Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML17241A4441999-08-18018 August 1999 Application for Amend to License NPF-16,to Change Required Surveillance Frequency for Cycling Steam Valves in Turbine Overspeed Protection Sys from Once Per Month to Once Per Quarter (92 Days).Proprietary Encls Withheld ML17241A3521999-06-0101 June 1999 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 3.5.2 to Allow Up to 7 Days to Restore Inoperable LPSI Train to Operable Status ML17241A3431999-05-24024 May 1999 Application for Amend to License NPF-16,revising Unit 2 TS 3/4.5.1, Safety Injection Tanks, by Clarifying Nonconservative Wording of Surveillance 4.5.1.1.d.1 to Align Surveillance with Intent & Design Bases Requirements ML17229B0181999-02-23023 February 1999 Application for Amend to License NPF-16,removing Redundant Concentration Monitoring Requirements Specified for Modes 3 Through 6 by Deleting TS 3/4.1.2.9, Reactivity Control Sys- Boron Dilution. ML17229A9541998-12-16016 December 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9221998-11-22022 November 1998 Application for Amend to License DPR-67,revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 ML17229A9111998-11-19019 November 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position ML17229A8421998-08-24024 August 1998 Application for Amends to Licenses DPR-67 & NPF-16,removing Obsolete License Conditions & Incorporating Attached TS Revs ML17229A7581998-06-0303 June 1998 Application for Amends to Licenses DPR-67 & NPF-16 to Incorporate Attached TS Revs.Proposed Amends Are Administrative in Nature & Will Modify Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 ML17229A7461998-05-27027 May 1998 Application for Amend to License NPF-16,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions ML17229A7491998-05-27027 May 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 6.2.2.f to Allow Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews ML17229A7421998-05-27027 May 1998 Supplemental Application to 961031 Proposed Amend to Licenses DPR-67 & NPF-16,providing for More Efficient Use of on-site Mgt Personnel in Review & Approval Process for Plant Procedures ML17229A6481998-03-0303 March 1998 Application for Amend to License NPF-16,revising Applicability of TS 3.4.7 Re RCS Chemistry,Consistent W/ Corresponding Specification for Unit 1 ML17309A9161997-12-31031 December 1997 Application for Amend to License NPF-16 by Incorporating Attached TS Rev.Amend Will Modify TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9111997-12-29029 December 1997 Application for Amend to License NPF-16,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17229A5471997-12-0101 December 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising EPP Section 4, Environ Conditions & Section 5, Administrative Procedures, to Incorporate Proposed Terms & Conditions of Incidental Take Statement ML17229A4601997-08-22022 August 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising Specification 4.0.5,Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Controls Section ML17229A4321997-08-0101 August 1997 Application for Amend to License NPF-16,extending semi- Annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 ML17229A4211997-07-22022 July 1997 Application for Amend to License DPR-67,incorporating Recent Evaluation of Postulated Inadvertent Opening of MSSV Into Current Licensing Basis ML17229A3581997-05-29029 May 1997 Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Administrative Changes That Will Improve Consistency Throughout TSs & Related Bases ML17229A1811996-12-20020 December 1996 Application for Amend to License DPR-67,requesting Deletion of Footnote Re TS 2.1.1, Reactor Core Safety Limits. ML17229A1591996-12-0909 December 1996 Application for Amend to License DPR-67,requesting Mod for Selected cycle-specific Reactor Physics Parameters to Refer to COLR for Limiting Values ML17229A1171996-10-31031 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting Revisions to 6.5.1 Re Facility Review