ML17208A912

From kanterella
Jump to navigation Jump to search
Forwards Revised LER 80-003/03L-1
Date released: 01/25/2018 Download: ML17208A912


Revised LER 80-003/03L-1:on 800106,during Normal Operations, Control Element Assembly 30 Reed Switch Position Indication Channel Failed.Cause Is Unknown.Channel Repaired & Returned to Svc
ML17266A245
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/24/1980
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A245 (2)
Forwards Revised LER 80-003/03L-1
ML17208A911
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/24/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17208A911 (1)