Public Version of Revision 0 to Offnormal Operating Procedure 2-1110036, Offnormal Operation of Component Cooling Water Process Monitors a & B.
ML17213A447
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/14/1982
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17213A445 List:
References
2-1110036-01, 2-1110036-1, NUDOCS 8209150366
Download: ML17213A447 (5)


Text

l

anrr rz o~.

>'p

<QCZi~DT U%

'PE SJoQN Co 0 oM3UT

-~04~&/

o C~T'i~l 'wo M~

ON -"

> Pgg~py Op~

ym l1O~

c.

g ~G-iy.g

~ ~

Opcq

CC'4i"~1~ =:~ '. u>QZZ -/ oc 34 i l' W%

Vis $ II ~5'n~

QC ~my D4 ~p aV PlQC+ lg~ t1l ~ ~gtll ~M 4 ~

COP TM1!1Si-1Z~i.~I'Z CQPv m lP ~ ll + i

~

Wg C WillW MO. QQC~~~iT~ "OLD~ ~4~7~~ D HO. OCT~:".1 .".OI.DZ'3 O CW~'P WI~ V HAST lNiCONTROLE;W COPl'"S 1 D. A. Sager 2 '.1RC - 'Rag'on 3 At tn: ?PS 3 anc! I H. ?aduano - GO

3. G. Roos N. SaiIay 6 RSC G. Anglahart - CE 7

8 9

10 'Match Engineers il G. Regal Jonn '.-'.o'ell-Bac!~

T"aining - I.ar. ~

i T3 14 ita~~g Ba'oociick,

~ logan - GO'.

J'. 3oissy R. R. Jennings H l1Ie7ca A..  ?

R~ J .."-".acnec-a AC - TZ::-:Q Attn: Caiei, a- Response Nuc'tanch C e 3uMis 4~

PROC.SSiO 82091503bb 82090i PDR ADOCK 05000335 F PDR

I f

I

~ I

~ ~

FLORIDA POWER & 'GHT COMPANY ST. LUCIE PLEAT UNIT NO ~ 2

~

OFF-NORF~ OPERATING PROC"=DURE VO.

REVISION

~~n36 TITLE: OFF-NORMAL OPERATION OF THE COMPO ENT C V ITORS A & B 2 ~ PREPARED BY: 1&<~

3 ~ SUBCOMMITTEE REVIEW BY: Eor FP&L > M 19+~

4. REVIEWED BY FRG ON:

3 ~ APPROVED BY: Plant Manager 4 19 5'~

6. REVISION REVIEWED BY FRG ON:

7 ~ APPROVED BY: Plant Manager 19

s ~ ~

Page 1 of 2 FLORIDA POWER 6 LIGHT COMPAVLY ST. LUCIE PLANT UNIT iVO. 2 OFFWORMAL OPERATING PROCEDURE NO. 2-1110036 REVISION 0

1.0 TIILE

OFFWORMAL OPERATION OF THE COMPONENT COOLIiiG WATER PROCESS MONITORS A & B 2.0 REVIEW AND APPROVAL:

Facility Review ~use Reviewed by Approved by a

. /r-/> .I ~~ Group Plant Manager 19 VZ Revision Reviewed by FRG 19 Approved by Plant Manager 19 3.0 PURPOSE AND DISQJSSION:

3.1 Purpose This procedure only provides instruction in the off"normal operation of the Component Cooling Water Process Monitors. It does not provide instructions for corrective action for the C.C.W. systems.

These are covered by Off-Formal Operating Procedure 2-0310031, C.C.W. EXCESSIVE ACTIVITY.

3.2 Discussion The C.C.W. process monitors are designed to provide an indication of the radioactivity in either HEADER, and to alarm when the radioactivity reaches or exceeds the alarm setpoint. Radioactive in leakage could occur at:

3.2.1 Letdown Heat Exchangers 3.2.2 Sampling System Heat Exchangers 3.2.3 Shutdown Cooling Heat Exchangets 3.2.4 Contaminated Make Up Water

4.0 SYMPTOMS

4.1 Visual and audible alarms on the Control Room RMS safety cabinets and the three (3) system Operators Terminals.

4.2 Respective channel ALERT, EIRE, or PAIL elates.

4.3 Increasing activity as noted on the respective channel recorders and on the channel graphic display histograms.

FOB ll".FOPiMATION ON<V This document is not controfied. Before use'r verify inforrnefion wifh As controlled doceTnent.

Page 2 of 2 ST. LUCIF, UNIT 2 .

OFF-NORMAL OPERATING PROCEDURE NO. 2-1110036, REVISION 0 OFFWORMAL OPERATING OF THE COMPONENT COOLING WATER PROCESS iWNITORS A AND B

5.0 INSTRUCTIONS

5.1 Immediate Automatic Action 5.1.1 The CCW surge tank vent valve (RCV-14-1) diverts from atmosphere and realigns to the chemical drain tank upon actuation of a HIGH or FAIL alarm.

5.2 Immediate Operator Action 5.2.1 Acknowledge the alarm(s) and notify the Chemistry Department.

5.3 Subsequent Operator Action 5.3.1 The CCW A & B headers are normally operated in a cross" connected mode through the "N" header isolation valves. A leak on either header should result in a trend increase in the other header. Check the CCW radiation monitor recorder trace.

5.3.2 Verify that the CCW surge tank vent valve is aligned to the Waste Management System.

5.3.3 Consult Off-NormalOperating Procedure 2-0310031, CCW Excessive Activity.

5.3.4 For an energized Fail alarm, the channel should be considered out of service. Consult the Plant technical specifications and notify responsible personnel to effect repairs. Note that when the system is operated 3.n the cross-connected mode (see 5.3.1), radiation monitoring capability is achieved via the other CCW rad monitor.

6.0 REFERENCES

6.1 FSAR Section 11.5.2.2.1 6.2 General Atomic Company Technical Mi anuals 6.3 PSL Technical Specifications 7.1 Normal Log Entries