ML17213B054

From kanterella
Jump to navigation Jump to search
Summary of 830127 Meeting W/Util in Bethesda,Md Re Implementation Schedule for Installation of Fire Protection Hardware Items & Fire Program for Operation of Plant Beyond 5% Power
ML17213B054
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/15/1983
From: Nerses V
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8302240127
Download: ML17213B054 (7)


Text

FEB ]. 5 1983 Docket No. 50-389 APPLICANT:

Florida Power and Light Company (FP8L)

FACILITY:

SUBJECT:

St. Lucie Plant, Unit 2

SUMMARY

OF MEETING HELD IN BETHESDA, MARYLAND WITH FP8IL ON JANUARY 27, 1983 ON THE FIRE PROTECTION PROGRAM.

FP8L's implementation schedule for installation of the fire protection hardware items indicated that nearly all the items will be completed by 5X power.

This includes detectors, dampers, barriers, fire seals, cable rerouting and sprinklers (which will be installed to NFPA 13 Code).

After core load up to 5A power, FP&L agreed to provide fire watches and patrols which will meet the requirements of the Technical Specifications for inoperative fire protection components/systems; FP8L will identify the gA/gC procedures that will apply to the fire protection hardware installation.

FPSL will formally submit by 2/9/83 their implementation schedule along with justification for operating the plant beyond 5X power for a few of the items that may not be completed by 55 power.

Also, FP8L will provide an explanation for why these items cannot be completed by 5% power.

supports for the sprinkler system will be backfit ed by November 1983.

/s V. Nerses, Project Manager Licensing Branch 83 Division of Licensing K

Enclosure:

List of Attendees cc:

See next page 8302240l27 8302<5 PDR ADOCIl'5000389 F

~I OFFICE P SURNAME/

DATE II LBP3 VNerses:m 2/N/83 s hton

~ ~ ~ 0 ~ 0 ~ OHIO ~ 0 ~ 0 ~ 0

~ ~ ~ ~

~ 0 ~ 0 ~ ~ ~ ~ ~ ~

~

I 2 b /83

~ ~ ~ ~

~ ~ ~ ~ ~ ooooter ~

~ o

~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

I4RC FORM 318 u0-80] I4RCM 0240 OFFICIAL RECORD COPY USGPO: 1981~960 I

'/A~

~

hfil I

/

AY%

Dr. Robert E. Uhrig, ViCe President Advanced Systems and Technology Florida Power 5 Light. Company Juno Beach, Florida 33408 C

~~ 41

~

fitli Lowenstein, Newman, Reis, Axelrad 5 Toll Washington, D.

C.

20036 Norman A. Coll, Esq.

Steel Hector

& Davis 1400 Southeast First National Bank Building Hiami, Flordia 33131 t)r. t1artin H. Hodder 113'.

E. 86in Street lliami, Flordia 33138 Resident Inspector St. Lucie Nuclear Power Station c/o U. S. Nuclear Regulatory Commission 7900 South A1A Jensen Beach, Flordia 33457 Regional Adminstrator - Region II U. S. Nuclear Regulatory Commission 101 marietta Street Suite 3100 Atlanta, Georgia 30303

~ 0

Li'st of Attendees for the St. Lucie 2 January 27, 1983 Ftre Protection Program Heeting V. Nerses P. Carter D. Hoffman R.

W. Ri'pper W. B. Derrickson C. A. Julian S.

A. Elrod R.

M.

Kemmer C. L. Fisher W, H. Hi'lier J.

F. Stang R. L. Ferguson M. V. Johnston NRR/DL/LB83 FPL/Licensing NRC/NRR/DL/SSPB/STS FPL/Construction FPL/Proj.

General Hanager NRC Atlanta NRC FPL, Fire Prot.

Adm.

FPL

'RC-Region II Fire Protection NRR/DE/CHEB/Fire, Protection NRR NRR/DE

OO 1y

~

4

~

~

I A

~ '

N Docvri.ent Control (50-38g)

~ IQ t pQf)

FEB 15 1983 NSIC LB=3 Reading G. ;,nighton proJect HanaQer VNer ses

Attorney, OELD E. L. Jordon Regional Administrator, Region P.'=,.I ICIPANTS (NPC:

VNerses DHoffman CAJulian SAElrod llHMiller JFStang RLFerguson NVJohnston