Group & 6.8 Re Procedures & Programs ML17339A0431996-10-30030 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting to Revise TS 3/4.9.9 Re Refueling Requirements & TS 3/4.9.10 Re Refueling Operations,Water level-reactor Vessel ML17229A1071996-10-28028 October 1996 Application for Amend to License NPF-16,modifying TS to Implement 10CFR50,App J,Option B,To Revise TS to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17229A1041996-10-28028 October 1996 Application for Amend to License DPR-67,requesting to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17228B5621996-07-15015 July 1996 Application for Amends to Licenses DPR-67 & NPF-16 Revising Core Alteration Definition ML17228B5021996-06-0101 June 1996 Application for Exigent Amend to License DPR-67,revising TS Re Thermal Margin & RCS Flow Limits.Siemens Power Corp Rept EMF-96-135, St Lucie Unit 1 Chapter 15 Event Review & Analysis for 30% SG Tube Plugging Encl ML17228B3741996-01-0404 January 1996 Application for Amends to Licenses DPR-67 & NPF-16 Revising TS 3.5.3 to Rectify Discrepancy for Each St Lucie Unit & to Provide Assurance That Admin Controls for Hpsip Remain Effective in Lower Operational Modes ML17228B3341995-11-22022 November 1995 Application for Amends to Licenses DPR-67 & NPF-16,amending TS 3/4.4.6.1 for RCS Leakage Detection Instrumentation by Adapting STS for C-E Plants (NUREG-1432),Spec 3.4.15 for Facilities ML17228B2861995-10-0505 October 1995 Application for Amends to Licenses DPR-67 & NPF-16,removing SR Re Dune & Mangrove Surveys from TS ML17228B2401995-08-16016 August 1995 Application for Amends to Licenses DPR-67 & NPF-16, Relocating Selected TS Requirements Re Instrumentation,Per Final Policy Statement on TS Improvements & Relocating TS Re Emergency & Security Plan Review Process Per GL 93-07 ML17228B2431995-08-16016 August 1995 Application for Amend to License NPF-16,modifying Spec 3.6.6.1, Sbvs to More Effectively Address Design Functions Performed by Sbvs for Shield Bldg & Fuel Handling Bldg,Per NUREG-1432 ML17228B1871995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Revise Action Statements & Certain Surveillances of TS 3/4.5.1 Re Safety Injection Tanks ML17228B1771995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Extend Allowed Outage Time for Inoperable EDGs ML17309A7921995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Allow Up to Seven Days to Restore an Inoperable LPSI Train to Operable Status ML17228B1451995-05-17017 May 1995 Application for Amend to License DPR-67,extending Applicability of Current RCS Pressure/Temp Limits & Maximum Allowed RCS Heatup & Cooldown Rates to 23.6 Effective Full Power Yrs of Operation ML17228B1421995-05-17017 May 1995 Application for Amends to Licenses DPR-67 & NPF-16 Re Administrative & Conforming Update ML17228B0881995-04-0303 April 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Incorporate line-item TS Improvements to TSs 3/4.8.1 & 4.8.1.2.2 ML17228B0571995-02-27027 February 1995 Application for Amend to License NPF-16,modifying Surveillance Requirement 4.9.8.1 & 4.9.8.2 to Allow Reduction in Required Min Shutdown Cooling Flow Rate Under Certain Conditions During Operational Mode 6 ML17228B0501995-02-27027 February 1995 Application for Amend to License NPF-16,revising TS Tables 3.3-3 & 3.3-4 to Accommodate Improved Coincidence Logic & Relay Replacement for 4.16 Kv Loss of Voltage Relay ML17228B0311995-02-22022 February 1995 Application for Amends to Licenses DPR-67 & NPF-16,deleting Refs to Automatic Tester for Containment Personnel Air Lock from TS 4.6.1.3 ML17228A9901995-01-20020 January 1995 Application for Amends to Licenses DPR-67 & NPF-16, Relocating Operability Requirements for Incore Detectors (TS 3/4.3.3.2) to Updated FSAR & Revising Lhr Surveillance 4.2.1.4 & Special Test Exceptions Surveillances ML17352B0001995-01-17017 January 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 6.9.1.7, COLR, Re Implementation of FPL Nuclear Physics Methodology for Calculations of COLR Parameters.Fpl Topical Rept