ML17209A190

From kanterella
Jump to navigation Jump to search
Forwards LER 80-048/03L-0
Date released: 01/25/2018 Download: ML17209A190


LER 80-048/03L-0:on 800826,during Full Power Operation, Control Element Assembly 51 Dropped to Full Insertion.Caused by Failed Power Supply Unit.Power Supply Replaced & Assembly Aligned W/Assembly Group Height.Returned to Svc
ML17266A268
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/24/1980
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A268 (1)
Forwards LER 80-048/03L-0
ML17209A189
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/24/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17209A189 (1)