ML17212B501

From kanterella
Jump to navigation Jump to search
Application to Amend License DPR-67 Consisting of Changes to Tech Specs Modifying Time Limit from 10 Days to 30 Days for Submittal of Beach Dune Survey Results
ML17212B501
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/09/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML17212B502 List:
References
L-82-140, NUDOCS 8204130083
Download: ML17212B501 (6)


Text

REGULATOR RMAT ION DI'STRIBUTION, (RIDS)

AOGESSXON NBR;82P4130083 DOC,DA'TE: 82/09<<<<<<'09 NOTARIZED'O DOCKET. 0 FACIL 50 335 'Sbs 'Lucre 'Planti, Unlit

~ NPME AUTHOR A F F ILIATION ii 'Fl or'ida 'Power -8 L'ight <<Cos'AUTH 05000335 UHRIGt R ~ E ~ 'Florida <<Power 8 "Li,ght:Co ~

RE<<CIP ~ NAME, RECXPIENT AFFIL'IRTION EISENHUTDi D. G, .Division of 'Licensing

SUBJECT:

Application >to amend L)cense .DPR 67 'consisting of chariqes to

'-Tech.Speos, godifying:.time limit from 10 -.days to 30 days for submittal of Beech Dune .survey r<<esqtls DI'STRISUTION CODE: AGO<<S

<<TI<<TLE: General

>COPIES

~

RECEIVED:UTR .J "ENCL:J SIZE:

Distr i'bution for afber -Issuanoe of Operating License er ~

NOTES; RECIPIENT 'D

<<COPIES REC IP XENT COPIES iCODE/NAME L'TTR ENCL ID 'CODE/NAM<<E L7TR ENCL ORB 03 BC 01 13 13 INTERNAL:,ELD 1 0 ""IE, . 06 NRR/DHFS DEPY08 1 NRR/DL.DER fi RAB 1 0 NRR/DSI/RAB 1 EG F L 00 1 1 RGN2 1 EXTERNAL: ACRS 09 10 10 LPDR 03 NRC PDR '02 1 1 NSXC 05 NTIS 1 1

'TOTAL NUMBER OF COPIES REQUIRED! LTTR 35 ENCL 33

0 Hk g

4 I I 4 k

C S>>k

'>> ll I +

"Hii> F 'f I>> 0 'H'

'ii g

~

H' Hil Ii 'k I y 'I H~ III IH)>> f.II>>)IH~ )

II IH ~

p,j

~0 Ii, Sk HIH

yi(lib~

ifA~<A FLORIDA POWER & LIGHT COMPANY April 9, 1982 L-82-140 Office of Nuclear Reactor Regulation Attention: Mr. Darrel1 G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Eisenhut:

Re: St. Luci e Uni t 1 Docket No. 50-335 Proposed Amendment to Facility Operating License DPR-67: Beach Dune Surve Re ort In accordance with 10 CFR 5550.90 and 50.30 Florida Power 8 Light (FPL) herewi th submits three originals and 40 copies of a request to Appendix A to Operating License DPR-67 for St. Lucie Unit 1. The amendments are shown on the attached Technical Specification pages bearing the date of this letter in the lower right hand corner.

This request modifies the time limit of Appendix A Technical Specification 4.7.6.1.1 from 10 days to 30 days within which the Beach Dune Survey results must be submitted to the Commission after completion of the survey. Due to logistics such as travel time, data analysis, typing and mailing time, it is extremely difficult to meet the 10 day reporting requirement. The results of these surveys, which were initiated in 1976, have indicated that there has been no significant change on the beach or in the dune profiles during the last five years. On that basis, there does not seem to be cause for such an extreme level of concern as would be indicated by the 10 day requirement.

Since we presently have outstanding several Technical Specification proposals, it is requested that this minor change be considered with our request of October 27, 1980 (L-80-354).

/ool S

//

8204130083 820409;.',

~,'

~

) PDR, ADOCK.05000335" P '"

PDR PEOPLE... SERVING PEOPLE

~ ~

0 ~

\ ~ 0

Mr. DarrellG. Eisenhut Page Two The proposed amendments have been reviewed by the St. Lucie Facility Review Group, the Company Environmental Review Group, and the Company Nuclear Review Board. They have determined that the proposed amendments are administrative in nature and will result in no adverse effects on the environment.

Very truly yours, gd Robert E. Uhrig Vice President Advanced System 8 Technology REU/GJK/ga Attachments cc: J. P. O'Reilly, Director Region II Harold Reis, Esquire

e. h c'-