NF-TR-95-01, Nuclear Physics Methodology... Encl ML17228A9011994-11-0202 November 1994 Application for Amends to Licenses DPR-67 & NPF-16,upgrading TS 3/4.6.2.1 & 3/4.6.2.3 by Adapting Combined Spec for Containment Spray & Cooling Sys Contained in Std TS for C-E Plants ML17309A7511994-10-27027 October 1994 Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Encl Administrative Changes ML17228A6501994-07-28028 July 1994 Application for Amends to Licenses DPR-67,revising TS 3/4.4.13 to Incorporate LTOP Requirements Similar to LTOP Requirements Recommended by NRC Via GL 90-06,in Accordance W/Resolution of Generic Issue 94 ML17228A6571994-07-25025 July 1994 Application for Amends to Licenses DPR-67 & NPF-16,revising Ts,Implementing Enhancements Recommended by GL 93-05 Re line-item TS Improvements to Reduce SR for Testing During Power Operation. ML17228A6541994-07-25025 July 1994 Application for Amend to License NPF-16,proposing TS Upgrading TS 3/4.7.1.6 for Main Feedwater Line Isolation Valves to Be Consistent w/NUREG-1432,standard TS for C-E Plants ML17228A5751994-05-23023 May 1994 Application for Amend to License DPR-67,revising TS 3.5.2 for ECCS by Removing Option That Allows HPSI Pump 1C to Be Used as Alternative to Preferred Pump for Subsystem Operability 1999-08-18
[Table view] Category:OPERATING LICENSES-APPLICATION FOR & AMENDMENTS
MONTHYEARML17208A4641980-03-31031 March 1980 General Info Section of Application for OL 1980-03-31
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17241A4441999-08-18018 August 1999 Application for Amend to License NPF-16,to Change Required Surveillance Frequency for Cycling Steam Valves in Turbine Overspeed Protection Sys from Once Per Month to Once Per Quarter (92 Days).Proprietary Encls Withheld ML17241A3521999-06-0101 June 1999 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 3.5.2 to Allow Up to 7 Days to Restore Inoperable LPSI Train to Operable Status ML17241A3431999-05-24024 May 1999 Application for Amend to License NPF-16,revising Unit 2 TS 3/4.5.1, Safety Injection Tanks, by Clarifying Nonconservative Wording of Surveillance 4.5.1.1.d.1 to Align Surveillance with Intent & Design Bases Requirements ML17229B0181999-02-23023 February 1999 Application for Amend to License NPF-16,removing Redundant Concentration Monitoring Requirements Specified for Modes 3 Through 6 by Deleting TS 3/4.1.2.9, Reactivity Control Sys- Boron Dilution. ML17229A9541998-12-16016 December 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9221998-11-22022 November 1998 Application for Amend to License DPR-67,revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 ML17229A9111998-11-19019 November 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising Administrative Controls TS 6.3, Unit Staff Qualifications & Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position ML17229A8421998-08-24024 August 1998 Application for Amends to Licenses DPR-67 & NPF-16,removing Obsolete License Conditions & Incorporating Attached TS Revs ML17229A7581998-06-0303 June 1998 Application for Amends to Licenses DPR-67 & NPF-16 to Incorporate Attached TS Revs.Proposed Amends Are Administrative in Nature & Will Modify Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 ML17229A7461998-05-27027 May 1998 Application for Amend to License NPF-16,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions ML17229A7491998-05-27027 May 1998 Application for Amends to Licenses DPR-67 & NPF-16,revising TS 6.2.2.f to Allow Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews ML17229A7421998-05-27027 May 1998 Supplemental Application to 961031 Proposed Amend to Licenses DPR-67 & NPF-16,providing for More Efficient Use of on-site Mgt Personnel in Review & Approval Process for Plant Procedures ML17229A6481998-03-0303 March 1998 Application for Amend to License NPF-16,revising Applicability of TS 3.4.7 Re RCS Chemistry,Consistent W/ Corresponding Specification for Unit 1 ML17309A9161997-12-31031 December 1997 Application for Amend to License NPF-16 by Incorporating