ML17212A232

From kanterella
Jump to navigation Jump to search
Order That ASLB 810616 Order Dismissing License Proceeding Will Not Be Finalized Until Outcome of Pending Petitioner Appeal Is Determined
ML17212A232
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/18/1981
From: Bishop C
NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP)
To:
FLORIDA POWER & LIGHT CO., NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
References
ISSUANCES-OL, NUDOCS 8106250208
Download: ML17212A232 (2)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING APPEAL BOARD 4 Administrative Judges:

Alan S. Rosenthal, Chairman Dr. John H. Buck Christine N. Kohl

~t V~

a

" ~@re]s fog f; ~

3ggn,:

JUN 241981~

y g gg~~ g<QQUliTOK5 f

CoeWSSON 8] o s/K, h In the Matter of FLORIDA POWER

& LIGHT COMPANY (St. Lucie Plant, Unit No.

2)

)

)

)

)

N~OM49~

gERYE" JUN ~9 t+~

ORDER one 18, 198 On June 16, 1981, the Licensing Board entered an order dis-missing this operating license proceeding involving Unit 2 of the St. Lucie nuclear facility.

The basis of the dismissal was that the only admitted intervenor had notified the Board that she was withdrawing from the proceeding.

Previously, on June 3,

1981, the Licensing Board had entered an order in which it had, inter alia, denied a joint petition for leave to intervene filed by Parsons and Whittemore, Inc.

and Resources Recovery (Dade County), Inc.

Those petitioners have taken an appeal from that denial under 10 CFR'.714a.

The time for the filing of responses to the brief in support of the appeal has not yet expired.

Obviously, the validity of the June 16 order dismissing the proceeding hinges upon the outcome of the pending appeal.

For this reason, that order shall "not be accorded finality until such time as the appeal is determined.

It is so ORDERED.

FOR THE APPEAL BOARD Q..

C. Je n Bzs op Secretary to the Appeal Board