ML17209B155

From kanterella
Jump to navigation Jump to search
Forwards LER 81-025/03L-0
Date released: 01/25/2018 Download: ML17209B155


LER 81-025/03L-0:on 810430,during Reactor Protection Sys Logic Matrix Test While at 100% Power,Trip Unit Failed to Illuminate as Required.Caused by Bad Connection to Cabinet. Connector Cleaned.Unit Reinserted Into Sys Cabinet
ML17266A462
Person / Time
Site: Saint Lucie 
Issue date: 05/29/1981
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A462 (1)
Forwards LER 81-025/03L-0
ML17209B154
Person / Time
Site: Saint Lucie 
Issue date: 05/29/1981
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17209B154 (2)