Attached TS Rev.Amend Will Modify TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9111997-12-29029 December 1997 Application for Amend to License NPF-16,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17229A5471997-12-0101 December 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising EPP Section 4, Environ Conditions & Section 5, Administrative Procedures, to Incorporate Proposed Terms & Conditions of Incidental Take Statement ML17229A4601997-08-22022 August 1997 Application for Amends to Licenses DPR-67 & NPF-16,revising Specification 4.0.5,Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Controls Section ML17229A4321997-08-0101 August 1997 Application for Amend to License NPF-16,extending semi- Annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 ML17229A4211997-07-22022 July 1997 Application for Amend to License DPR-67,incorporating Recent Evaluation of Postulated Inadvertent Opening of MSSV Into Current Licensing Basis ML17229A3581997-05-29029 May 1997 Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Administrative Changes That Will Improve Consistency Throughout TSs & Related Bases ML17229A1811996-12-20020 December 1996 Application for Amend to License DPR-67,requesting Deletion of Footnote Re TS 2.1.1, Reactor Core Safety Limits. ML17229A1591996-12-0909 December 1996 Application for Amend to License DPR-67,requesting Mod for Selected cycle-specific Reactor Physics Parameters to Refer to COLR for Limiting Values ML17229A1171996-10-31031 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting Revisions to 6.5.1 Re Facility Review Group & 6.8 Re Procedures & Programs ML17339A0431996-10-30030 October 1996 Application for Amends to Licenses DPR-67 & NPF-16, Requesting to Revise TS 3/4.9.9 Re Refueling Requirements & TS 3/4.9.10 Re Refueling Operations,Water level-reactor Vessel ML17229A1071996-10-28028 October 1996 Application for Amend to License NPF-16,modifying TS to Implement 10CFR50,App J,Option B,To Revise TS to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17229A1041996-10-28028 October 1996 Application for Amend to License DPR-67,requesting to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17228B5621996-07-15015 July 1996 Application for Amends to Licenses DPR-67 & NPF-16 Revising Core Alteration Definition ML17228B5021996-06-0101 June 1996 Application for Exigent Amend to License DPR-67,revising TS Re Thermal Margin & RCS Flow Limits.Siemens Power Corp Rept EMF-96-135, St Lucie Unit 1 Chapter 15 Event Review & Analysis for 30% SG Tube Plugging Encl ML17228B3741996-01-0404 January 1996 Application for Amends to Licenses DPR-67 & NPF-16 Revising TS 3.5.3 to Rectify Discrepancy for Each St Lucie Unit & to Provide Assurance That Admin Controls for Hpsip Remain Effective in Lower Operational Modes ML17228B3341995-11-22022 November 1995 Application for Amends to Licenses DPR-67 & NPF-16,amending TS 3/4.4.6.1 for RCS Leakage Detection Instrumentation by Adapting STS for C-E Plants (NUREG-1432),Spec 3.4.15 for Facilities ML17228B2861995-10-0505 October 1995 Application for Amends to Licenses DPR-67 & NPF-16,removing SR Re Dune & Mangrove Surveys from TS ML17228B2401995-08-16016 August 1995 Application for Amends to Licenses DPR-67 & NPF-16, Relocating Selected TS Requirements Re Instrumentation,Per Final Policy Statement on TS Improvements & Relocating TS Re Emergency & Security Plan Review Process Per GL 93-07 ML17228B2431995-08-16016 August 1995 Application for Amend to License NPF-16,modifying Spec 3.6.6.1, Sbvs to More Effectively Address Design Functions Performed by Sbvs for Shield Bldg & Fuel Handling Bldg,Per NUREG-1432 ML17228B1871995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Revise Action Statements & Certain Surveillances of TS 3/4.5.1 Re Safety Injection Tanks ML17228B1771995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Extend Allowed Outage Time for Inoperable EDGs ML17309A7921995-06-21021 June 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Allow Up to Seven Days to Restore an Inoperable