Forwards Status of Final Branch SER Inputs.Action Must Be Taken on Unreviewed & Uncompleted Sections.Branches Which Met Schedule Input Date Commended
ML17212A806
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/16/1981
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Hanauer S
Office of Nuclear Reactor Regulation
References
NUDOCS 8109290123
Download: ML17212A806 (6)


Text

SEP 16198l

~1>l

.'<<3 1,81981~

@~ )010LgÃk+~~A MEMORANDUM FOR:

DSI Assi stant Directors Cy DE Assistant Directors S.

H. Hanauer, Director, Division of Human Factors Safety, NRR FROM:

SUBJECT:

R. L. Tedesco, Assistant Director for Licensing, DL 7

Status of Staff Final St. Lucie 2

SER Inputs As of September 14,-1981, the status of the staff final St. Lucie 2 SER

'official inputs by Branch is provided in the Attachment.

Eighteen out of twenty-six branches have provided partial to no final input. It is necessary that the. A/D take the required actions to correct this situation in order to assure that the SER issuance date is met.

The attached indicates input received by SRP Section.

Each branch should identify to the PM any remaining SERI,s'ections and corresponding SRP sections which have yet to be reviewed and/or completed.

I want to comw.nd those branches who met the schedule input date.

St.

Lucie 2 is on an accelerated schedule and many of the branches, namely RSB, ASB, SEB,

ICSB, ETSB, and CSB, rose to the occasion to meet the schedule and still maintain the high quality reviews.

Of particular note was the performance of RSB.

RSB was permitted to;,submit their input a week late because of the priority effort applied to SRP revisions; neverthe-

less, they still managed to meet the official 9/12/81 schedule date.

Enclosure:

As stated Orlgnalsl~

b~'obert L. Tedesco, Assistant Director for Licensing Division of Licensing cc:

H. Denton D. Eisenhut R. Vollmer R. Mattson

~B. Grimes DISTRIBUTION:

Docket File 50~389 LPDR PDR NSIC TERA LB¹3 files RLTedesco FJMiraglia VNerses OFFICEN SURNAME/

DATE $

9/J8/8)

DL:

FJ 'lia

~

~

~0 ~ 0 ~I~I~ 0 ~

9 81

~

~ ~ 0 ~\\ ~ 0 ~ 0 ~ 0 DL:

RLTe sco 9

/81

( 8109290i23 Bi09i6

"'I PDR ADOCK 0500038'91

<A Pq~

t

~

~Iootloto ~ ~

K

'~~~ NRC FORM 318 OO-80) NRCM 0240 OFFICIAL RECORD COPY US0 PO: 1981~960

l>>

a

~

~ ~

I"

<<<< ~ ~

II 1 W r<<

ti I 1 I

~

<< ~

>I

~

~ ~ ~ 1 1

>> ~ Ii e>>V l

~ ~

~I

~

1

~ 1>

'y>>'lF'"

-<<"I

<

~

1

>>I

<WS I

<<f I, I

<<1 I>

> i

~

'>4 j>> I>>>

ATTACHMENT Branch Reviewer SAB (Brauner)

AEB (Krug

& Fairobent)

H&GEB (Wescott

& Pichumani)

GSB (Cardone, McMullen)

MEB (Rajan, Kirkwood)

SEB (Polk)

ASB (Ridgely)

MTEB EQB (Chang,

Kennedy, Riggs)

CPB (Powers, Kopp, Balukjian)

RSB (Rubin)

CEB (Witt, Harrison, Turovlin)

CSB (Shum)

ETSB (Lee)

I&CSB (Stevens)

PSB (Chopra, Giardina)

RAB (Serbu)

I&E (Jape)

OLB (Salah)

EPLB (Perrotti)

P&TRB (Kennedy, Lieder'bach)

PSLB (Skelton)

No. of SRP Sections Res r. for 16 8

3 12 12 29 16 3

8 28 10 11 8

7 16 5

5 2

1 3

1 No. of SRP Sections submitted in DSER for the scheduled input DA5 of Au ust 3, 1981 0

10 0

0 8

12 29 3

0 0

0 5

1 0

7 2

5 0

0 0

0 1

No.. of SRP Sections submitted in SER for the scheduled input Date of Se tember 12, 1981 0

10 6

0 42 12 29 11 0

4 28 55 11 8

7 0

5 0

0 0

3 0

a)

)

Branch Reviewer No. of SRP Sections Res r. for No. of SRP Sections submitted in DSER for the scheduled input Date of Au ust 3, 1981 No. of SRP Sections submitted in SER for the scheduled input Date of Se tember 12 1981 LGB QAB (Conway)

HFEB (Joyce)

UFB GIB (Anderson)

Chap.

20 of SER 0

App.

C. of SER 0

Reviews of SRP Sections that are missing from SER l.

2.3.1, 2.3.2, 2.3.-3, 2.3.4, 2.3.5, 15.7.5 2.

3.6.2, 3.7.3, 3.9.1, 3.9.2, 3.9.3, 3.9.4, 3.9.5, 3.9.6 3.

3.5.1.3, 5.2.4, 5.4.1.1, 6.6, 10.2.3 4.

4.2, 4.4 5.

9. 1. 2, 9.5. 1, 10.3.5, 10.4.6, 10.4.8 6.

2.5.4, 2.5.5