Summary of 800214 & 15 Site Visit & Meeting W/Util Re Caseload Forecast.Plant Const Status & Schedule Discussed
ML17207A882
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/22/1980
From: Birkel R
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8003130667
Download: ML17207A882 (14)


Text

Meetin Summar Docket File NRC PDR Local PDR TIC NRR Reading

'WR 82 File E.

Case D.

F.

Ross D.

B. Vassallo S.

A. Varga D. Skovholt W. Gamnill J. Stolz R.

Baer

0. Parr L. Rubenstein C. Heltemes W. Haass R. Houston L. Cnocker F..J. Williams R. J. Mattson R.

DeYoung Project Manager Attorney, ELD-J.

Lee IE(3)

ACRS(16)

J. Rothfleisch T; Abell G. Matthews S.

Boyd L. Schaub R.

A. Bi.rkel W. Paton T. Murphy J. Knight S.

Hanauer R. Tedesco R.

Bosnak S. Pawlicki F. Schauer K. Kniel T. Novak Z. Rosztoczy W. Butler V. Benaroya R. Satterfield V. Moore M. Ernst F.

Rosa R.

P.

Denise EP Branch Chief G.

Chipman J. Collins W. Kreger G. Lear B. Youngblood L. Hulman NRC

Participants:

T.

Cox B. Lovelace R. Bradley ssoszss Gag

DOCKET NO. 50-389 APPLICANT; FLORIDA POHER AND LIGHT COMPANY FACILITY:

ST. LUCIE PLANT, UNIT NO.

2

SUBJECT:

SUMMARY

OF CASELOAD FORECAST PANEL VISIT TO ST. LUCIE, UNIT NO.

2 On February 14 and 15, 1980 members of the NRC staff (the Caseload Forecast Panel) met with the applicant at the St. Lucie site to review the bases for the Unit 2 construction schedule.

Attendees at the meeting are given in Enclosure l.

The agenda of the meeting is given in Enclosure 2.

The applica'nt described the plant construction status and schedule.

Enclosure 3

is a sugary of the monthly production report for the period ending January 31, 1980.

As of January 31, 1980, construction was approximately 35K completed.

Major construction schedule milestones are as follows:

1.

START -

R. C. B. Base Mat Concrete (7-6-77) 2.

START-3.

START-4.

START.-

Intake Structure Base Mat Concrete (10-15-77)

T. G. Pedestal Hat Concrete (12-15-77)

Erect Steel Containment Vessel (1-18-78) 5.

START -

R. A. B. Base Mat Concrete (2-10-78) 6.

COMIPLETE -

Erect and Test Steel C. V. to Elevation +149.0 (12-6-78) 7.

START -

H. S. T. Steel Erection (12-28-78) 8.

START -

R. C. B. Internal Concrete (1-17-79) 9.

START -

F. H. B. Base Mat Concrete.(5-5-79) 10.

START -

Preoperational Testing (4-20-78) 11.

START -

Setting N. S. S. S. Major Equipment (SG's, R. V. and Pressurizers)

(6-18-80) 12.

COMMENCE -

Cold Hydrostatic Test (3-17-82) 13.

START -

Hot Operation Test No.

1 (7-3-82) 14.

COMlIIENCE -

Core Loading (10-28-82) 0 OFFICE)

SURNAME OATEN NRC FORM 318 (9 76) NRCM 0240

+U S GOVERNMENT PRINTING OFFICE: 1979'289 369

I 1

16.

COMMENCE -

Power Escalation (1-5-83) 17.

100$ Power Plateau (4-3-83)

After touring the plant and conducting discussions with the applicant, the staff panel concluded that in its opinion the St. Lucie Plant, Unit 2 would not be ready to load fuel no sooner than November/December 1983.

This estimate is based on the following considerations:

1.

The setting of the reactor vessel is now scheduled for October 1980.

The industry median from this milestone to fuel loading, is 47 months.

2.

Comparison of this project to others (Palo Verde, San Onofre, Callaway, and 'Haterford).

Ofj~jII0jsjgII0jfgjy

Enclosures:

l.

Attendance List 2.

Agenda 3.

Monthly Production Report Ralph A. Birkel Light Mater Reactors Branch No.

2 Division of Project Management

...PPA'N..N.

RLBaer

.RABivkel'.ab

..zp780.

2+80

'ATE oF IcE

.DPHIL NR..N..

NRC FORM'318 (0~76) NRCM 0240 a

4,UD. 'GOVERNMENT PRINTINQ OFFICCc 1'919-209-369'<

~

Ifl N

-f 1

h

~

A

~l" I

14 E

K

~

I L

,v p Qy.a

~ 1'1 I

6 pP IV

Or. Robert E. Uhrig Vice President of Nuclear and General Engineering Florida Power 8 Light Company P.

0.

Box 529100 Miami, Florida 33152 cc:

Jack R.

Newman, Esq.

Lowenstein,

Newman, Reis 8 Axelrad 1025 Connecticut
Avenue, N.

W.

Rashington, D. C.

20036 Norman A. Coll, Esq.

tCCarthy, Steel, Hectory 8 Davis 14th Floor, First National Bank Building Miami, Florida 33131 Mr. Martin H. Hodder 1131 N. E.