LPSI Train to Operable Status ML17228B1451995-05-17017 May 1995 Application for Amend to License DPR-67,extending Applicability of Current RCS Pressure/Temp Limits & Maximum Allowed RCS Heatup & Cooldown Rates to 23.6 Effective Full Power Yrs of Operation ML17228B1421995-05-17017 May 1995 Application for Amends to Licenses DPR-67 & NPF-16 Re Administrative & Conforming Update ML17228B0881995-04-0303 April 1995 Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Incorporate line-item TS Improvements to TSs 3/4.8.1 & 4.8.1.2.2 ML17228B0571995-02-27027 February 1995 Application for Amend to License NPF-16,modifying Surveillance Requirement 4.9.8.1 & 4.9.8.2 to Allow Reduction in Required Min Shutdown Cooling Flow Rate Under Certain Conditions During Operational Mode 6 ML17228B0501995-02-27027 February 1995 Application for Amend to License NPF-16,revising TS Tables 3.3-3 & 3.3-4 to Accommodate Improved Coincidence Logic & Relay Replacement for 4.16 Kv Loss of Voltage Relay ML17228B0311995-02-22022 February 1995 Application for Amends to Licenses DPR-67 & NPF-16,deleting Refs to Automatic Tester for Containment Personnel Air Lock from TS 4.6.1.3 ML17228A9901995-01-20020 January 1995 Application for Amends to Licenses DPR-67 & NPF-16, Relocating Operability Requirements for Incore Detectors (TS 3/4.3.3.2) to Updated FSAR & Revising Lhr Surveillance 4.2.1.4 & Special Test Exceptions Surveillances ML17352B0001995-01-17017 January 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 6.9.1.7, COLR, Re Implementation of FPL Nuclear Physics Methodology for Calculations of COLR Parameters.Fpl Topical Rept NF-TR-95-01, Nuclear Physics Methodology... Encl ML17228A9011994-11-0202 November 1994 Application for Amends to Licenses DPR-67 & NPF-16,upgrading TS 3/4.6.2.1 & 3/4.6.2.3 by Adapting Combined Spec for Containment Spray & Cooling Sys Contained in Std TS for C-E Plants ML17309A7511994-10-27027 October 1994 Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Encl Administrative Changes ML17228A6501994-07-28028 July 1994 Application for Amends to Licenses DPR-67,revising TS 3/4.4.13 to Incorporate LTOP Requirements Similar to LTOP Requirements Recommended by NRC Via GL 90-06,in Accordance W/Resolution of Generic Issue 94 ML17228A6571994-07-25025 July 1994 Application for Amends to Licenses DPR-67 & NPF-16,revising Ts,Implementing Enhancements Recommended by GL 93-05 Re line-item TS Improvements to Reduce SR for Testing During Power Operation. ML17228A6541994-07-25025 July 1994 Application for Amend to License NPF-16,proposing TS Upgrading TS 3/4.7.1.6 for Main Feedwater Line Isolation Valves to Be Consistent w/NUREG-1432,standard TS for C-E Plants ML17228A5751994-05-23023 May 1994 Application for Amend to License DPR-67,revising TS 3.5.2 for ECCS by Removing Option That Allows HPSI Pump 1C to Be Used as Alternative to Preferred Pump for Subsystem Operability 1999-08-18
[Table view] |
Text
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION Docket No. 50-389 In the Matter of Florida Power 4 Light Company APPLICATION FOR LICENSES UNDER THE ATOMIC ENERGY ACT OF 1954 AS AMENDED for ST. LUCIE PLANT UNIT NO. 2 March , 1980
e r t t f f I ~ '4 I 4 p f ( f / p Ih t
if
FLORIDA POWER R LIGHT COMPANY APPLICATION FOR OPERATING LICENSE AND OTHER APPROPRIATE LICENSES AS REQUIRED General Information
- 1) Name of A licant Florida Power 4 Light Company
- 2) Address of A licant 9250 W. Flagler Street (P. O. Box 529100 Miami, Florida Miami, Florida 33152)
- 3) Descri tion of Business and Or anization of A licant Applicant is engaged in the electric utility business in the State of Florida. Applicant provides electric service in most of the territory along the east and lower west coasts of Florida including the Cape Canaveral area, the agricultural area around southern and eastern Lake Okeechobee, and portions of central and north central Florida (except most of the Jacksonville area, most of two other municipalities, and all of six other municipalities which have municipal systems).
