ML17209A393

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 80-046/03L-1
Date released: 01/25/2018 Download: ML17209A393


Updated LER 80-046/03L-0:on 800827,while at 100% Power, Control Element Assembly 33 Dropped to Fully Inserted Position.Caused by Failed 15-volt Dc Power Supply in Coil Power Programmer.Power Supply Replaced
ML17266A366
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/19/1980
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A366 (2)
Forwards Updated LER 80-046/03L-1
ML17209A392
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/19/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17209A392 (2)