ML17212B605
| ML17212B605 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 05/12/1982 |
| From: | Nerses V Office of Nuclear Reactor Regulation |
| To: | Miraglia F Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8205190329 | |
| Download: ML17212B605 (7) | |
Text
Docket Nos: 50-389 MAY 12 $82
~h
@~
9
~qb@>>
ic MEMORANDUtI FOR:
F. J. Miraglia, Chief, Licensing Branch N
~ 3,~'/I " 11 FROM:
V; Nerses, Project Manager, eicensing Branch No.
DL
SUBJECT:
DATE 5 TIME:
LOCATION:
PURPBSE:
NOTICE OF MEETING WITH FPSL ON ST.
LUCIE 2 REGARDING ST.
LUCIE SITE SAFEGUARDS PROGRN1
- Tuesday, May 25, 1982 8:30 AM Room P-110 Phil.lips Building, Bethesda, Maryland To review FPSL's formal proposal for meeting the require-ments of 10 CFR 73.55(c)(1-5), 73.55(e)(1-2) and 73.55. (4)(6)
PARTICIPANTS:
NRC Staff R. F. Sheldon, N. A. Brightsen.
D. J.
- Kasun, G. Il. McCorkle, V. Nerses, et. al.
PPPL E. Dotson, R, Farber, et, al.
EBASCO and CE Personnel as necessary
@r~iaal Sthene'6 By:
O'K
- GlmA, MC)G.
ISO OO
,, OlO
,'A0 R~
C)O
'OQ O'A
,AOfL cc: 'ee next page Victor Nerses, Project Manager Licensing Branch No.
3 Division of Li'censing MEETING IS CLOSED TO THE PUBLIC SINCE THE SUBJECT IS CONSIDERED SAFEGUARDS INFORMATION AND IS REQUIRED TO BE PROTECTED AGAINST UNAUTHORIZED DISCLOSURE IN ACCORDANCE i/1TH 10 CFR 73.21.
OFFICE/
SURNAME IP VN rs s.tih 5/ Zm/82 OATE IP NRC FORM 318 (10-80) NRCM 0240 DL'Mi
'a
,5!,J...(,9Z.....
OFFICIAL RECORD COPY USGPO: 1981939.960
~ 8 g
I qgf tf
~f f
l
ST.
UC IE Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power 8 Light Company P. 0.
Box 529100 Miami, Florida 33152 Harold F. Reis, Esq.
Lowenstein, Newman, Reis, Axelrad 8 Toll 1025 Connecticut
- Avenue, N.M.
Washington, D.C.
20036 Norman A. Coll, Esq.
Steel Hector 8 Davis 1400 Southeast First National Bank Building Miami, Florida 33131 Mr. Martin H. Hodder 1131 N. E. 86th Street Miami, Fl orida 33138 Resident Inspector St. Lucie Nuclear Power Station c/o U. S. Nuclear Regulatory Coomission 7900 South AlA Jensen Beach, Florida 33457 U. S. Nuclear Regulatory Comnission 101 Marietta Street Suite 3100 Atlanta, Georgia 30303
AGENDA 8:30 AM - Security check-in of NRC representatives 9:00 AM - Site and plant tour
- 11:00 AM - Discussion of the following topics:
1.
Status of construction, management structure for operations, licensing of operators, health physics organization.
2.
Steam generator tube rupture procedure walk through.
3.
Procedures including the status of EOPs, GOPs and SOPs.
4.
Status of fire protection program and compliance with Appendix R.
5.
Status of TMI items including any areas requiring additional time to complete.
6.
Program for engineering verification, i.e,, follow-up to April 27, 1982 meeting in Bethesda, Maryland.
7.
Possible discussion of following items as time permits a.
Environmental qualification b.
Unresolved safety issues
- Working Lunch
I
MEETING NOTICE DISTRIBUTION in Bethesda) t in meeting)
Document Control (50- 389)
NRC PDR LPDR TERA NSIC LB83 Files JLee Project Manager V. Nerses ECase DEisenhut/RPurple RTedesco (only if participant or if held JYoungblood ASchwencer FMiraglia EAdensam JMi 1 1 er GLainas MRussell DCrutchfield TIppolito JKnight WJohnston DMuller TSpeis RHouston LRubenstein FSchroeder MErnst JKramer (Division Directors - only if participan
- Attorney, OELD Thessin OI&E Regional Administrator, Region II Resident Inspector ACRS (16)
OSD (7)
NRC Participants cc:
Service List
R 0
A