As of December 31, 1979, Applicant served a total of 2,140,587 customers. As of the same date, net utility plant after depreciation was $ 4,421,847,000 including nuclear fuel in process of refinement, conversion, enrichment and fabrication. Revenues for the year ending December 1979 were $ 1,933,937,000.
Applicant is a corporation duly authorized and existing under the laws of the State of Florida. The names and post office addresses of its directors and principal officers, all of whom are citizens of the United States, are as follows:
~ I ~
" aa'
~ ' II ru II ~ Ir IVr -" I Ir I ~ rr ~
~ I s w. rt ~
~ lice
~ tr I ~
NAMES AND ADDRESSES OF DIRECTORS M. P. Anthony, President, Anthony', Inc., Post Office Box 2886, West Palm Beach, Florida 33402 George F. Bennett, President, State Street Investment Corporation, 225 Franklin Street, Boston, Massachusetts 02110 David Blumberg, President, Planned Development Corporation, 1440 Brickell Avenue, Miami, Florida, 33131 Jean McArthur Davis, President, McArthur Dairy, Inc., 6851 N.E. 2 Avenue, Miami, Florida 33138 John J. Hudiburg, President, Florida Power R Light Company, 9250 West Flagler Street, Post Office Box 529100, Miami, Florida 33152 Robert B. Knight, 220 Arvida Parkway, Coral Gables, Florida 33156 John M. McCarty, 111 Boston Avenue, Ft. Pierce, Florida 33450 Marshall McDonald, Chairman of the Board, Florida Power R Light Company, 9250 West Flagler Street, Post Office Box 529100, Miami, Florida 33152 Ed H. Price, Jr. President, The Price Company, Inc. (Ellis First National Bank Building of Bradenton, Suite 0417), Post Office Box 9270, Bradenton, Florida 33506 Lewis E. Wadsworth, Post Office Box 428, Bunnell, Florida 32010 Gene A. Whiddon, President, Causeway Lumber Company, Inc., Post Office Box 21088, Ft. Lauderdale, Florida 33335 NAMES AND ADDRESSES OF OFFICERS Marshall McDonald Chairman of the Board J. J. Hudiburg President E. A. Adomat Executive Vice President H. L. Allen Senior Vice President D. K. Baldwin Vice President E. L. Bivans Vice President M. C. Cook Vice President B. L. Dady Vice President
- Assistant Secretary H. J. Dager, Jr. Vice President Tracy Danese Vice President J. H. Francis, Jr. Vice President R. J. Gardner Vice President L. C. Hauck Vice President J. L. Howard Vice President R Treasurer L. C. Hunter Senior Vice President W. M. Klein Vice President A. D. Schmidt Vice President J. G. Spencer, Jr. Senior Vice President R. E. Talion Group Vice President R. E. Uhrig Vice President R. W. Wall, Jr. Senior Vice President R Assistant Secretary
~>
h 1
' ~
~ ~l e( /"
~
j f ~ ~>Rgb<,I
$~
~ g $ ~ pl 3 1 ~ I )l 'l (4~ J ~ ~
>t
~
~ I( ( e
'lV. 'a ~
C 1
Astrid Pfeiffer Secretary H. P. Williams, Jr. Comptroller T. R. Crook, Jr. Assistant Comptroller R. A. Anderson Assistant Treasurer S. P. Kemp Assistant Secretary J. E. Moore Assistant Secretary The address of the above Officers is 9250 West Flagler Street, Post Office Box 529100, Miami, Florida 33152.
Applicant is not owned, controlled, or dominated by an alien, a foreign corporation, or a foreign government, and is not acting as agent or representative of any other persons in making this Application. The Applicant's stock transfer agent has certified that as of the close of business December 31, 1979, records indicate that 173 foreign stockholders held 68,391.81 shares of common stock. Foreign stockholders constituted 0.48% of total common shareholders and foreign-held stock constituted 0.16% of total common shares outstanding.
- 4) Class and Period of License A lied for Applicant requests a class 103 operating license for a period of 40 years from date of issuance. Applicant requests such additional source, special nuclear and by-product material licenses as may be necessary 4
and appropriate to the operation of this facility.