86 Street Miami, Fl orida 33138 Edward Luton, Esq.,

Chairman Atomic Safety and Licensing Board U. S.

Nuclear Regulatory Commission

. Mashington, D. C.

20555 Dr. David L. Hetrick Professor of Nuclear Engineering The University of Arizona Tucson, Arizona 85721 Dr. Frank F.

Hooper School of Natural Resources University of Michigan Ann Arbor, Michigan 48104

l

p)9 0 'r 1980 ENCLOSURE 1

ATTENDANCE LIST MEETING WITH FLORIDA POWER AND LIGHT COMPANY FEBRUARY 14 AND 15 1980 FLORIDA POWER AND LIGHT COMPANY J. R. Pendland J.

W. Briskin H. M. Hayward B. Escue R. Schweikart W. Windecker G. Bradshaw J. Williams*

J. Jantac*

EBASCO B.

W. Whitfie1d E. Meinzinger L. Toakiris E. Zuckman J.

D. Distel L. Pelosi NRC - STAFF T. Cox B. Lovelace R. D. Bradley R. A. Birkel

  • FEBRUARY 15 MEETING ONLY

t t

(I l

/g FEB P 3 1980 ENCLOSURE 2

ST.

LUCIE UNIT NO.

2 NRC CASELOAD REVIEW AGENDA THURSDAY & FRIDAY, FEBRUARY 14 6 15~

1980 THURSDAY, FEBRUARY 14, 1980 ITEM NO.

DESCRIPTION Wo B. DERRICKSON OPENING REMARKS 2 ~

3.

G BRADSHAW B. J.

ESCUE R. 'CHWEIKAR.

PROJECT CONSTRUCTION SCHEDULEq CURRENT PROBLEMS AND SCHEDULE FOR LICENSING CONSTRUCTION ORGANIZATION INSTALLED QUANTITIES, PERCENT COMPLETE AND AVERAGE INSTALLATION RATES a.

J DISTEL CURRENT STATUS OF PIPING, INCLUDING DESIGN AND PROCUREMENT 5.

W. WINDECKER PRE-OP TEST PROCEDURE WRITINGS SYSTEM TURNOVER AND PRE-OP TEST SCHEDULEi PR '-OP TEST PROGRAM MANPOWER 6.

R.

SCHWEIKART REVIEW"CRITICAL PATH ACTIVITIES TO FUEL LOAD, RECOVERY PLAN 7 ~

R.

SCHWEIKART PROJECT PERCENT COMPLETELY SCHEDULE METHODOLOGY~

MATERIAL TRACKING SYSTEMS 13.

B. J; ESCUE J

THOMPSON SITE TOUR - CONSTRUCTION ACTIVITIES 9.

D BRAATZ 10.

L.. TSAKIRIS/

E.

ZUCHMAN FRIDAY~ FEBRUARY 15, 1980 8.

J WILLIAMS COMMENTS ON NEED FOR POWER COMMENTS ON FINANCIAL COMMITMENTS REVIEW AND STATUS OF DESIGN ENGINEERING 12.

J DISTEL J.

THOMPSON REVIEW AND STATUS OF PROCUREMENT ORGANIZATION CRAFT WORK FORCE~ AVAILABILITY~PRODUCTIVITY~

NEGOTIATIONS, ETC'

t 1

iI 1t i

if't k

ll I

period EndIng Januar 31 1980 ST. LUCIE UNIT2 MONTHLYPRODUCTION REPORT FEB 3 < 198O ENCLOSURE 3 Page of~

1 I

co z

DESCRIPTION NRC ITEM NUMBER ESTIMATE CURRENT PERIOD TO-DATE PRODUCTION TOTAL PROBABLE PHY COMP.

RATE 0-'0%

DURATT TOTAL PROJ,.

TOTAL DATE TO ROJECT

TO' "AVERAGE INSTALLATION, Concrete 3-A 125,925 8,169 104,801 139,775 61.7 3,490 3,110 LF TN Piping 2"

& Under Whipping Restraints 3-B,C&E 3-D 177,365 665 545 11,958 28 181,772 665

12. 3 6.3 7,310 30 EA Valves 24"

& Above.

Han ers 2'

& Above 3-D 3-D

'2 122 5 398 13 103 142 1 029 2 042 5 349 20.0

16. 3 120 80 190 LF LF

.F LF LF LF LF EA

$857e trays'xoosed Conduit Undesigned Conduit Lighting Conduit Control Cable P

lin Power Li htin Wire & Acc Control Cable T.

a~

Power Cable Term.

Power Cable Term.

Hi h Volta e-3-F 3-G&H 3-G&H 3-G&H 3-I 3-J 3-J 45,000 106 400 00 127,900 100 000 140 OuO 370 000 450 2,821 1 537 252 2 744 1 500 11,401 10 040 115 495 48 117 14 740 57 661 45,000 106 400 133 624 69,976 100,214 3 140.000 00 000 370 000 20 000 459 28.7 2,300 8.3 83.0 8 840 48.4

.5 15.9 6 890

.2 2 250 9

110 25 600 26 670 11 840 5 650 60 20 15 EA Circuits Instruments 3-K 3-L 12 500 1 906 FURNISHED BY N.Y EBASC 1 950 90

C

~