~,< A<op G+
0 V
O lh g~, ',
'+0 90 UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORYCOMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, D. C. 20555 November 17, 1981 The Honorable Hunzio J. Palladino Chairman U.
S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
REPORT OH ST.
LUCIE PLANT UNIT HO.
2
Dear Or. Palladino:
During its 259th meeting, November 12-14,
- 1981, the Advisory Committee on
- '"'"Rea'ctorSafegua'rds'hvfewed"the
'appl'idkt'io'n 'of the'F]or'ida Power and L'ight'ompany (the Applicant) for authorization to operate the St. Lucie Plant Unit Ho. 2.
The project was considered at a Subcommittee meeting in West Palm Beach, Florida on October 30-31, 1981 and members of the Coknittee toured the facility on October 30, 1981.
In its review the Committee had the benefit of discussions with representatives of the Applicant, Combustion Engineering, Inc.,
Ehasco
- Services, Inc., the NRC Staff, and members of the public.
The Committee also had the benefit of the documents lis d.
The Committee commented on the construction permit aoplication for S
. Lucie Plant Unit No.
2 in a report dated December 12, 1974 to AEC Chai rman Dixie Lee Ray.
St. Lucie Plant Unit No.
2 is located on Hutchinson Island adjacent to Unit Ho.
1, which went into commercial operation in December 1976.
Both units use Combustion Engineering nuclear steam supply systems with a rated core power of 2560 tiWt.
The two units are nearly identical.
A number of items have been identified as Outstanding
- issues, Corfirmatory
- Issues, and License Conditions in the NRC Staff's Safety Evaluation Report dated October 1981.
These include some TMI-2 Action Plan requi rments.
We believe these issues can be resolved in a manner satisfactory to the HRC Staff.
We also recommend resolution of concerns on instrumen ation for detection of inadequate core cooling expressed in the ACRS letter to the Executive Director for Operations dated June 9,
1981.
Discussion with the Florida Power and Light Company Staff indicated that emergency operating procedures for dealing with off-normal plant behavior that might develop during the operation of St. Lucie Plant Unit No.
2 are incomplete.
We recommend that a concentrated effort be made by ~e Florida Power and Light Company staff to complete emergency operating pro-cedures which take advantage of new information and approaches developed during the past two years.
This matter should be resolved in a manner sati s actory to the NRC Staff.
The Committee wishes to be kept
- nformed.
jg '.O'L<21 cy 12020100Y, 0500038",,f.
9>,P,DOC,,,
PDR '..-'-
~
fl.
C
Honorable Nunzio J. Palladino November 17, 1981 At the time this site was initially approved, the population density was relatively low, and the projected increase during the life of the plant was not unusually large.
Since that time, the growth in population has been much more rapid than predicted, and current estimates predict continued growth at relatively high rates.
Although the present population and that predicted for the next several years are not a cause for concern, it now seems possible that the population density in portions of the sur rounding area could reach a level,. during the lifetime of the St. Lucie Plant, that might then warrant additional measures.
We recommend that the Applicant and the NRC Staff periodically review the actual and projected population growth.
If required as a result of these
- reviews, plans for appropriate preventive or. remedial measures could then be made in a considered but timely manner.
"'. -':":Me"i'ecomme'nd Clif~"thi."MZ1'f":g'ive".due':regard:-'to""'th'e'spec'fdl'Aiature'.of'h'1's": "~"
site in evaluating the final emergency plan.
The Advisory Committee on Reactor Safeguards believes that, if due regard is given to the items mentioned
- above, and subject to satisfactory com-pletion of construction, staffing, and preoperational testing, there is reasonable assurance that the St. Lucie Plant Unit No.
2 can be operated at core power levels up to 2560 MWt without undue risk to the health and safety of the public.
Additional comments by Members H.
W. Lewis and M. S. Plesset are oresented below.
Sincerely yours, J.
Carson Mark Chairman Additional Comments by Members H.
W. Lewis and M. S. Plesset In the. aftermath of the accident at Three Mile Island Unit 2, which dramat-ically emphasized the importance of instrumentation to follow the course of an accident, the NRC Staff has required applicants for an Operating License to demonstrate specific capability to detect the onset of inadequate core cooling.
For PWRs this has come to mean in practice the provision, inter alia, of an instrument which can be called a water-level indicator for the pressure vessel.
(Although the NRC Action Plan allows for alternatives, none appear to have been seriously contemplated.)
A number of such devices have been accepted and/or proposed, some of which measure differential pressure,-
some average void fraction in a part of the pressure
- vessel, some cooling rate at a number of places in the vessel.
All can give spurious response because of dynamic effects.
Honorable Nunzio J. Palladino 3
November 17, 1981 Many of these views have been previously expressed in the Committee letter of June 9, 1981.
Me are concerned that, in the commendable eagerness to -avoid a repetition of TMI, the NRC Staff is requiring ill-defined instrumentation without any clear picture of the contribution of that instrumentation to the prevention or mitigation of accidents
- considerations which must, necessarily be scenario, dependent.
'If it were really true that core water level were the important parameter, then differential pressure indicators would appear to be preferable,
~rovided the coolant is quiescent.
Ef instead cooling capa-city is important, then some form of heated wire or themocouple would ap-pear to be preferable.
Since either may be acceptable, we are left with the inference that the NRC Staff has not really clarified the role of this instrumentation..
Me believe that, before, not after requiring these instruments for all the new plants, the N~RC taff should develop a position regarding their utility.
This position, which should be based upon accident analysis and risk assess-
- ment, would lead to a much clearer understanding of just what ins rumenta-tion, if any, is needed.
RE, ERENCES F
P 2
Pgg P.P y,"2.2 2 Py,g
.2 Safety Analysis Report," with Amendments 1 through 6.
2.
U.S. Nuclear Regulatory Commission, "Safety Evaluation Report Related to the Operation of St. Lucie Plant, Unit No. 2," Docket No. 50-389, USNRC Report HUREG-0843, dated October 1981.
3.
Letter from Betty Lou Mells to the Chairman of the Advisory Committee on Reactor Safeguards, dated October 28, 1981.
4.
Mritten statement by Joette Lorian, Research Director for the Center for Nuclear Responsibility.