- 5) Descri tion of Facilit and Use to Which Facilit Will Be Put Applicant proposes to operate a nuclear reactor which will supply a turbine generator with a capability of 890 Mwe gross with associated transformer, switchyard, supporting buildings and additional auxiliary systems and facilities as required for a Unit No. 2 output of 802 Mwe net. The nuclear steam supply system is a pressurized water reactor whose maximum output is 2700 Mwt. The design of the balance of plant and related facilities will be such as to accommodate the maximum
~ ~ ~
dl A
~ t Ig
'T t (
H t4 gc
thermal output of the nuclear steam supply system, consequently the major systems and components which bear significantly on the acceptability of the site, including the engineered safeguards systems and the containment, have been evaluated for operation at a power level of 2700 Mwt. This project will be located on Hutchinson Island on the east coast of Florida. The project, (Units 1 4 2) and possible future additions wiH occupy approximately 100 acres of the site: the remainder will be set aside for a conservation development program.
Attached hereto and made a part hereof is a Final Safety Analysis Report and an Environmental Report - Operating License which contain a description of the site and the facility; an analysis and evaluation of structures, systems, and components; and other material in accordance with the r'equirements of Sections 50.34 and 51.21 of the regulations of the Nuclear Regulatory Commission.
The proposed power plant is a necessary part of Applicant's continuing expansion of its facilities to provide for a steadily increasing demand for electric power by its customers.
- 6) Financial Qualifications Applicant's 1979 Annual Report and Financial R Statistical Report are set forth in attached Exhibit I.
The entire cost of the Applicant's share of the project will be paid for by Applicant from funds available from normal and regular sources for construction of additions to all types of its utility properties. Such funds are (1) treasury funds on hand; (2) funds available from internal sources, principally retained earnings, deferred taxes, investment tax credits - net and provisions for depreciation; (3) short term bank loans
~<)'i iiiV flail'i~ p)q(g ~
g
~
() ~ ) I(( /$ f,. "'
s s" ~
- I," ft x I I ~ >
" C'
and commercial paper; and (4) the sale of permanent securities when and as required.
Attached hereto as Exhibit 11 is a tabulation of the estimated cost of operating the facility.
At the end of the plant's useful lifetime, FPL will prepare a proposed decommissioning plan based on the available information and requirements. FPL has given serious consideration to the matter to date and estimates a decommissioning cost of approximately
$ 100,000,000. However, in order to maintain some degree of flexibility among the various decommissioning options, no specific plan has been chosen.
Applicant is able to borrow on a short term basis at the prime rate of interest or less. Bond issues sold since 1974 have been rated A by Moody's Investors Service and A+ by Standard R Poor's Corporation (A since 1971, A+ since 1978).
Applicant will obtain appropriate property and liability insurance for this project and its fuel.
The above demonstrates Florida Power R Light Company's ability to obtain the funds necessary to cover the estimated costs of operation plus the estimated costs to safely decommission the facility.
- 7) Technical Qualifications Applicant has in operation two nuclear power units of 666 Mwe capacity each, known as Turkey Point Units No. 3 and No. 4, one nuclear power unit of 777 Mwe capacity known as St. Lucie Unit No. 1.
The extensive training program for engineering and operating personnel for the Turkey Point Project and St. Lucie Unit 01 has been expanded and continued as required to train personnel for St. Lucie Plant Unit 82.
I
)
gf ~ I ~~ I~ ~ ~ ill~~ " 'l ~ I'p $ g g )lp> )EJ ~, f II~
gw>p +s>c\> w ~ fo onl
('f ~
~ ' %A FI C" ~,ltl ~ e
~A~ ~
~ I, gq g~q p ~ 1I ~
J,,f r <9 i's< t >A>
I II
Applicant has contracted with Combustion Engineering Corporation to design and fabricate the nuclear steam supply system. The turbine generator will be supplied by Westinghouse Electric Corporation.
