Summary of 821014 Meeting W/Util in Bethesda,Md Re Actions Needed to Resolve Reactor Sys Branch Issues
ML17213A698
Person / Time
Site: Saint Lucie 
Issue date: 11/08/1982
From: Nerses V
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8211120220
Download: ML17213A698 (6)


Text

Docket No.:

50-389 NOY 8 l982 APPLICANT:

Florida Power and Light Company, (FP8L).

FACILITY:

St. Lucie Plant, Unit 2

SUBJECT:

SUMMARY

OF MEETING HELD IN BETHESDA, MARYLAND WITH FP8IL ON OCTOBER 14, 1982 REGARDING ACTIONS NEEDED TO RESOLVE RSB ISSUES A summary of the issues discussed and the actions taken is given below.

1.

FPSL letter number for submitting the sump vortex testing report.

By 10/21/82.

2.

3.

FPIIL will provide the revised feedwater line break analysis and methodology by November 30, 1982.

NRC will condition the license to'require submittal and review of this analysis and methodology prior to exceeding 5X power, FP8L will submit revised l CESEC questions responses to the NRC by, 10/21/82.,

4.

NRC agrees to allow a relaxation of the submittal of a report comparing San Onofre 2 natural circulation tests with St. Lucie Unit 2 until prior to exceeding 5Ã power.

FP8L agrees that this report must address all the.

items identified in the SER (Section 5,4.3) requiring resolution on this issue.

5.

FP8L will provide an explanation of the differences and similarities between PSL-1 and PSL-2 natural circulation cooldown analysis.

6.

FP8L will provide a description of their proposed method of protection against inadvertdnt boron dilution events including interim methods before final hardware i's incorporated.

8211120220 821108 "I

PDR ADOCK 05000389 A

PDR cc:

See next page Distribution:

See attached

~1g~ Signed BV':

Victor Nerses, Project Manager Licensing Branch No, 3

Division of Licensing OFFICE SURNAME/

DATE/

DL B¹ ph

~ os \\

~ ~ os

~ ~ o ~ ~ ~ ~

~ ~ ~ ~

g / g /82

~ ~ ~ ooooofooo ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~

DL:

GK

-'1,'

o

~ oooo ~ o\\/fig o

~ ~

~

~ o

~

~ o ~

0

~ ~ ~

I

~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ o ~ ~ ~ ~ ~

~ ~ ~

NRG FORM 318 (10~) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1881~5-960

~:.w 4

ST.

LUCIE Dr. Robert E. Uhrig, Yice President Advanced Systems and Technology Florida Power 8 Light Company P. 0.

Box 5291000 Miami, Florida 33152 Harold F. Reis, Esq.

Lowenstein, Newman, Reis, Axelrad 5 Toll 1025 Connecticut

Avenue, N.W.

Washington, D.

C.

20036 Norman A. Coll, Esq.

Steel Hector

& Davis 1400 Southeast First National Bank Building Miami, Flordia 33131 Hr. Hartin H. Hodder 1131 N.

E. 86th Street Miami, Flordia 33138 Resident Inspector St. Lucie Nuclear Power Station c/o U. S. Nuclear Regulatory Commission 7900 South Alh.

Jensen Beach, Flordia 33457 Regional Adminstrator - Region II

" U. S. Nuclear Regulatory Commission 101 Marietta Street Suite 3100 Atlanta, Georgia 30303

LIST OF ATTENDEES S. Rittenbusch C. Liang L. Marsh D. Hoffman J.

Sheetz R.

Sweeney E. Dotson S.

Webster M. Gancarz J.

Guttmann P.

Abramson V. Nerses P. Carier CE NRC NRC NRC FPSL Ebasco FPSL CE CE NRC ANL NRC FPSL

p

MEETING

SUMMARY

Document Control (50-389)

NRC PDR L PDR NSIC TERA-LB83 Reading J.

Lee G. Knighton Project Manager V. Nerses

Attorney, OELO E. L. Jordon Regional Administrator, Region II J.

M. Taylor PARTICIPANTS NRC C. Laing L. Marsh J.

Sheetz J.

Guttman V. Nerses