUNCTIONAL TEST at least once per 31 days, and at least once per 92 days on a
STAGGERED TEST BASIS by performing a
CHANNEL CALIBRATION using sample gases containing:
a.
Nominally one volume percent
b.
Nominally four volume percent
ST.
LUCIE - UNIT 2 3/4 6-24 Amendment No.
27
Valve Ta Number B)
Manual CR Remote Manual Penetration Number TABLE 3. 6-2 (Continued)
CONTAINMENT ISOLATION VALVES Function
~
Maximum Testable During Isolation I-V-18-797 I-V-18-1270 I-V-3463 I-V-07-206 I-V-07-189 I-V-07-170 I-V-07-188 41 46 47 Station Air Supply (Manual)
Station Air Supply'Check)
Safety Injection Tank Test Line (Hanual)
Fuel Pool Cleanup (Inlet)
(Manual)
Fuel Pool Cleanup (Outlet)
,(Manual)
Yes No Yes Yes Yes NA NA NA I-FSE-27-8,9,10, 48 11,15,16 I-FSE-27-12,13,14, 51 17,18 Hz Sampling (Remote Manual)
Hq Sampling (Remote Hanual)
Yes Yes NA I-V-00-140 I-V-00-143 I-V-00-139 I-V-00-144 I-V-00-101 520 52E ILRT (Manual)
ILRT (Manual)
ILRT (Manual)
Yes Yes Yes NA