ML17215A398

From kanterella
Jump to navigation Jump to search
Application for Amend to License DPR-67,reflecting Changes in Offsite Organization & Updating 10CFR50.72 & 50.73 Reporting Requirements.No License Amend Fee Required,Per Generic Ltr 83-43
ML17215A398
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/15/1984
From: Williams J
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML17215A399 List:
References
GL-83-43, L-84-129, NUDOCS 8405230186
Download: ML17215A398 (8)


Text

,/

REGULATORY )FORMATION DISTRIBUTION S'h1 (RIDS) '

ACCESSION NBR e 8905230186 DOC.DATE e 80/05/15 NOTARIZED! YES DOCKET ¹ FACIL 50 335 St Lucio Planti Unit ii Florida Power 3 Light Co ~ 05000335 AUTH NAhiE

~ AUTHOR AFFILIATION NILLIAMSiJ.1'l ~ Florida Power L Light Co.

RECIP NAME

~ RECIPIENT AFFILIATION EISENHUTiD.G. Division of Licensing

SUBJECT:

Application for amend to License DPR-67i reflecting changes in offsite organization 8 updating 10CFR50 72 8 50 '3

~

reporting requirements'o license amend fee requirediper Goner,ic Ltr 83-43 ~

DISTRIBUTION CODE: A001S COPIES RECEIVED:LTR ENCL IZE:

TITLE: OR Submittal: General Distribution I

NOTES; RECIPIENT ID CODE/NAt<E COPIES LI1'TR ENCL 'DRECIPIENT CODE/NAME COPIES LTTR ENCL.

NRR OR83 BC 01 , 7 7 INTERNAL: ELD/HDS? 1 0 NRR/DE/h1TEB NRR/DL DTR 1 1 NRR/DL/DRAB TB 1 1 NRR/DSI/RAB REG FILE 00 1 1 RGN2 EXTERNAL: ACRS 09 6 6 LPDR 03 NRC PDR 02 1 1 NSIC 05 NTIS 1 1 TOTAL NUMBER OF COPIES'REQUIRED: LTTR 25 ENCL ?3

<<1 "r,j yt, s hr Ri 1>>

~'

0 lt a R>C R t rI i 1 C" ' It'1, l ll 1 C,r"',>C

'C.>>

it ~ ><

1 1<<>>1 C ~ h qC, 1 rrrh hrqrr t < f9 f"" arri ~ 4,i. C filf ],trCt )r)'1 qgrr~'i 1 rr'ih~q 1t 'rr C "tg V ClC f )1 il f t g "Ccl l,i w4 a C hl 1-till lf, g ct f Jh l 115 eC'rr 11i i CR Of~t]qft 11 t R>f1 ~)~g) 1 Ail C, '~;,Nllrt 1 ft 'tCC" i, <lg fh y

1 h f1( 'J rt l 1'o,,;r c '1 t,..d .'1 f '1 ",'rCR~RCP Jl C Jf tlirt
At 1 t tlr.lk CL1t' C lc') ~J ii t,-t S..Cr>h 4 'ld.t g (>,rgb ar'C Err' 1 C 'gill

yy)If'~

FLORIDA POWER & LIGHT COMPANY May 15, 1984 L-84-129 Office of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Eisenhut:

Re: St. Lucie Unit 1 Docket No. 50-335 Proposed License Amendment Organization, Event Reporting and Admini strati ve Controls Format In accordance with 10 CFR 50.90, Florida Power 5 Light Company submits herewi th three si gned ori gi n al s and forty copi es of a request to anend Appendix A of Facility Operating License DPR-67.

This anendment is submitted to reflect changes in FPL Off-site Organization, and to update the reporting requirements 10 CFR 50.72 and 10 CFR 50.73. This

'change also revises Section 6, Administrative Controls, and Section 1, Definitions, to be consistent with Unit 2.

The proposed changes are summarized on the attached page and are shown on the f

accomp anyi ng Technical Speci i cation pages.

The position of Vice President St. L'ucie has been approved by Florida Power 8 Light and will be implemented as discussed with the Region II, Regional Admi ni str ato r.

In accordance with 10 CFR 50.91(a)(I), it has been determined that the proposed anendment does not involve arly significant hazards considerations pursuant to 10 CFR 50.92. The No Significant Hazards Considerations determination is attached.-

In accordance with 10 CFR 50.91(b)(I) a copy of the proposed aIIendment is being forwarded to the State Designee for the State of Florida.