Ebasco Services Incorporated will provide engineering and procurement services for the majority of items not furnished by Combustion Engineering and Westinghouse. Florida Power R Light will be responsible for construction services and the administration of the Ebasco, Combustion Engineering and Westinghouse Contracts.
Combustion Engineering will supply the initial core (Batches A, B, and C) as well as Batches D, E, and F.
The technical qualifications of Combustion Engineering and Ebasco are summarized in Exhibit IH attached.
The fuel load date of this unit is estimated to be October 30, 1982; the expected commercial operation date is estimated to be May 30, 1983.
- 9) Re lator A encies The regulatory agencies having jurisdiction over the rates and services incident to the proposed activity is:
Federal Energy Regulatory Commission 825 North Capitol Street, N.E.
Washington, D.C. 20426 Florida Public Service Commission 101 East Gaines Street Tallahassee, Florida 32304
~Jv ax ~ k a
'I, V
H 'I
~ -v ~
H' 4 f< qigvw
~
~
P
~ C- e~
I 4>i i 4 ~ PJ ll g +
f l
- 10) Publications Circulated in the Area (a) Trade Publications:
ELECTRIC LIGHT R POWER 1301 South Grove Avenue Barrington, Illinois 60010 ELECTRICAL SOUTH 1760 Peachtree Road; N.W.
Atlanta, Georgia 30309 ELECTRICAL WORLD 1221 Avenue of the Americas New York, New York 10020 (b) Daily News Publications:
COMMERCIAL RECORD 416 Clematis St.
West Palm Beach, Florida 33402 NEWS TRIBUNE P. O. Box 69 Fort Pierce, Florida 33450 PALM BEACH DAILY NEWS 265 Royal Poncianna Palm Beach, Florida 33480 PALM BEACH POST 2751 South Dixie Highway West Palm Beach, Florida 33402 PALM BEACH TIMES 2751 South Dixie Highway West Palm Beach, Florida 33402 MELBOURNE TIMES 2015 South Waverly Place Melbourne, Florida 32901 THE MIAMIHERALD 1 Herald Plaza Miami, Florida 33101 BOCA RATON NEWS P.O. Box 580 Boca Raton, Florida 33432
I
~.
f It i@)"'f "J~
y lyons 044 4a'tl Ir I ~
~ jjg I'
(c) Weekly News Publications:
COURIER HIGHLIGHTS P.O. Box 1486 Jupiter, Florida 33458 JENSEN BEACH MIRROR P.O. Box 787 Jensen Beach, Florida 33457 VERO BEACH PRESS-JOURNAL P.O. Box 1268 Vero Beach, Florida 32960
- 11) Restricted Data Pursuant to Section 50.37, Applicant agrees not to permit any individual to have access to Restricted Data until the Civil Service Commission shall have made an investigation and report to the Commission on the character, associations, and loyalty of such individual, and the Commission shall have determined that permitting such person to have access to Restricted Data will not endanger the common defense and security.
- 12) Communications All communications to Applicant pertaining to this Application should be sent to Dr. R. E. Uhrig, Vice President, Florida Power
- Light Company, P.O. Box 529100, Miami, Florida 33152, with a copy to Mr.
Harold Reis of Lowenstein, Newman, Reis, Axelrad
FLORIDA POWER R LIGHT COMPANY By R. E. Uhr ig
f>> ~ l g I
lg( ~ g ~ tl g II d
~r,
STATE OF FLORIDA )
) ss COUNTY OF DADE )
R. E. Uhrig, being first duly sworn, deposes and says: That he is Vice President of FLORIDA POWER 4 LIGHT COMPANY, the Applicant, herein; and that the statements made in this Application are true and correct to the best of his knowledge, information and belief; and that he is authorized to execute the Application on behalf of said Applicant.
DATED: This 25th day of March, 1980.
Signed Subscribed and sworn to before me this 25th day of March, 1980.
Notary Public in and for the County of Dade, State of Florida NOTARY PVBUC STATE 0Ã FLORIDA at LARCE'Y COMMISSION EXPIRES AVOVST 24, 1SS1 My Commission expires BDNDEQ 7HRU MAYNABD QDIIDL'tQ AGENCY