The proposed amendment has been reviewed by the St. Lucie Facility Review Group and the Florida Power 8 Light Company Nuclear Review Board.

840523018b 8405i5 PDR ADOCK 05000335 P PDR PEOPLE ~ ~ . SERVING PEOPLE

Of fice of Nucl ear Reacto Regul ati on Attention: Nr. Darrell G. Eisenhut, Director Page 2 Because the significant portions of this change are clarifying and made at the request of the Commission as stated in Generic Letter 83-43, and because the format changes were agreed to in the licensing of Unit 2, a license fee is not provided with this request.

Very truly yours, J.~ W.~ Wi ans, Jr.

Group Vice President Nuclear Energy JWW/PLP/js Attachments cc: J. P. O'Reilly Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atl anta, GA 30303 Lyle Jerrett, Ph.D., Director Offi ce of Radi ati on Control Dept. Health 5 Rehabilitative Services 1317 Winewood Boulevard T,al l.ahassee, FL 32301 P NS-L 1-84-169

, ~

STATE OF FLORIDA )

) SS ~

COUNTY OF DADE )

C. 0. Woody, being first duly sworn, deposes and says:

That he is Vice President Nuclear Operations of Florida Power 5 Light Company, the licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.

C. oody Subscribed and sworn to before me this day of +Y, 1984.

NOTARY PUBLIC, in and for the County of Dade, State of Florida.

fLORIDA

50IARYiPUIILIC SIAIE Of

'RY CqRRISSION EXR. fEU IA,IUDS URD.

IHRU GEHERRL IRS.

't f,,6"lLDED iq)

I6 i I p;

1

/

1 r

/p -

g A

SUMMARY

OF CHANGES Re: St. Lucie Unit 1 Docket Nos. 50-335 Proposed Lice'nse Amendment Organi zati on, Event Reporting and Administrative Controls Format Pa e Numbers Revi si ons I, II, XIV to XVI Table of Contents revised to match Unit 2 1-1 to 1-9 Definitions section revised to be consistent with Unit 2.

1-5 , Reportable Event definition changes in accordance with Generi c Letter 83-43.

3/4 3-37, 3-45 Revised to delete references to Reportable Occurrences 3-50, 4-9, 4-11, in accordance with Generic Letter 83-43 and in 4-17, 4-18, 4-26, conformance with NRC guidance provided in the response 4-37, 4<<53, 6-14, to question 17.2 in NUREG 1022 Supplement 1 (Licensee 6-31) 7-40, 11-5 Event Report System) 11-6, 11-11, 11-12, 11-13, 11-15, 11-17, 12-1, 12-2, 12-11; B3/4 4-3; 6-11; 6-13; 6-16 to 6-19; 6-22 6-1 - 6-26 Revised to be consistent with Unit 2 where applicable.

6-2 Administrative procedures to limit working hours is revised to be consistent wi th NRC accepted FPL position on control of overtime.

6-3,6-4 On-site and off-site organization charts are revised.

6-7 Current membership list of the FRG is retained.

6-8, 6-10, 6-13 Ti tl es are revi sed to ref ect current organizati on.

1

ATTACHMENT Re: St. Lucie Unit 1 Docket No. 50-335 Proposed Li cense Amendment Organization Event Reporting and Administrative Controls Format There are three types of changes in this request. There are organizational changes which show new titles and/or reporting chains for the Nuclear Energy Department. There are changes made in accordance with Generic Letter 83-43 to reflect revisions to event reporting requirements. And finally there, are changes to make'the definitions and Administrative Controls section of the Technical Specifications similar for Units 1 and 2 where applicable. This is the first portion of these changes which will be made as discussed duri.ng the Unit 2 licensing process.

These changes are administrative in nature. The organization changes ar' similar to example (i) of examples of amendments that are considered not likely to involve significant hazards considerations. The changes to the specifications made in accordance with Generic Letter 83-43 are similar to example (vii) in that they are made to make the license conform to changes in the regulations where the license changes result in very minor changes to facility operations clearly in keeping with the regulations. Therefore in accordance with 10 CFR 50.91('a)(I), we have determined that 'this amendment does not involve any significant hazards considerations pursuant to 10 CFR 50.91(c) in that the amendment does not:

(1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) Create the possibility of a new or different kind of accident from. any accident previously evaluated; or (3) Involve a si'gnificant reduction in a margin of safety.